Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
30.03.2026 - 01:05
Time of last synchronization with Norwegian Offshore Directorate's internal systems

Table – Palynological slides

Export:  EXCELOPENXML icon EXCEL XML icon XML CSV icon CSV

Only the first 300 rows are displayed here. All rows will be included upon "Export".

This table is large and will normally take 1-2 minutes to 'Export'.
Wellbore
Sample depth
Depth unit
Sample type
Laboratory
WDSS QC date
Date sync NOD
1/2-1
3163.1
[m]
C
HYDRO
19.12.2007
30.03.2026
1/2-1
8880.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
8940.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9000.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9060.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9120.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9180.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9240.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9300.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9363.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
9420.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9480.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9540.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9585.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
9600.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9660.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9684.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
9720.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9780.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9840.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9900.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9930.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
9960.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
9990.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
10020.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10050.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10080.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10110.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10140.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10170.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10200.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10229.9
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10276.3
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10308.6
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10339.3
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10362.0
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10369.3
[ft]
C
SSI
19.12.2007
30.03.2026
1/2-1
10400.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10460.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10490.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10520.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10580.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10640.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10700.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10744.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
10780.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10810.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10850.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
10880.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/2-1
10910.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10940.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
10970.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
11000.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
11030.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
11060.0
[ft]
DC
SSI
19.12.2007
30.03.2026
1/2-1
11091.0
[ft]
SWC
SSI
19.12.2007
30.03.2026
1/3-1
4510.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
4780.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
5170.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
5440.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
5740.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
6070.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
6280.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
6600.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
6860.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
7140.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
7400.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
7690.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
7960.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
8240.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
8550.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
8800.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
9060.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
9350.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
9570.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
9780.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
10080.0
[ft]
DC
UNIVSHEF
30.04.2010
30.03.2026
1/3-1
10140.0
[ft]
DC
UNIVSH
30.04.2010
30.03.2026
1/3-1
10270.0
[ft]
DC
UNIVSH
30.04.2010
30.03.2026
1/3-1
10330.0
[ft]
DC
UNIVSH
30.04.2010
30.03.2026
1/3-1
10390.0
[ft]
DC
UNIVSH
30.04.2010
30.03.2026
1/3-1
10600.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
10810.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
11370.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
11680.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
11980.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
12210.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
12490.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
12780.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
13060.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
13350.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
13560.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
13840.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
14050.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
14310.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
14590.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
14850.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
15100.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
15310.0
[ft]
DC
30.04.2010
30.03.2026
1/3-1
15560.0
[ft]
DC
30.04.2010
30.03.2026
1/3-3
3885.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3895.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3905.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3915.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3925.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3935.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3945.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3955.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3965.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3975.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3985.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
3995.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
4005.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
4015.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
4045.0
[m]
DC
GEOST
30.04.2010
30.03.2026
1/3-3
4050.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4055.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4060.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4065.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4070.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4075.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4080.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4085.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4090.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4095.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4100.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4105.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4110.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4115.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4120.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4128.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4129.0
[m]
C
GEOSTR
30.04.2010
30.03.2026
1/3-3
4129.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4129.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4130.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4130.5
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4131.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4132.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4133.0
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4133.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4134.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4135.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4135.8
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4136.8
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4137.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4138.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4138.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4139.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4140.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4140.9
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4141.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4142.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4144.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4144.3
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4145.0
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4145.1
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4146.2
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4147.0
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4147.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4147.1
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4147.3
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4150.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4150.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4160.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4160.0
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4170.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4170.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4180.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4181.1
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4181.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4181.9
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4183.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4183.5
[m]
C
GEOSTRA
30.04.2010
30.03.2026
1/3-3
4183.6
[m]
C
GEOSTR
30.04.2010
30.03.2026
1/3-3
4185.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4189.7
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4189.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4189.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4189.8
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4190.2
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4190.2
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4191.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4191.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4191.5
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4193.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4194.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4194.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4195.8
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4198.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4200.9
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4201.0
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4201.0
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4201.2
[m]
C
GEOSTR
30.04.2010
30.03.2026
1/3-3
4202.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4202.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4203.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4208.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4212.7
[m]
C
PETROS
30.04.2010
30.03.2026
1/3-3
4212.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4218.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4218.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4219.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4220.1
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4221.9
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4222.0
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4226.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4226.8
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4228.9
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4228.9
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4232.7
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4232.8
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4233.8
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4239.3
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4239.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4244.6
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4245.6
[m]
C
PETROSTR
30.04.2010
30.03.2026
1/3-3
4245.7
[m]
C
APT
30.04.2010
30.03.2026
1/3-3
4245.7
[m]
C
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4255.0
[m]
C
GEOSTR
30.04.2010
30.03.2026
1/3-3
4260.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4265.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4270.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4275.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4285.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4285.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4295.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4295.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4305.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4305.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4315.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4315.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4325.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4325.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4335.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4335.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4345.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4345.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4348.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4355.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4355.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4365.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4365.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4374.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4374.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4385.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4385.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4395.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4395.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4405.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4405.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4410.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4415.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4420.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4425.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4430.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4435.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4440.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4445.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4450.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4455.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4460.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4465.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4470.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4475.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4480.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4485.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4490.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4495.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4500.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4506.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4510.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4516.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4520.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4526.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4530.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4536.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4540.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4550.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4560.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4570.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4570.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4580.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4580.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4590.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-3
4590.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4599.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-3
4600.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-3
4610.0
[m]
DC
GEOSTRAT
30.04.2010
30.03.2026
1/3-3
4620.0
[m]
DC
GEOSTR
30.04.2010
30.03.2026
1/3-8
4738.0
[m]
DC
PETROSTR
30.04.2010
30.03.2026
1/3-8
4837.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-8
4891.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-8
4990.0
[m]
DC
PETROS
30.04.2010
30.03.2026
1/3-8
5024.5
[m]
C
PETROS
30.04.2010
30.03.2026
1/3-8
5032.8
[m]
C
PETROS
30.04.2010
30.03.2026
1/3-9 S
4274.2
[m]
C
APT
30.04.2010
30.03.2026
1/3-9 S
4274.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-9 S
4275.4
[m]
C
APT
30.04.2010
30.03.2026
1/3-9 S
4277.5
[m]
C
APT
30.04.2010
30.03.2026
1/3-9 S
4287.3
[m]
C
APT
30.04.2010
30.03.2026
Only the first 300 rows are displayed here. All rows will be included upon "Export".