Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
25.11.2024 - 01:30
Time of last synchronization with Norwegian Offshore Directorate's internal systems

30/11-9 A

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Wellbore name
    Official name of wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    30/11-9 A
    Type
    Wellbore type. Legal values: EXPLORATION, DEVELOPMENT, OTHER (see 'Purpose' for more information)
    EXPLORATION
    Purpose
    Final classification of the wellbore.

    Legal values for exploration wellbores:
    WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS.

    Legal values for development wellbores:
    OBSERVATION, PRODUCTION, INJECTION, INJECTION-CCS, OBSERVATION-CCS.

    Legal values for other wellbores:
    SOIL DRILLING (drilling in connection with track surveys and other subsurface surveys to investigate the soil conditions prior to placement of facilities),
    SHALLOW GAS (drilling to investigate shallow gas before the first 'real' drilling on the location),
    PILOT (drilling to investigate the geology and fluid connectors for location of the main wellbore),
    SCIENTIFIC (drilling according to Law of Scientific research and exploration),
    STRATIGRAPHIC (driling according to Law of Petroleum activities §2-1).
    WILDCAT
    Status
    Status for the wellbore. Legal values are:

    BLOWOUT: A blowout has occurred in the well.
    CLOSED: A development wellbore that has been closed in a shorter or longer periode. Also applies to development wellbores where drilling is completed, but production/injection has not yet been reported.
    DRILLING: The well is in the drilling phase - can be active drilling, logging, testing or plugging,
    JUNKED: The drilling operation has been terminated due to technical problems.
    P&A: Exploration: The well is plugged and abandoned, and can not be reentered for further use. Development wells: The production/injection from/to the well is stopped and the well is plugged. The wellhead is removed or else made unavailable for further well operations.
    PLUGGED: The wellbore has been plugged, but the upper parts of the wellbore can be re-used. A sidetrack might be drilled at a later stage.
    PRODUCING: It was produced from the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    INJECTING: It was injected to the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    PREDRILLED: The upper part of the well has been drilled, usually as part of a batch-drilling campaign covering several wellbores.
    RE-CLASS TO DEV: Exploration wellbore that is reclassified to a development wellbore.
    RE-CLASS TO TEST: Exploration wellbore that is reclassified to test production.
    SUSPENDED: The drilling operation in the wellbore has been temporarily stopped. The current plan is to continue drilling later on.
    P&A
    Press release
    Factmaps in new window
    Main area
    Name of the area on the Norwegian Continental Shelf where the wellbore is located. Legal values: BARENTS SEA, NORWEGIAN SEA, NORTH SEA.
    NORTH SEA
    Field
    Name of the field the wellbore is related to.
    Discovery
    Name of the discovery the wellbore is related to.
    Well name
    Official name of the parent well for the wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    30/11-9
    Seismic location
    Position of spud location on seismic survey lines. SP: shotpoint.
    inline 1231 & xline 2271(3D survey:NVG05STR11)
    Production licence
    Official designation of the production licence the wellbore was drilled or planned to be drilled from ( well head posistion).
    Drilling operator
    Name of the licensee starting the drilling operation on behalf of the active production license (well head position). This will usually equal the operator of the production license.
    Statoil Petroleum AS
    Drill permit
    The drilling permit number together with the version of the drilling permit as stated in the drilling permit granted by the Norwegian Offshore Directorate.
    1483-L
    Drilling facility
    Norwegian Offshore Directorate's name of the facility which the wellbore was drilled from.
    Drilling days
    Number of days from wellbore entry to wellbore completion.
    56
    Entered date
    The date when he wellbore was spudded. For sidetracks: The date when new formation was drilled by kicking off from the mother-wellbore,
    14.11.2013
    Completed date
    Exploration wellbores from moveable facilities:
    For floating facilities - date when anchor handling is started. For jackups - date the jacking-down started. Exploration wellbores from fixed facilities and all development wellbores:
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    08.01.2014
    Release date
    Date when raw data which has been reported to the authorities from the wellbore is not confidential any longer. Normally 2 years after finishing the drilling. May be earlier if the area of the production license is relinquished.
    08.01.2016
    Publication date
    Date quality control of the wellbore information was completed, so it can be published on the internet as a 'Well Data Summary Sheet' wellbore with more information available than other wellbores.
    08.01.2016
    Purpose - planned
    Pre-drill purpose of the wellbore. Legal values for exploration wellbores: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS. Example of legal values for development wellbores: OBSERVATION, PRODUCTION, INJECTION.
    WILDCAT
    Reentry
    Status whether the wellbore has been re-entered (YES) or not (NO). Re-entered wellbores are not included in the count when wellbores are presented in statistical overviews.
    NO
    Content
    For exploration wellbores, status of discovery.

    Legal values:
    DRY, SHOWS (trace amounts of hydrocarbons), GAS, GAS/CONDENSATE, OIL or OIL/GAS.
    SHOWS (GAS SHOWS, OIL SHOWS or OIL/GAS SHOWS) are detected as fluorescent cut (organic extract), petroleum odour, or visual stain on cuttings or cores, or as increased gas reading on the mud-loggers gas detection equipment.
    Legal values for WILDCAT-CCS and APPRAISAL-CCS: WATER

    For development wellbores, type of produced/injected fluid.
    Legal values:
    WATER, CUTTINGS, NOT AVAILABLE, OIL, GAS/CONDENSATE, OIL/GAS, CO2, GAS, WATER/GAS, NOT APPLICABLE.
    OIL
    Discovery wellbore
    Indicator which tells if the wellbore made a new discovery. Legal values: YES, NO. Prior to press-release or other information regarding drilling results, the indicator will be “NO” as a default.
    YES
    1st level with HC, age
    Age of lithostratigraphic unit, 1st level, where hydrocarbons were encountered. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EOCENE. See also Norwegian Offshore Directorate bulletins.
    MIDDLE JURASSIC
    1st level with HC, formation
    Name of lithostartigraphic unit, 1st level, where hydrocarbons were encountered. Shown only for released wells. Examples of legal values: BASEMENT, COOK FM, EKOFISK FM, HEIMDAL FM, SANDNES FM, SOGNEFJORD FM, TARBERT FM, BRENT GP. See also Norwegian Offshore Directorate bulletins.
    TARBERT FM
    Kelly bushing elevation [m]
    Elevation of the rotary kelly bushing (RKB) above mean sea level.
    22.0
    Water depth [m]
    Depth in metres betweem mean sea level and sea floor.
    110.0
    Total depth (MD) [m RKB]
    Total measured length of wellbore from kelly bushing to total depth (driller's depth).
    4054.0
    Final vertical depth (TVD) [m RKB]
    Vertical elevation from total depth to kelly bushing. Shown only for released wells. Referred to as true vertical depth (TVD).
    3667.5
    Maximum inclination [°]
    Maximum deviation, in degrees, from a vertical well path.Shown only for released wells.
    39.4
    Oldest penetrated age
    Age (according to Geologic Time Scale 2004 by F. M. Gradstein, et al. (2004)) of the oldest penetrated formation. May differ from age at TD for example in deviated wellbores. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EARLY PERMIAN, EARLY TRIASSIC, EOCENE.
    MIDDLE JURASSIC
    Oldest penetrated formation
    Name of the oldest lithostratigraphic unit penetrated by the wellbore. Shown only for released wells. In most wellbores this is formation or group at total depth. May differ from formation or group at TD for example in wellbores drilled with high deviation or through faults. Examples of legal values: AMUNDSEN FM, BALDER FM, BASEMENT, BLODØKS FM, BRYNE FM, BURTON FM, COOK FM, DRAKE FM, DRAUPNE FM, EKOFISK FM, DUNLIN GP.
    NESS FM
    Geodetic datum
    Reference system for coordinates. Example of legal values: ED50.
    ED50
    NS degrees
    Geographic coordinate of the wellhead, north-south degrees.
    60° 6' 10.86'' N
    EW degrees
    Geographic coordinate of the wellhead, east-west degrees.
    2° 35' 13.44'' E
    NS UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, north-south.
    6663111.75
    EW UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, east-west.
    477038.13
    UTM zone
    Universal Transverse Mercator zone. Examples of legal values: 31, 32, 33, 34.
    31
    NPDID wellbore
    Norwegian Offshore Directorate's unique id for the wellbore.
    7281
  • Wellbore history

    General
    Well 30/11-9 A is a geologic sidetrack to well 30/11-9 S. It was drilled to test the Askja East prospect in the Fensal Sub-basin, about 35 km south of the Oseberg Sør installation in the North Sea. The Askja East prospect is situated in a separate fault block to the 30/11-9 S Askja West discovery. The primary objective for 30/9-11 A was to prove petroleum in the Middle Jurassic Tarbert Formation. The secondary exploration target was to prove petroleum in reservoir rocks in the Middle Jurassic Ness and Etive formations.
    Operations and results
    Wildcat well 30/11-9 A was kicked off at 1401 m in main well 30/11-9 S on 13 November 2013. It was drilled with the semi-submersible installation Ocean Vanguard to TD at 4054 m in the Middle Jurassic Ness Formation. Problems with the Ocean Vanguard DDM caused some downtime and slow drilling in periods, but otherwise no significant problem was encountered in the operations. The well was drilled with XP-07 oil based mud from kick-off to TD.
    The top of the expected main reservoir, Tarbert Formation came in as prognosed at 3615 m (3252 m TVD). Based on pressure gradients and fluid sampling, oil was present in two differently pressured compartments within the upper part of the Tarbert Formation. The upper reservoir contained oil from 3615 m (3252 m TVD) down to an oil-water contact indicated at 3636 m (3272 m TVD). The lower reservoir contained oil from 3745 m (3374.5 m TVD) down to an oil-water contact indicated at 3771 m (3400 m TVD). Oil shows (fluorescence) were described on sandstones in between these two reservoirs. The lower part of Tarbert Formation and the Ness Formation were water bearing. The Etive Formation was not drilled since the Ness Formation was water bearing.
    Three cores were cut in 30/11-9 A, all three with 100% recovery. Core 1 was cut from 3613.6 to 3667 m, while cores 2 and 3 were cut and recovered the whole interval from 3738.5 to 3848 m. The core to log depth shift was ca +4.4 m for all three cores. MDT fluid samples were taken at 3619.2 m (oil), 3749.0 m (oil), 3754.9 m (oil), 3771.9 m (water), and 3837.0 m (water).
    The well was permanently abandoned on 9 January 2014 as an oil discovery.
    Testing
    No drill stem test was performed.
  • Cuttings at the Norwegian Offshore Directorate

    Cuttings at the Norwegian Offshore Directorate
    Cuttings available for sampling?
    YES
    Cuttings at the Norwegian Offshore Directorate
    Cutting sample, top depth [m]
    Cutting samples, bottom depth [m]
    1410.00
    4054.00
  • Cores at the Norwegian Offshore Directorate

    Cores at the Norwegian Offshore Directorate
    Core sample number
    Core sample - top depth
    Core sample - bottom depth
    Core sample depth - uom
    1
    3613.6
    3667.8
    [m ]
    2
    3738.5
    3792.6
    [m ]
    3
    3792.6
    3848.0
    [m ]
    Cores at the Norwegian Offshore Directorate
    Total core sample length [m]
    163.7
    Cores at the Norwegian Offshore Directorate
    Cores available for sampling?
    YES
  • Lithostratigraphy

  • Logs

    Logs
    Log type
    Log top depth [m]
    Log bottom depth [m]
    2XOBMI GPIT NGI HNGS GR
    3491
    3950
    AIT PPC MSIP PPC PEX
    3289
    4054
    CBL USIT GYRO
    2836
    3421
    MWD LWD - PD ARC8 TELE
    1289
    3512
    MWD LWD - PD X6 PERI15 TELE
    2474
    4054
    PS HY PO LFA SC1 MS PC CMR GR
    3619
    3982
    SC PO PA PQ HY PO SC GR CMR
    3550
    3815
    SCEX PO PQ HY LFA SC1 MS PC GR
    3619
    3755
  • Casing and leak–off tests

    Casing and leak–off tests
    Casing type
    Casing diam.
    [inch]
    Casing depth
    [m]
    Hole diam.
    [inch]
    Hole depth
    [m]
    LOT/FIT mud eqv.
    [g/cm3]
    Formation test type
    INTERM.
    9 5/8
    3491.0
    12 1/4
    3491.0
    1.91
    LOT
    OPEN HOLE
    4054.0
    8 1/2
    4054.0
    0.00
  • Drilling mud

    Drilling mud
    Depth MD [m]
    Mud weight [g/cm3]
    Visc. [mPa.s]
    Yield point [Pa]
    Mud type
    Date measured
    1421
    1.43
    28.0
    XP-07 - Yellow
    2820
    1.45
    31.0
    XP-07 - Yellow
    3228
    1.45
    23.0
    XP-07 - Yellow
    3444
    1.30
    25.0
    XP-07 - Yellow
    3512
    1.27
    14.0
    XP-07 - Yellow
    3613
    1.27
    20.0
    XP-07 - Yellow
    4054
    1.29
    25.0
    XP-07 - Yellow