MUNIN
Export: PDF
-
General information
-
Picture
-
Discoveries included
-
Activity status — history
Activity status — history StatusStatus fromStatus toApproved for production27.06.2023 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType27.06.2023Behandlet i Stortinget 5.6.2023. Godkjenningsbrev fra OED datert 27.6.2023PDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE27.06.2023 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to27.06.2023 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO50.00000027.06.2023NO50.00000027.06.2023 -
Description
Description TypeTextDate updatedDevelopmentMunin is a field in in the Yggdrasil area in the central North Sea, 35 kilometres south of the Oseberg field. The water depth is 110 metres. The field comprises several discoveries and extends over 200 square kilometres. The first discovery was made in 1997 with well 30/11-5. Since then, a further ten discoveries have been made. The discovery wellbore for Munin is 30/11-8 S, drilled in 2011. The plan for development and operation (PDO) was approved in June 2023. The development concept includes subsea tie-back of the deposits to an unmanned processing platform located in the northern part of the Yggdrasil area. The platform will be tied-back to the Hugin A processing platform in the southern Yggdrasil area.14.12.2023ReservoirThe reservoirs contain gas and oil mainly in Middle Jurassic sandstone of the Brent Group at depths of 3200-3650 metres. The Munin area is geologically complex, and the deposits have varying reservoir and fluid properties.14.12.2023Recovery strategyThe deposits will be produced with different recovery strategies. The largest oil deposits will be produced with water injection, while gas deposits and smaller oil deposits will be produced by pressure depletion. Oil producers will be equipped with gas lift.14.12.2023TransportThe gas will be exported in a new pipeline from Hugin A via Statpipe to the Kårstø terminal. The oil will be transported to the Hugin A facility for further processing and transport.23.08.2023StatusThe field is under development. The development of Munin is coordinated with the development of the Hugin and Fulla fields in the Yggdrasil area. The production is planned to start in 2027. There are also plans to drill several untested structures which may be produced through available well slots or new subsea templates.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.36582 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum50202250202102020020190 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3] -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3] -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent05.12.199609.01.1997WILDCATP&AOIL20.05.201103.07.2011WILDCATP&AOIL/GAS/CONDENSATE20.03.201120.05.2011WILDCATP&AOIL/GAS/CONDENSATE14.11.201308.01.2014WILDCATP&AOIL22.09.201313.11.2013WILDCATP&AGAS01.11.201426.12.2014WILDCATP&AOIL/GAS/CONDENSATE28.12.201413.02.2015APPRAISALP&AOIL04.03.201619.03.2016WILDCATP&AOIL04.05.201620.05.2016APPRAISALP&ADRY08.04.201604.05.2016WILDCATP&AOIL22.05.201606.06.2016WILDCATP&AGAS/CONDENSATE07.06.201606.07.2016WILDCATP&AGAS/CONDENSATE06.07.201623.07.2016WILDCATP&AOIL/GAS/CONDENSATE -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent -
Wellbores – other