Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
28.04.2024 - 01:35
Time of last synchronization with Norwegian Offshore Directorate's internal systems

MARTIN LINGE

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    MARTIN LINGE
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Producing
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    1978
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    North sea
    Main supply base
    Main supply base
    Tananger/Dusavik
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    21675447
  • Picture

    Picture
    MARTIN LINGE Field
  • Discoveries included

    Discoveries included
    Discovery name
  • Activity status – history

    Activity status – history
    Status
    Status from
    Status to
    Producing
    30.06.2021
    Approved for production
    11.06.2012
    29.06.2021
  • Located in

    Located in
    Block name
    Prod. licence
    29/6
    30/4
    30/7
    29/6
    29/9
    30/4
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    03.07.2017
    PUD fritak Herja/Herv
    PDO
    11.06.2012
    Behandlet i Stortinget
    PDO
  • Owner – current

    Owner – current
    Owner kind
    Owner name
    BUSINESS ARRANGEMENT AREA
  • Operatorship – current

    Operatorship – current
    Company name
  • Licensees – current

    Licensees – current
    Company name
    Nation code
    Company share [%]
    NO
    51.000000
    NO
    30.000000
    NO
    19.000000
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    7.70
    16.40
    1.09
    0.00
    26.17
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    27.00
    9.00
    1.00
    29.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    3.62
    11.00
    0.70
    0.00
    15.95
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Martin Linge is a field located near the border to the UK sector in the northern part of the North Sea, 42 kilometres west of the Oseberg field. The water depth is 115 metres. Martin Linge was discovered in 1978, and the plan for development and operation (PDO) was approved in 2012. The development concept is a fully integrated fixed production platform and a floating storage and offloading unit (FSO) for oil storage. The installation is supplied with power from shore. A PDO exemption for the Herja discovery and the Hervor prospect was granted in 2017. The production started in 2021.
    13.12.2023
    Reservoir
    Martin Linge produces mainly gas and condensate from sandstone of Middle Jurassic age in the Brent Group. The reservoirs are structurally complex with high pressure and high temperature (HPHT) at depths of 3700-4400 metres. In addition, oil is produced from the Frigg Formation of Eocene age. The Frigg reservoir is at a depth of 1750 metres and has good quality.
    13.12.2023
    Recovery strategy
    The gas is produced by pressure depletion. Oil from the Frigg reservoir is produced by natural aquifer drive and gas lift. Some produced water is reinjected.
    28.02.2023
    Transport
    Rich gas is transported to the Frigg UK pipeline (FUKA), and on to the Shell-Esso Gas and Liquid (SEGAL) terminal at St Fergus in the UK. Oil and condensate are exported via tankers from the FSO.
    28.02.2023
    Status
    New 4D seismic data gathered in July 2023 will provide additional information for updating reservoir models and estimates of in-place volumes and reserves. Work is ongoing to prepare for the second drilling campaign on Martin Linge which is planned to start in early 2024.
    13.12.2023
  • Investments (expected)

    Investments (expected)
    The operators future investments related to the reservers from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    3461
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    57515
    2022
    1077
    2021
    6124
    2020
    7368
    2019
    6966
    2018
    6469
    2017
    5322
    2016
    6452
    2015
    7639
    2014
    5594
    2013
    2740
    2012
    1362
    2011
    187
    2010
    0
    2009
    23
    2008
    117
    2007
    0
    2006
    75
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
    Sum
    4.299164
    5.651085
    0.000000
    0.604826
    10.555075
    2024
    0.168687
    0.291308
    0.000000
    0.036291
    0.496286
    2023
    1.214638
    1.818519
    0.000000
    0.210590
    3.243747
    2022
    2.029928
    2.628125
    0.000000
    0.275953
    4.934006
    2021
    0.885911
    0.913133
    0.000000
    0.081992
    1.881036
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
    Sum
    4.299139
    5.999854
    0.000000
    10.298993
    2024
    0.168687
    0.314182
    0.000000
    0.482869
    2023
    1.214638
    1.946138
    0.000000
    3.160776
    2022
    2.029928
    2.776131
    0.000000
    4.806059
    2021
    0.885886
    0.963403
    0.000000
    1.849289
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    12.10.1981
    09.05.1982
    WILDCAT
    P&A
    GAS/CONDENSATE
    23.09.1983
    24.02.1984
    APPRAISAL
    P&A
    OIL/GAS
    16.11.1979
    16.05.1980
    APPRAISAL
    P&A
    GAS/CONDENSATE
    16.06.2016
    09.10.2016
    WILDCAT
    RE-CLASS TO DEV
    GAS/CONDENSATE
    06.08.1975
    09.11.1975
    WILDCAT
    P&A
    OIL/GAS
    18.04.1978
    03.06.1978
    WILDCAT
    P&A
    GAS/CONDENSATE
    19.11.1980
    04.04.1981
    APPRAISAL
    SUSPENDED
    GAS/CONDENSATE
    23.09.1981
    29.01.1982
    APPRAISAL
    P&A
    GAS/CONDENSATE
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
    11.11.2014
    04.11.2015
    INJECTION
    WATER
    23.09.2014
    09.02.2015
    OBSERVATION
    OIL
    11.02.2015
    04.08.2015
    PRODUCTION
    NOT APPLICABLE
    05.08.2015
    13.08.2015
    PRODUCTION
    OIL
    05.11.2014
    16.09.2015
    PRODUCTION
    OIL
    PRODUCTION
    NOT APPLICABLE
    18.11.2014
    19.03.2015
    OBSERVATION
    OIL
    21.03.2015
    20.04.2015
    PRODUCTION
    OIL
    06.10.2014
    10.04.2016
    PRODUCTION
    GAS
    16.06.2016
    09.10.2016
    PRODUCTION
    GAS
    15.10.2014
    01.12.2015
    PRODUCTION
    GAS
    12.08.2021
    04.01.2022
    PRODUCTION
    GAS/CONDENSATE
    30.03.2017
    26.06.2017
    PRODUCTION
    GAS
    10.05.2018
    01.02.2021
    PRODUCTION
    GAS/CONDENSATE
    07.10.2021
    11.02.2022
    PRODUCTION
    GAS/CONDENSATE
    30.03.2021
    29.07.2021
    PRODUCTION
    GAS/CONDENSATE
    19.05.2018
    05.11.2020
    PRODUCTION
    GAS
    19.09.2009
    22.02.2010
    OBSERVATION
    GAS/CONDENSATE
    23.02.2010
    31.03.2010
    PRODUCTION
    GAS/CONDENSATE
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    23.11.2013
    25.11.2013
    SHALLOW GAS
    PLUGGED