Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
04.11.2024 - 01:25
Time of last synchronization with Norwegian Offshore Directorate's internal systems

MUNIN

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    MUNIN
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Approved for production
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    2011
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    North sea
    Main supply base
    Main supply base
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    42002476
  • Picture

    Picture
    MUNIN Field
    Picture not available
  • Discoveries included

  • Activity status — history

    Activity status — history
    Status
    Status from
    Status to
    Approved for production
    27.06.2023
  • Located in

    Located in
    Block name
    Prod. licence
    30/11
    30/11
    30/11
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    27.06.2023
    Behandlet i Stortinget 5.6.2023. Godkjenningsbrev fra OED datert 27.6.2023
    PDO
  • Ownership — full history

    Ownership — full history
    Owner kind
    Owner name
    Ownership from date
    Ownership to date
    PRODUCTION LICENSE
    27.06.2023
  • Operatorship — full history

    Operatorship — full history
    Company name
    Operatorship from
    Operatorship to
    27.06.2023
  • Licensees — full history

    Licensees — full history
    Company name
    Nation code
    Company share [%]
    Date licensee from
    Date licensee to
    NO
    50.000000
    27.06.2023
    NO
    50.000000
    27.06.2023
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    20.39
    21.63
    4.22
    0.00
    50.04
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    51.00
    7.00
    4.00
    36.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    20.39
    21.63
    4.22
    0.00
    50.04
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Munin is a field in in the Yggdrasil area in the central North Sea, 35 kilometres south of the Oseberg field. The water depth is 110 metres. The field comprises several discoveries and extends over 200 square kilometres. The first discovery was made in 1997 with well 30/11-5. Since then, a further ten discoveries have been made. The discovery wellbore for Munin is 30/11-8 S, drilled in 2011. The plan for development and operation (PDO) was approved in June 2023. The development concept includes subsea tie-back of the deposits to an unmanned processing platform located in the northern part of the Yggdrasil area. The platform will be tied-back to the Hugin A processing platform in the southern Yggdrasil area.
    14.12.2023
    Reservoir
    The reservoirs contain gas and oil mainly in Middle Jurassic sandstone of the Brent Group at depths of 3200-3650 metres. The Munin area is geologically complex, and the deposits have varying reservoir and fluid properties.
    14.12.2023
    Recovery strategy
    The deposits will be produced with different recovery strategies. The largest oil deposits will be produced with water injection, while gas deposits and smaller oil deposits will be produced by pressure depletion. Oil producers will be equipped with gas lift.
    14.12.2023
    Transport
    The gas will be exported in a new pipeline from Hugin A via Statpipe to the Kårstø terminal. The oil will be transported to the Hugin A facility for further processing and transport.
    23.08.2023
    Status
    The field is under development. The development of Munin is coordinated with the development of the Hugin and Fulla fields in the Yggdrasil area. The production is planned to start in 2027. There are also plans to drill several untested structures which may be produced through available well slots or new subsea templates.
    14.12.2023
  • Investments (expected)

    Investments (expected)
    The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    36582
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    50
    2022
    50
    2021
    0
    2020
    0
    2019
    0
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    05.12.1996
    09.01.1997
    WILDCAT
    P&A
    OIL
    20.05.2011
    03.07.2011
    WILDCAT
    P&A
    OIL/GAS/CONDENSATE
    20.03.2011
    20.05.2011
    WILDCAT
    P&A
    OIL/GAS/CONDENSATE
    14.11.2013
    08.01.2014
    WILDCAT
    P&A
    OIL
    22.09.2013
    13.11.2013
    WILDCAT
    P&A
    GAS
    01.11.2014
    26.12.2014
    WILDCAT
    P&A
    OIL/GAS/CONDENSATE
    28.12.2014
    13.02.2015
    APPRAISAL
    P&A
    OIL
    04.03.2016
    19.03.2016
    WILDCAT
    P&A
    OIL
    04.05.2016
    20.05.2016
    APPRAISAL
    P&A
    DRY
    08.04.2016
    04.05.2016
    WILDCAT
    P&A
    OIL
    22.05.2016
    06.06.2016
    WILDCAT
    P&A
    GAS/CONDENSATE
    07.06.2016
    06.07.2016
    WILDCAT
    P&A
    GAS/CONDENSATE
    06.07.2016
    23.07.2016
    WILDCAT
    P&A
    OIL/GAS/CONDENSATE
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    10.06.2021
    13.06.2021
    SHALLOW GAS
    PLUGGED
    14.06.2021
    16.06.2021
    SHALLOW GAS
    PLUGGED