Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
24.11.2024 - 01:27
Time of last synchronization with Norwegian Offshore Directorate's internal systems

6307/1-2

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Wellbore name
    Official name of wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    6307/1-2
    Type
    Wellbore type. Legal values: EXPLORATION, DEVELOPMENT, OTHER (see 'Purpose' for more information)
    EXPLORATION
    Purpose
    Final classification of the wellbore.

    Legal values for exploration wellbores:
    WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS.

    Legal values for development wellbores:
    OBSERVATION, PRODUCTION, INJECTION, INJECTION-CCS, OBSERVATION-CCS.

    Legal values for other wellbores:
    SOIL DRILLING (drilling in connection with track surveys and other subsurface surveys to investigate the soil conditions prior to placement of facilities),
    SHALLOW GAS (drilling to investigate shallow gas before the first 'real' drilling on the location),
    PILOT (drilling to investigate the geology and fluid connectors for location of the main wellbore),
    SCIENTIFIC (drilling according to Law of Scientific research and exploration),
    STRATIGRAPHIC (driling according to Law of Petroleum activities §2-1).
    WILDCAT
    Status
    Status for the wellbore. Legal values are:

    BLOWOUT: A blowout has occurred in the well.
    CLOSED: A development wellbore that has been closed in a shorter or longer periode. Also applies to development wellbores where drilling is completed, but production/injection has not yet been reported.
    DRILLING: The well is in the drilling phase - can be active drilling, logging, testing or plugging,
    JUNKED: The drilling operation has been terminated due to technical problems.
    P&A: Exploration: The well is plugged and abandoned, and can not be reentered for further use. Development wells: The production/injection from/to the well is stopped and the well is plugged. The wellhead is removed or else made unavailable for further well operations.
    PLUGGED: The wellbore has been plugged, but the upper parts of the wellbore can be re-used. A sidetrack might be drilled at a later stage.
    PRODUCING: It was produced from the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    INJECTING: It was injected to the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    PREDRILLED: The upper part of the well has been drilled, usually as part of a batch-drilling campaign covering several wellbores.
    RE-CLASS TO DEV: Exploration wellbore that is reclassified to a development wellbore.
    RE-CLASS TO TEST: Exploration wellbore that is reclassified to test production.
    SUSPENDED: The drilling operation in the wellbore has been temporarily stopped. The current plan is to continue drilling later on.
    P&A
    Press release
    Factmaps in new window
    Main area
    Name of the area on the Norwegian Continental Shelf where the wellbore is located. Legal values: BARENTS SEA, NORWEGIAN SEA, NORTH SEA.
    NORWEGIAN SEA
    Well name
    Official name of the parent well for the wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    6307/1-2
    Seismic location
    Position of spud location on seismic survey lines. SP: shotpoint.
    3D survey PGS14005EQRZ21-PL1058 inline 17166 xline: 4862
    Production licence
    Official designation of the production licence the wellbore was drilled or planned to be drilled from ( well head posistion).
    Drilling operator
    Name of the licensee starting the drilling operation on behalf of the active production license (well head position). This will usually equal the operator of the production license.
    Equinor Energy AS
    Drill permit
    The drilling permit number together with the version of the drilling permit as stated in the drilling permit granted by the Norwegian Offshore Directorate.
    1943-L
    Drilling facility
    Norwegian Offshore Directorate's name of the facility which the wellbore was drilled from.
    Drilling days
    Number of days from wellbore entry to wellbore completion.
    20
    Entered date
    The date when he wellbore was spudded. For sidetracks: The date when new formation was drilled by kicking off from the mother-wellbore,
    27.09.2023
    Completed date
    Exploration wellbores from moveable facilities:
    For floating facilities - date when anchor handling is started. For jackups - date the jacking-down started. Exploration wellbores from fixed facilities and all development wellbores:
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    16.10.2023
    Plugged and abondon date
    Date when the P&A-operations of the wellbore was finished, as reported by the operator to the Norwegian Offshore Directorate throught DDRS (Daily Drilling Reporting System). Only applied once pr. wellhead/surface location.
    15.10.2023
    Release date
    Date when raw data which has been reported to the authorities from the wellbore is not confidential any longer. Normally 2 years after finishing the drilling. May be earlier if the area of the production license is relinquished.
    13.08.2024
    Publication date
    Date quality control of the wellbore information was completed, so it can be published on the internet as a 'Well Data Summary Sheet' wellbore with more information available than other wellbores.
    13.08.2024
    Purpose - planned
    Pre-drill purpose of the wellbore. Legal values for exploration wellbores: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS. Example of legal values for development wellbores: OBSERVATION, PRODUCTION, INJECTION.
    WILDCAT
    Reentry
    Status whether the wellbore has been re-entered (YES) or not (NO). Re-entered wellbores are not included in the count when wellbores are presented in statistical overviews.
    NO
    Content
    For exploration wellbores, status of discovery.

    Legal values:
    DRY, SHOWS (trace amounts of hydrocarbons), GAS, GAS/CONDENSATE, OIL or OIL/GAS.
    SHOWS (GAS SHOWS, OIL SHOWS or OIL/GAS SHOWS) are detected as fluorescent cut (organic extract), petroleum odour, or visual stain on cuttings or cores, or as increased gas reading on the mud-loggers gas detection equipment.
    Legal values for WILDCAT-CCS and APPRAISAL-CCS: WATER

    For development wellbores, type of produced/injected fluid.
    Legal values:
    WATER, CUTTINGS, NOT AVAILABLE, OIL, GAS/CONDENSATE, OIL/GAS, CO2, GAS, WATER/GAS, NOT APPLICABLE.
    DRY
    Discovery wellbore
    Indicator which tells if the wellbore made a new discovery. Legal values: YES, NO. Prior to press-release or other information regarding drilling results, the indicator will be “NO” as a default.
    NO
    Kelly bushing elevation [m]
    Elevation of the rotary kelly bushing (RKB) above mean sea level.
    30.0
    Water depth [m]
    Depth in metres betweem mean sea level and sea floor.
    312.0
    Total depth (MD) [m RKB]
    Total measured length of wellbore from kelly bushing to total depth (driller's depth).
    2313.0
    Final vertical depth (TVD) [m RKB]
    Vertical elevation from total depth to kelly bushing. Shown only for released wells. Referred to as true vertical depth (TVD).
    2313.0
    Maximum inclination [°]
    Maximum deviation, in degrees, from a vertical well path.Shown only for released wells.
    2.8
    Oldest penetrated age
    Age (according to Geologic Time Scale 2004 by F. M. Gradstein, et al. (2004)) of the oldest penetrated formation. May differ from age at TD for example in deviated wellbores. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EARLY PERMIAN, EARLY TRIASSIC, EOCENE.
    TRIASSIC
    Oldest penetrated formation
    Name of the oldest lithostratigraphic unit penetrated by the wellbore. Shown only for released wells. In most wellbores this is formation or group at total depth. May differ from formation or group at TD for example in wellbores drilled with high deviation or through faults. Examples of legal values: AMUNDSEN FM, BALDER FM, BASEMENT, BLODØKS FM, BRYNE FM, BURTON FM, COOK FM, DRAKE FM, DRAUPNE FM, EKOFISK FM, DUNLIN GP.
    RED BEDS (INFORMAL)
    Geodetic datum
    Reference system for coordinates. Example of legal values: ED50.
    ED50
    NS degrees
    Geographic coordinate of the wellhead, north-south degrees.
    63° 58' 17.78'' N
    EW degrees
    Geographic coordinate of the wellhead, east-west degrees.
    7° 7' 18.87'' E
    NS UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, north-south.
    7095379.45
    EW UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, east-west.
    408050.70
    UTM zone
    Universal Transverse Mercator zone. Examples of legal values: 31, 32, 33, 34.
    32
    NPDID wellbore
    Norwegian Offshore Directorate's unique id for the wellbore.
    9885
  • Cuttings at the Norwegian Offshore Directorate

    Cuttings at the Norwegian Offshore Directorate
    Cuttings available for sampling?
    YES
    Cuttings at the Norwegian Offshore Directorate
    Cutting sample, top depth [m]
    Cutting samples, bottom depth [m]
    1030.00
    2313.40
  • Cores at the Norwegian Offshore Directorate

    Cores at the Norwegian Offshore Directorate
    Core sample number
    Core sample - top depth
    Core sample - bottom depth
    Core sample depth - uom
    1
    1955.0
    1964.7
    [m ]
    2
    1965.0
    1976.9
    [m ]
    3
    1983.0
    1988.6
    [m ]
    Cores at the Norwegian Offshore Directorate
    Total core sample length [m]
    27.2
    Cores at the Norwegian Offshore Directorate
    Cores available for sampling?
    YES
  • Palynological slides at the Norwegian Offshore Directorate

    Palynological slides at the Norwegian Offshore Directorate
    Sample depth
    Depth unit
    Sample type
    Laboratory
    1030.0
    [m]
    C
    PETROSTR
    1040.0
    [unknown]
    C
    PETROSTR
    1050.0
    [m]
    C
    PETROSTR
    1060.0
    [m]
    C
    PETROSTR
    1070.0
    [m]
    C
    PETROSTR
    1080.0
    [m]
    C
    PETROSTR
    1090.0
    [m]
    C
    PETROSTR
    1100.0
    [m]
    C
    PETROSTR
    1110.0
    [m]
    C
    PETROSTR
    1120.0
    [m]
    C
    PETROSTR
    1130.0
    [m]
    C
    PETROSTR
    1140.0
    [m]
    C
    PETROSTR
    1150.0
    [m]
    C
    PETROSTR
    1160.0
    [m]
    C
    PETROSTR
    1170.0
    [m]
    C
    PETROSTR
    1180.0
    [m]
    DC
    PETROSTR
    1190.0
    [m]
    DC
    PETROSTR
    1200.0
    [m]
    DC
    PETROSTR
    1210.0
    [m]
    DC
    PETROSTR
    1220.0
    [m]
    DC
    PETROSTR
    1230.0
    [m]
    DC
    PETROSTR
    1240.0
    [m]
    DC
    PETROSTR
    1250.0
    [m]
    DC
    PETROSTR
    1260.0
    [m]
    DC
    PETROSTR
    1270.0
    [m]
    DC
    PETROSTR
    1280.0
    [m]
    DC
    PETROSTR
    1290.0
    [m]
    DC
    PETROSTR
    1300.0
    [m]
    DC
    PETROSTR
    1310.0
    [m]
    DC
    PETROSTR
    1320.0
    [m]
    DC
    PETROSTR
    1330.0
    [m]
    DC
    PETROSTR
    1340.0
    [m]
    DC
    PETROSTR
    1350.0
    [m]
    DC
    PETROSTR
    1360.0
    [m]
    DC
    PETROSTR
    1370.0
    [m]
    DC
    PETROSTR
    1380.0
    [m]
    DC
    PETROSTR
    1390.0
    [m]
    DC
    PETROSTR
    1400.0
    [m]
    DC
    PETROSTR
    1410.0
    [m]
    DC
    PETROSTR
    1420.0
    [m]
    DC
    PETROSTR
    1430.0
    [m]
    DC
    PETROSTR
    1440.0
    [m]
    DC
    PETROSTR
    1450.0
    [m]
    DC
    PETROSTR
    1460.0
    [m]
    DC
    PETROSTR
    1470.0
    [m]
    DC
    PETROSTR
    1480.0
    [m]
    DC
    PETROSTR
    1490.0
    [m]
    DC
    PETROSTR
    1500.0
    [m]
    DC
    PETROSTR
    1510.0
    [m]
    DC
    PETROSTR
    1520.0
    [m]
    DC
    PETROSTR
    1530.0
    [m]
    DC
    PETROSTR
    1540.0
    [m]
    DC
    PETROSTR
    1550.0
    [m]
    DC
    PETROSTR
    1560.0
    [m]
    DC
    PETROSTR
    1570.0
    [m]
    DC
    PETROSTR
    1580.0
    [m]
    DC
    PETROSTR
    1590.0
    [m]
    DC
    PETROSTR
    1600.0
    [m]
    DC
    PETROSTR
    1610.0
    [m]
    DC
    PETROSTR
    1620.0
    [m]
    DC
    PETROSTR
    1630.0
    [m]
    DC
    PETROSTR
    1640.0
    [m]
    DC
    PETROSTR
    1650.0
    [m]
    DC
    PETROSTR
    1660.0
    [m]
    DC
    PETROSTR
    1670.0
    [m]
    DC
    PETROSTR
    1680.0
    [m]
    DC
    PETROSTR
    1690.0
    [m]
    DC
    PETROSTR
    1700.0
    [m]
    DC
    PETROSTR
    1710.0
    [m]
    DC
    PETROSTR
    1720.0
    [m]
    DC
    PETROSTR
    1730.0
    [m]
    DC
    PETROSTR
    1740.0
    [m]
    DC
    PETROSTR
    1750.0
    [m]
    DC
    PETROSTR
    1760.0
    [m]
    DC
    PETROSTR
    1770.0
    [m]
    DC
    PETROSTR
    1780.0
    [m]
    DC
    PETROSTR
    1790.0
    [m]
    DC
    PETROSTR
    1800.0
    [m]
    DC
    PETROSTR
    1804.0
    [m]
    DC
    PETROSTR
    1806.0
    [m]
    DC
    PETROSTR
    1809.0
    [m]
    DC
    PETROSTR
    1812.0
    [m]
    DC
    PETROSTR
    1815.0
    [m]
    DC
    PETROSTR
    1818.0
    [m]
    DC
    PETROSTR
    1821.0
    [m]
    DC
    PETROSTR
    1824.0
    [m]
    DC
    PETROSTR
    1827.0
    [m]
    DC
    PETROSTR
    1830.0
    [m]
    DC
    PETROSTR
    1833.0
    [m]
    DC
    PETROSTR
    1836.0
    [m]
    DC
    PETROSTR
    1839.0
    [m]
    DC
    PETROSTR
    1842.0
    [m]
    DC
    PETROSTR
    1845.0
    [m]
    DC
    PETROSTR
    1848.0
    [m]
    DC
    PETROSTR
    1851.0
    [m]
    DC
    PETROSTR
    1854.0
    [m]
    DC
    PETROSTR
    1857.0
    [m]
    DC
    PETROSTR
    1860.0
    [m]
    DC
    PETROSTR
    1863.0
    [m]
    DC
    PETROSTR
    1866.0
    [m]
    DC
    PETROSTR
    1869.0
    [m]
    DC
    PETROSTR
    1872.0
    [m]
    DC
    PETROSTR
    1875.0
    [m]
    DC
    PETROSTR
    1878.0
    [m]
    DC
    PETROSTR
    1881.0
    [m]
    DC
    PETROSTR
    1884.0
    [m]
    DC
    PETROSTR
    1887.0
    [m]
    DC
    PETROSTR
    1890.0
    [m]
    DC
    PETROSTR
    1893.0
    [m]
    DC
    PETROSTR
    1895.2
    [m]
    SWC
    PETROSTR
    1896.0
    [m]
    DC
    PETROSTR
    1899.0
    [m]
    DC
    PETROSTR
    1899.8
    [m]
    SWC
    PETROSTR
    1902.0
    [m]
    DC
    PETROSTR
    1905.0
    [m]
    DC
    PETROSTR
    1905.2
    [m]
    SWC
    PETROSTR
    1908.0
    [m]
    DC
    PETROSTR
    1911.0
    [m]
    DC
    PETROSTR
    1911.8
    [m]
    SWC
    PETROSTR
    1914.0
    [m]
    DC
    PETROSTR
    1917.0
    [m]
    DC
    PETROSTR
    1919.4
    [m]
    SWC
    PETROSTR
    1920.0
    [m]
    DC
    PETROSTR
    1923.0
    [m]
    DC
    PETROSTR
    1926.0
    [m]
    DC
    PETROSTR
    1926.2
    [m]
    SWC
    PETROSTR
    1929.0
    [m]
    DC
    PETROSTR
    1929.4
    [m]
    SWC
    PETROSTR
    1932.0
    [m]
    DC
    PETROSTR
    1935.0
    [m]
    DC
    PETROSTR
    1938.0
    [m]
    DC
    PETROSTR
    1938.3
    [m]
    SWC
    PETROSTR
    1941.0
    [m]
    DC
    PETROSTR
    1944.0
    [m]
    DC
    PETROSTR
    1947.0
    [m]
    DC
    PETROSTR
    1950.0
    [m]
    DC
    PETROSTR
    1953.0
    [m]
    DC
    PETROSTR
    1956.0
    [m]
    C
    PETROSTR
    1962.5
    [m]
    C
    PETROSTR
    1965.6
    [m]
    C
    PETROSTR
    1971.8
    [m]
    C
    PETROSTR
    1972.9
    [m]
    C
    PETROSTR
    1973.3
    [m]
    C
    PETROSTR
    1983.4
    [m]
    C
    PETROSTR
    1986.8
    [m]
    C
    PETROSTR
    1988.3
    [m]
    C
    PETROSTR
    1992.0
    [m]
    DC
    PETROSTR
    1992.6
    [m]
    SWC
    PETROSTR
    1998.0
    [m]
    DC
    PETROSTR
    2007.0
    [m]
    DC
    PETROSTR
    2016.0
    [m]
    DC
    PETROSTR
    2018.9
    [m]
    SWC
    PETROSTR
    2025.0
    [m]
    DC
    PETROSTR
    2034.0
    [m]
    DC
    PETROSTR
    2043.0
    [m]
    DC
    PETROSTR
    2052.0
    [m]
    DC
    PETROSTR
    2061.0
    [m]
    DC
    PETROSTR
    2066.5
    [m]
    SWC
    PETROSTR
    2070.0
    [m]
    DC
    PETROSTR
    2072.6
    [m]
    SWC
    PETROSTR
    2079.0
    [m]
    DC
    PETROSTR
    2088.0
    [m]
    DC
    PETROSTR
    2097.0
    [m]
    DC
    PETROSTR
    2104.0
    [m]
    SWC
    PETROSTR
    2106.0
    [m]
    DC
    PETROSTR
    2108.2
    [m]
    SWC
    PETROSTR
    2115.0
    [m]
    DC
    PETROSTR
    2124.0
    [m]
    DC
    PETROSTR
    2133.0
    [m]
    DC
    PETROSTR
    2142.0
    [m]
    DC
    PETROSTR
    2151.0
    [m]
    DC
    PETROSTR
    2160.0
    [m]
    DC
    PETROSTR
    2169.0
    [m]
    DC
    PETROSTR
    2178.0
    [m]
    DC
    PETROSTR
    2187.0
    [m]
    DC
    PETROSTR
    2196.0
    [m]
    DC
    PETROSTR
    2205.0
    [m]
    DC
    PETROSTR
    2214.0
    [m]
    DC
    PETROSTR
    2223.0
    [m]
    DC
    PETROSTR
    2232.0
    [m]
    DC
    PETROSTR
    2241.0
    [m]
    DC
    PETROSTR
    2250.0
    [m]
    DC
    PETROSTR
    2259.0
    [m]
    DC
    PETROSTR
    2261.1
    [m]
    SWC
    PETROSTR
    2268.0
    [m]
    DC
    PETROSTR
    2277.0
    [m]
    DC
    PETROSTR
    2286.0
    [m]
    DC
    PETROSTR
    2295.0
    [m]
    DC
    PETROSTR
    2304.0
    [m]
    DC
    PETROSTR
    2313.4
    [m]
    C
    PETROSTR
  • Lithostratigraphy

  • Logs

    Logs
    Log type
    Log top depth [m]
    Log bottom depth [m]
    CMR NEXT XPT
    1802
    2313
    FMI MSIP
    1728
    2313
    HRLA PEX HNGS
    1802
    2313
    MWD LWD - GR RES DEN NEU
    1977
    2313
    MWD LWD - GR RES DI
    1804
    1955
    MWD LWD - GR RES DI NEU DEN SON
    1025
    1804
    MWD LWD- GR RES DI
    354
    1025
    XLR
    1905
    2293
    XLR
    1938
    2103
  • Casing and leak–off tests

    Casing and leak–off tests
    Casing type
    Casing diam.
    [inch]
    Casing depth
    [m]
    Hole diam.
    [inch]
    Hole depth
    [m]
    LOT/FIT mud eqv.
    [g/cm3]
    Formation test type
    INTERM.
    13 3/8
    1015.0
    17 1/2
    1025.0
    1.54
    FIT
    LINER
    9 5/8
    1802.0
    12 1/4
    1804.0
    1.55
    XLO
    OPEN HOLE
    2313.0
    8 1/2
    2313.0
    0.00
  • Drilling mud

    Drilling mud
    Depth MD [m]
    Mud weight [g/cm3]
    Visc. [mPa.s]
    Yield point [Pa]
    Mud type
    Date measured
    1075
    1.31
    33.0
    8.0
    VERSATEC
    1730
    1.33
    30.0
    11.0
    VERSATEC
    1804
    1.34
    31.0
    11.5
    VERSATEC
    1806
    1.32
    17.0
    10.0
    GLYDRIL
    1827
    1.33
    18.0
    11.5
    GLYDRIL
    1955
    1.34
    18.0
    11.5
    GLYDRIL
    1983
    1.35
    21.0
    13.0
    GLYDRIL
    2040
    1.34
    18.0
    12.0
    GLYDRIL
    2313
    1.34
    20.0
    15.0
    GLYDRIL