SIGYN
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing22.12.2002Approved for production31.08.200121.12.2002 -
Located in
Located in Block nameProd. licence16/7 -
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType31.08.2001Kongen i StatsrådPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE31.08.2001 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to16.05.201801.07.201715.05.201801.10.200430.06.201731.08.200130.09.2004 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO60.00000028.01.2022NO40.00000028.01.2022NO60.00000010.12.201927.01.2022NO40.00000010.12.201927.01.2022NO60.00000016.05.201809.12.2019NO40.00000016.05.201809.12.2019NO60.00000002.11.200915.05.2018NO40.00000002.11.200915.05.2018NO60.00000001.01.200901.11.2009NO40.00000001.01.200901.11.2009NO50.00000001.10.200731.12.2008NO40.00000001.10.200731.12.2008NO10.00000001.10.200731.12.2008NO50.00000001.01.200730.09.2007NO40.00000001.01.200730.09.2007NO10.00000001.01.200730.09.2007NO50.00000001.10.200431.12.2006NO40.00000001.10.200431.12.2006NO10.00000001.10.200431.12.2006NO50.00000031.08.200130.09.2004NO40.00000031.08.200130.09.2004NO10.00000031.08.200130.09.2004 -
Description
Description TypeTextDate updatedDevelopmentSigyn is a field in the central part of the North Sea, 12 kilometres southeast of the Sleipner Øst field. The water depth is 70 metres. Sigyn was discovered in 1982, and the plan for development and operation (PDO) was approved in 2001. The field is developed with a 4-slot subsea template tied-back to the Sleipner A facility. The production started in 2002.13.12.2023ReservoirThe Sigyn field produces gas and condensate from two separate accumulations, Sigyn West and Sigyn East. Sigyn West contains rich gas and condensate, while Sigyn East contains light oil. The reservoirs are in Triassic sandstone of the Skagerrak Formation, at a depth of 2700 metres.09.12.2023Recovery strategySigyn East is produced with pressure support from gas injection and Sigyn West is produced by pressure depletion.28.02.2023TransportThe well stream is sent through two pipelines to the Sleipner A facility. Sales gas is exported from Sleipner A via Gassled (Area D). Unstable oil is exported by pipeline to the Kårstø terminal for final processing.28.02.2023StatusThe field is in its late tail production phase. An infill well was put on production on Sigyn East in 2022 and the existing producer was converted to a gas injector. Production is limited by well performance and available flowlines. Currently, there is only production from Sigyn East. Production from Sigyn West is limited because the available flowlines are used to inject gas and produce oil from Sigyn East.09.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.25 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum345820226620213672020202019272018-72017122016880201544201402013020120201102010020090200812007120064200582004212003-1720021605200142120005 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum0.9675537.6007266.0419245.23715219.8473550.0389790.0300290.0000000.0079070.0769150.0592850.0546280.0000000.0132540.1271670.0658700.0608070.0000000.0134290.1401060.0313160.0720150.0000000.0213260.1246570.0624380.0670630.0000000.0373240.1668250.0498830.0952890.0000000.0405400.1857120.0654880.0991180.0000000.0418410.2064470.2749490.1388620.0000000.1232220.5370330.2170970.1817040.0000000.1308730.5296740.0683650.1790940.0000000.0737070.3211660.0338830.1781420.0210860.0740210.3071320.0000000.2719220.2062960.1761500.6543680.0000000.3350140.2751820.2236780.8338740.0000000.4376030.3428790.2750471.0555290.0000000.4110670.3422850.2556741.0090260.0000000.4846800.4402550.3701101.2950450.0000000.5455850.5083380.4378201.4917430.0000000.6493270.5979250.4924411.7396930.0000000.7159350.6463100.5009041.8631490.0000000.8437170.8724420.6573862.3735450.0000000.8358940.9013090.6595632.3967660.0000000.9132310.8876170.6109352.4117830.0000000.0000000.0000000.0000000.000000 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum0.0000008.05162413.60778321.6594070.0000000.0738670.0532490.1271160.0000000.1013630.0894280.1907910.0000000.0901820.0959730.1861550.0000000.0788440.0586180.1374620.0000000.0684530.1071950.1756480.0000000.0972640.1057040.2029680.0000000.0924330.1206240.2130570.0000000.1369970.4291780.5661750.0000000.1843710.3740320.5584030.0000000.1875610.1589690.3465300.0000000.1863880.1465820.3329700.0000000.2970370.4110410.7080780.0000000.3566970.5243840.8810810.0000000.4481290.6447851.0929140.0000000.4273760.6281181.0554940.0000000.5329480.9223981.4553460.0000000.5947791.0783131.6730920.0000000.6873881.2151671.9025550.0000000.7359631.2504751.9864380.0000000.8750121.7116112.5866230.0000000.8691721.7756022.6447740.0000000.9110421.6821452.5931870.0000000.0183580.0241920.042550 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
-
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent11.12.200112.04.2002PRODUCTIONGAS19.01.200210.03.2002PRODUCTIONGAS17.12.200125.03.2002PRODUCTIONOIL09.10.202123.10.2021PRODUCTIONOIL27.04.201613.06.2016PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus07.07.201109.07.2011PILOTP&A