BERLING
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toApproved for production28.06.2023 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType28.06.2023BerlingPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE28.06.2023 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to28.06.2023 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO40.00000028.06.2023NO30.00000028.06.2023NO30.00000028.06.2023 -
Description
Description TypeTextDate updatedDevelopmentBerling is a field on the Halten Terrace in the Norwegian Sea, 20 kilometres west of the Åsgard field. Berling consists of two accumulations, Berling Garn and Berling Breiflabb. The water depth is 280 metres. Berling was discovered in 2018, and the plan for development and operation (PDO) was approved in June 2023. The development concept includes a subsea template with four slots tied-back to the Åsgard B facility.14.12.2023ReservoirBerling contains gas and condensate. The Berling Garn reservoir is in the Middle Jurassic Garn Formation. It is at a depth of 4100 metres and has high pressure and high temperature (HPHT). The reservoir is structurally complex and has varying reservoir quality. The Berling Breiflabb reservoir is in intra-Lange Formation turbidite sandstone of Late Cretaceous age at a depth of 3900 metres.14.12.2023Recovery strategyThe field will be produced by pressure depletion.12.08.2023TransportThe well stream will be transported by pipeline to Åsgard B for processing. Condensate will be transferred to Åsgard A and Åsgard C for storage and export by shuttle tankers to the market. The rich gas will be transported via the Åsgard Transport System (ÅTS) for further processing at the Kårstø terminal.14.12.2023StatusThe field is under development and the production is planned to start in 2028.12.08.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.9414 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum3020223020210 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3] -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3] -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent28.11.201717.04.2018WILDCATP&AGAS/CONDENSATE31.05.201928.10.2019APPRAISALP&AGAS30.05.202028.07.2020APPRAISALP&AGAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus29.04.202201.05.2022SHALLOW GASPLUGGED01.05.202204.05.2022SHALLOW GASPLUGGEDSHALLOW GASSHALLOW GAS