Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
08.12.2025 - 01:16
Time of last synchronization with Norwegian Offshore Directorate's internal systems

Table – Palynological slides

Export:  EXCELOPENXML icon EXCEL XML icon XML CSV icon CSV

Only the first 300 rows are displayed here. All rows will be included upon "Export".

This table is large and will normally take 1-2 minutes to 'Export'.
Wellbore
Sample depth
Depth unit
Sample type
Laboratory
WDSS QC date
Date sync NOD
1/2-1
3163.1
[m]
C
HYDRO
19.12.2007
08.12.2025
1/2-1
8880.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
8940.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9000.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9060.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9120.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9180.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9240.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9300.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9363.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
9420.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9480.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9540.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9585.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
9600.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9660.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9684.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
9720.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9780.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9840.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9900.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9930.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
9960.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
9990.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
10020.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10050.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10080.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10110.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10140.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10170.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10200.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10229.9
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10276.3
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10308.6
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10339.3
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10362.0
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10369.3
[ft]
C
SSI
19.12.2007
08.12.2025
1/2-1
10400.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10460.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10490.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10520.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10580.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10640.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10700.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10744.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
10780.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10810.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10850.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
10880.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/2-1
10910.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10940.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
10970.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
11000.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
11030.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
11060.0
[ft]
DC
SSI
19.12.2007
08.12.2025
1/2-1
11091.0
[ft]
SWC
SSI
19.12.2007
08.12.2025
1/3-1
4510.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
4780.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
5170.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
5440.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
5740.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
6070.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
6280.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
6600.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
6860.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
7140.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
7400.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
7690.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
7960.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
8240.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
8550.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
8800.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
9060.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
9350.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
9570.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
9780.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
10080.0
[ft]
DC
UNIVSHEF
30.04.2010
08.12.2025
1/3-1
10140.0
[ft]
DC
UNIVSH
30.04.2010
08.12.2025
1/3-1
10270.0
[ft]
DC
UNIVSH
30.04.2010
08.12.2025
1/3-1
10330.0
[ft]
DC
UNIVSH
30.04.2010
08.12.2025
1/3-1
10390.0
[ft]
DC
UNIVSH
30.04.2010
08.12.2025
1/3-1
10600.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
10810.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
11370.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
11680.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
11980.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
12210.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
12490.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
12780.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
13060.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
13350.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
13560.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
13840.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
14050.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
14310.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
14590.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
14850.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
15100.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
15310.0
[ft]
DC
30.04.2010
08.12.2025
1/3-1
15560.0
[ft]
DC
30.04.2010
08.12.2025
1/3-3
3885.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3895.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3905.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3915.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3925.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3935.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3945.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3955.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3965.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3975.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3985.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
3995.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
4005.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
4015.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
4045.0
[m]
DC
GEOST
30.04.2010
08.12.2025
1/3-3
4050.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4055.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4060.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4065.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4070.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4075.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4080.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4085.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4090.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4095.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4100.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4105.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4110.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4115.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4120.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4128.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4129.0
[m]
C
GEOSTR
30.04.2010
08.12.2025
1/3-3
4129.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4129.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4130.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4130.5
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4131.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4132.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4133.0
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4133.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4134.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4135.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4135.8
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4136.8
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4137.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4138.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4138.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4139.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4140.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4140.9
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4141.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4142.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4144.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4144.3
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4145.0
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4145.1
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4146.2
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4147.0
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4147.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4147.1
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4147.3
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4150.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4150.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4160.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4160.0
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4170.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4170.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4180.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4181.1
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4181.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4181.9
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4183.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4183.5
[m]
C
GEOSTRA
30.04.2010
08.12.2025
1/3-3
4183.6
[m]
C
GEOSTR
30.04.2010
08.12.2025
1/3-3
4185.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4189.7
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4189.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4189.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4189.8
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4190.2
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4190.2
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4191.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4191.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4191.5
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4193.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4194.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4194.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4195.8
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4198.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4200.9
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4201.0
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4201.0
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4201.2
[m]
C
GEOSTR
30.04.2010
08.12.2025
1/3-3
4202.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4202.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4203.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4208.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4212.7
[m]
C
PETROS
30.04.2010
08.12.2025
1/3-3
4212.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4218.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4218.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4219.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4220.1
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4221.9
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4222.0
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4226.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4226.8
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4228.9
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4228.9
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4232.7
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4232.8
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4233.8
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4239.3
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4239.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4244.6
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4245.6
[m]
C
PETROSTR
30.04.2010
08.12.2025
1/3-3
4245.7
[m]
C
APT
30.04.2010
08.12.2025
1/3-3
4245.7
[m]
C
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4255.0
[m]
C
GEOSTR
30.04.2010
08.12.2025
1/3-3
4260.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4265.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4270.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4275.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4285.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4285.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4295.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4295.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4305.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4305.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4315.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4315.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4325.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4325.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4335.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4335.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4345.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4345.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4348.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4355.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4355.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4365.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4365.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4374.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4374.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4385.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4385.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4395.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4395.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4405.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4405.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4410.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4415.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4420.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4425.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4430.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4435.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4440.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4445.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4450.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4455.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4460.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4465.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4470.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4475.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4480.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4485.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4490.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4495.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4500.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4506.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4510.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4516.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4520.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4526.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4530.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4536.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4540.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4550.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4560.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4570.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4570.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4580.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4580.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4590.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-3
4590.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4599.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-3
4600.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-3
4610.0
[m]
DC
GEOSTRAT
30.04.2010
08.12.2025
1/3-3
4620.0
[m]
DC
GEOSTR
30.04.2010
08.12.2025
1/3-8
4738.0
[m]
DC
PETROSTR
30.04.2010
08.12.2025
1/3-8
4837.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-8
4891.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-8
4990.0
[m]
DC
PETROS
30.04.2010
08.12.2025
1/3-8
5024.5
[m]
C
PETROS
30.04.2010
08.12.2025
1/3-8
5032.8
[m]
C
PETROS
30.04.2010
08.12.2025
1/3-9 S
4274.2
[m]
C
APT
30.04.2010
08.12.2025
1/3-9 S
4274.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-9 S
4275.4
[m]
C
APT
30.04.2010
08.12.2025
1/3-9 S
4277.5
[m]
C
APT
30.04.2010
08.12.2025
1/3-9 S
4287.3
[m]
C
APT
30.04.2010
08.12.2025
Only the first 300 rows are displayed here. All rows will be included upon "Export".