1093
Export: PDF
-
General information
-
Phases
Phases Date phase valid fromDate phase valid toPhase19.02.202119.02.2028INITIAL20.02.202819.02.2029INITIAL EXTENDED -
Licensees — current
Licensees — current Date valid fromCompany longnameInterest [%]11.12.202450.000000-30.000000-20.000000 -
Operatorship — current
Operatorship — current Date valid fromCompany longname11.12.2024 -
Area – current
Area – current Date valid fromBlock namePolygon numberPolygon area
[km2]Vertical limitations19.02.202116/84108-16/4138-16/63144-16/95398-16/52259 -
Work program (initial phase)
Work program (initial phase) Work obligationDecisionTask statusExpiry dateWellbore if drilledStudy of geology and geophysicsIn processAcquire 3D seismicIn processDrill exploration wellIn processDecision to drillIn process19.02.2025(BoK) Decision to concretizeIn process19.02.2026Conceptual studiesIn process(BoV) Decision to continueIn process19.02.2028(PDO) Prepare plan for developmentIn process(PDO) Submit plan for developmentIn process19.02.2029Decision to enter extension periodIn process19.02.2029 -
Conditions (production phase)
Conditions (production phase) Work taskDecisionDescription (norwegian)Task statusExpiry date -
Mortgages from the Petroleum register – current (in Norwegian only)
Mortgages from the Petroleum register – current (in Norwegian only) Dokument nummerRegistreringsdatoUtdrag av dokument1865123.07.2024Lime Petroleum AS pantsetter sin 20 % deltakerandel i tillatelsen til fordel for Lime Petroleum Holding AS. Pantobligasjon stor NOK 960 000 000, skriver norske kroner nine hundred and sixty million.Pantsetter har ikke rett til å overdra eller foreta ytterligere pantsettelser av pantsatte objekt uten skriftlig samtykke fra panthaver.Energidepartementet har i brev av 15.07.2024 gitt samtykke i medhold av petroleumsloven § 6-2 første ledd. Pantsettelsen utgjør et såkalt krysspant. -
Wellbores – exploration, drilled in the production licence
Wellbores – exploration, drilled in the production licence Wellbore nameEntered dateCompleted datePurposeContent -
Wellbores – development, drilled in the production licence
Wellbores – development, drilled in the production licence Wellbore nameEntered dateCompleted datePurpose - planned -
Wellbores – other, drilled in the production licence
Wellbores – other, drilled in the production licence Wellbore nameEntered dateCompleted datePurpose -
Licensees — full history
Licensees — full history Date valid fromDate valid toCompany longnameInterest [%]11.12.202450.00000030.00000020.00000024.10.202210.12.202450.00000030.00000020.00000019.02.202123.10.202250.00000030.00000020.000000 -
Operatorship — full history
Operatorship — full history Date valid fromDate valid toCompany longname11.12.202424.10.202210.12.202419.02.202123.10.2022 -
Area – full history
Area – full history Date valid fromDate valid toBlock namePolygon numberPolygon area
[km2]Vertical limitations19.02.202116/8410816/413816/6314416/9539816/52259 -
Licensees – transfers
Licensees – transfers Date valid fromTransfer directionType of changeCompany nameTransferred interest [%]11.12.2024FROMMERGER/TAKEOVER50.000000TOMERGER/TAKEOVER50.00000024.10.2022TOCHANGE OF COMPANY NAME50.000000FROMCHANGE OF COMPANY NAME50.000000 -
Status reports
Status reports Document nameDocument formatDocument size [MB]