HALTEN ØST
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toApproved for production13.02.2023 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType13.02.2023PUD godkjent av OEDPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to dateBUSINESS ARRANGEMENT AREA13.02.2023 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to13.02.2023 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO57.70000013.02.2023NO24.60000013.02.2023NO11.80000013.02.2023NO5.90000013.02.2023 -
Description
Description TypeTextDate updatedDevelopmentHalten Øst is a field in the Norwegian Sea, just east of the Åsgard field. It consists of six discoveries: Natalia, Sigrid, Nona, Flyndretind, Gamma and Harepus, spread out within 65 kilometres between Natalia in the north to Mikkel Sør in the south. The water depth is 200-300 metres. The discoveries will be developed together, and the plan for development and operation (PDO) was approved in February 2023. The development concept includes five subsea templates tied-back to the existing infrastructure on the Åsgard field.09.12.2023ReservoirThe reservoirs contain mainly gas and condensate in Lower to Upper Jurassic sandstone in the Tilje, Tofte, Ile, Garn and Melke Formations. They are located at depths between 2000 and 3000 metres. Common for all these reservoirs is that the volumes are relatively small, but the reservoir properties are excellent.09.12.2023Recovery strategyThe drainage strategy is pressure depletion with aquifer support.20.04.2023TransportThe oil and condensate will be transported from Åsgard to the market by tankers. The gas will be exported via the Åsgard Transport System (ÅTS) to the terminal at Kårstø.09.12.2023StatusHalten Øst will be developed in two phases. Production from the first and second phase is scheduled to start in 2025 and 2029, respectively.20.04.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.8356 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum94020229402021020200 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3] -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3] -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent26.07.200902.09.2009WILDCATP&AOIL/GAS03.04.201013.05.2010WILDCATP&AOIL/GAS02.01.200805.02.2008WILDCATP&AGAS12.04.200927.05.2009WILDCATP&AGAS13.06.200108.07.2001WILDCATP&AGAS/CONDENSATE12.03.200818.04.2008WILDCATP&AGAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContentPRODUCTION22.11.2024PRODUCTION -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus24.06.202428.06.2024SHALLOW GASP&A29.06.202402.07.2024SHALLOW GASP&A02.07.202404.07.2024SHALLOW GASP&A05.07.202406.07.2024SHALLOW GASP&A