KNARR
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toShut down01.05.2022Producing16.03.201530.04.2022Approved for production09.06.201115.03.2015 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType09.06.2011Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE09.06.201131.12.2022 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to25.05.201631.12.202209.06.201124.05.2016 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO45.00000031.01.202231.12.2022NO30.00000031.01.202231.12.2022NO25.00000031.01.202231.12.2022NO45.00000013.11.201930.01.2022NO30.00000013.11.201930.01.2022NO25.00000013.11.201930.01.2022NO45.00000031.08.201612.11.2019NO25.00000031.08.201612.11.2019NO20.00000031.08.201612.11.2019NO10.00000031.08.201612.11.2019NO45.00000013.03.201530.08.2016NO25.00000013.03.201530.08.2016NO20.00000013.03.201530.08.2016NO10.00000013.03.201530.08.2016NO45.00000024.03.201212.03.2015NO25.00000024.03.201212.03.2015NO20.00000024.03.201212.03.2015NO10.00000024.03.201212.03.2015NO45.00000009.06.201123.03.2012NO25.00000009.06.201123.03.2012NO20.00000009.06.201123.03.2012NO10.00000009.06.201123.03.2012 -
Description
Description TypeTextDate updatedDevelopmentKnarr is a field in the northern part of the North Sea, 50 kilometres northeast of the Snorre field. The water depth is 400 metres. Knarr was discovered in 2008, and the plan for development and operation (PDO) was approved in 2011. The Knarr field consists of two segments, Knarr West and Knarr Central. The development comprised a floating production, storage and offloading vessel (FPSO) and two subsea templates, including six production and injection wells. The production started in 2015.09.12.2023ReservoirKnarr produced oil from Lower Jurassic sandstone in the Cook Formation. The reservoirs are at a depth of 3800 metres and have moderate to good quality.09.12.2023Recovery strategyThe field was produced with water injection for pressure maintenance.28.02.2023TransportOil was processed and stored on the Knarr FPSO and offloaded to shuttle tankers for export. Gas was exported via the Far North Liquids and Associated Gas System (FLAGS) to St Fergus in the UK.28.02.2023StatusKnarr was shut down in 2022 and the FPSO was removed from the field. Decommissioning of the subsea facilities must be completed by 2028.09.12.2023 -
Investments (expected)
Investments (expected) -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum14205202252021-820206482019652018272017222016020151206201452612013490520121540201153420100 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum9.6043490.4194920.0000001.39212511.4159660.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.1423380.0038780.0000000.0080850.1543010.5712930.0189730.0000000.0568050.6470710.8991400.0342540.0000000.1056901.0390840.6990680.0235270.0000000.0763170.7989121.0049620.0346310.0000000.1290991.1686922.2853110.1217910.0000000.4143792.8214812.7337680.1415770.0000000.4795563.3549011.2684690.0408610.0000000.1221941.431524 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum9.6532751.1305030.00000010.7837780.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.1423380.0192410.0000000.1615790.5712930.0700190.0000000.6413120.8991400.1023340.0000001.0014740.6990680.0827090.0000000.7817771.0049620.1090750.0000001.1140372.2853110.2594300.0000002.5447412.7337680.3247100.0000003.0584781.3173950.1629850.0000001.480380 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
-
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent26.07.201315.04.2014PRODUCTIONOIL23.07.201303.06.2014PRODUCTIONOIL27.02.202014.05.2020PRODUCTIONOIL19.07.201305.10.2014PRODUCTIONOIL04.11.201324.07.2014INJECTIONWATER03.11.201325.03.2014INJECTIONWATER30.10.201313.03.2014INJECTIONWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus11.07.201312.07.2013SHALLOW GASPLUGGED20.11.201321.11.2013SHALLOW GASPLUGGEDSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLINGSOIL DRILLING