Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
02.05.2025 - 00:22
Time of last synchronization with Norwegian Offshore Directorate's internal systems

Table – Palynological slides

Export:  EXCELOPENXML icon EXCEL XML icon XML CSV icon CSV

Only the first 300 rows are displayed here. All rows will be included upon "Export".

This table is large and will normally take 1-2 minutes to 'Export'.
Wellbore
Sample depth
Depth unit
Sample type
Laboratory
WDSS QC date
Date sync NOD
1/2-1
3163.1
[m]
C
HYDRO
19.12.2007
02.05.2025
1/2-1
8880.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
8940.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9000.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9060.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9120.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9180.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9240.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9300.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9363.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
9420.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9480.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9540.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9585.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
9600.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9660.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9684.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
9720.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9780.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9840.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9900.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9930.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
9960.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
9990.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
10020.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10050.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10080.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10110.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10140.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10170.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10200.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10229.9
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10276.3
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10308.6
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10339.3
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10362.0
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10369.3
[ft]
C
SSI
19.12.2007
02.05.2025
1/2-1
10400.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10460.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10490.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10520.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10580.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10640.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10700.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10744.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
10780.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10810.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10850.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
10880.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/2-1
10910.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10940.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
10970.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
11000.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
11030.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
11060.0
[ft]
DC
SSI
19.12.2007
02.05.2025
1/2-1
11091.0
[ft]
SWC
SSI
19.12.2007
02.05.2025
1/3-1
4510.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
4780.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
5170.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
5440.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
5740.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
6070.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
6280.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
6600.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
6860.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
7140.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
7400.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
7690.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
7960.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
8240.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
8550.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
8800.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
9060.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
9350.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
9570.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
9780.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
10080.0
[ft]
DC
UNIVSHEF
30.04.2010
02.05.2025
1/3-1
10140.0
[ft]
DC
UNIVSH
30.04.2010
02.05.2025
1/3-1
10270.0
[ft]
DC
UNIVSH
30.04.2010
02.05.2025
1/3-1
10330.0
[ft]
DC
UNIVSH
30.04.2010
02.05.2025
1/3-1
10390.0
[ft]
DC
UNIVSH
30.04.2010
02.05.2025
1/3-1
10600.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
10810.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
11370.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
11680.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
11980.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
12210.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
12490.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
12780.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
13060.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
13350.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
13560.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
13840.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
14050.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
14310.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
14590.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
14850.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
15100.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
15310.0
[ft]
DC
30.04.2010
02.05.2025
1/3-1
15560.0
[ft]
DC
30.04.2010
02.05.2025
1/3-3
3885.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3895.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3905.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3915.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3925.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3935.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3945.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3955.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3965.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3975.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3985.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
3995.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
4005.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
4015.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
4045.0
[m]
DC
GEOST
30.04.2010
02.05.2025
1/3-3
4050.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4055.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4060.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4065.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4070.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4075.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4080.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4085.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4090.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4095.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4100.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4105.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4110.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4115.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4120.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4128.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4129.0
[m]
C
GEOSTR
30.04.2010
02.05.2025
1/3-3
4129.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4129.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4130.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4130.5
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4131.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4132.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4133.0
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4133.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4134.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4135.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4135.8
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4136.8
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4137.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4138.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4138.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4139.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4140.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4140.9
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4141.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4142.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4144.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4144.3
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4145.0
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4145.1
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4146.2
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4147.0
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4147.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4147.1
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4147.3
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4150.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4150.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4160.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4160.0
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4170.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4170.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4180.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4181.1
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4181.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4181.9
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4183.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4183.5
[m]
C
GEOSTRA
30.04.2010
02.05.2025
1/3-3
4183.6
[m]
C
GEOSTR
30.04.2010
02.05.2025
1/3-3
4185.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4189.7
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4189.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4189.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4189.8
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4190.2
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4190.2
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4191.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4191.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4191.5
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4193.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4194.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4194.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4195.8
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4198.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4200.9
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4201.0
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4201.0
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4201.2
[m]
C
GEOSTR
30.04.2010
02.05.2025
1/3-3
4202.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4202.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4203.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4208.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4212.7
[m]
C
PETROS
30.04.2010
02.05.2025
1/3-3
4212.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4218.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4218.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4219.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4220.1
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4221.9
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4222.0
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4226.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4226.8
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4228.9
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4228.9
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4232.7
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4232.8
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4233.8
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4239.3
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4239.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4244.6
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4245.6
[m]
C
PETROSTR
30.04.2010
02.05.2025
1/3-3
4245.7
[m]
C
APT
30.04.2010
02.05.2025
1/3-3
4245.7
[m]
C
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4255.0
[m]
C
GEOSTR
30.04.2010
02.05.2025
1/3-3
4260.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4265.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4270.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4275.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4285.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4285.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4295.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4295.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4305.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4305.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4315.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4315.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4325.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4325.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4335.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4335.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4345.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4345.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4348.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4355.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4355.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4365.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4365.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4374.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4374.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4385.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4385.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4395.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4395.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4405.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4405.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4410.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4415.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4420.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4425.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4430.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4435.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4440.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4445.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4450.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4455.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4460.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4465.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4470.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4475.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4480.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4485.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4490.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4495.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4500.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4506.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4510.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4516.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4520.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4526.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4530.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4536.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4540.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4550.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4560.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4570.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4570.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4580.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4580.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4590.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-3
4590.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4599.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-3
4600.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-3
4610.0
[m]
DC
GEOSTRAT
30.04.2010
02.05.2025
1/3-3
4620.0
[m]
DC
GEOSTR
30.04.2010
02.05.2025
1/3-8
4738.0
[m]
DC
PETROSTR
30.04.2010
02.05.2025
1/3-8
4837.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-8
4891.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-8
4990.0
[m]
DC
PETROS
30.04.2010
02.05.2025
1/3-8
5024.5
[m]
C
PETROS
30.04.2010
02.05.2025
1/3-8
5032.8
[m]
C
PETROS
30.04.2010
02.05.2025
1/3-9 S
4274.2
[m]
C
APT
30.04.2010
02.05.2025
1/3-9 S
4274.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-9 S
4275.4
[m]
C
APT
30.04.2010
02.05.2025
1/3-9 S
4277.5
[m]
C
APT
30.04.2010
02.05.2025
1/3-9 S
4287.3
[m]
C
APT
30.04.2010
02.05.2025
Only the first 300 rows are displayed here. All rows will be included upon "Export".