SOLVEIG
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing29.09.2021Approved for production26.06.201928.09.2021 -
Located in
Located in Block nameProd. licence16/4 -
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType28.06.2023Godkjent av OEDPDO Exemption26.06.2019Godkjent av OEDPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE26.06.2019 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to01.01.202330.06.202231.12.202201.04.202029.06.202226.06.201931.03.2020 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO65.00000001.01.2023NO20.00000001.01.2023NO15.00000001.01.2023NO65.00000030.06.202231.12.2022NO20.00000030.06.202231.12.2022NO15.00000030.06.202231.12.2022NO65.00000001.04.202029.06.2022NO20.00000001.04.202029.06.2022NO15.00000001.04.202029.06.2022NO65.00000013.11.201931.03.2020NO20.00000013.11.201931.03.2020NO15.00000013.11.201931.03.2020NO65.00000026.06.201912.11.2019NO20.00000026.06.201912.11.2019NO15.00000026.06.201912.11.2019 -
Description
Description TypeTextDate updatedDevelopmentSolveig is a field in the North Sea, 15 kilometres south of the Edvard Grieg field. The water depth is 100 metres. Solveig was discovered in 2013, and subsequently delineated by appraisal wells in 2014, 2015 and 2018. The plan for development and operation (PDO) was approved in 2019. Solveig was originally developed with five single wells, tied-back to the Edvard Grieg field. The production started in 2021. A PDO exemption for a Phase 2 development was granted in 2023.14.12.2023ReservoirSolveig produces oil from sandstone and conglomerate of Triassic and presumably Devonian age. The main reservoir was formed in small basins along the southwestern flank of the South Utsira High. The reservoir contains oil with a small gas cap at a depth of 1900 metres and has varying quality.14.12.2023Recovery strategyThe field is produced by pressure support from water injection.28.02.2023TransportThe well stream is transported via the Edvard Grieg field and onward by pipeline to the Sture terminal. The gas is exported via the Scottish Area Gas Evacuation (SAGE) infrastructure to the St Fergus terminal in the UK.28.02.2023StatusSolveig Phase 2, which includes installation of two new subsea templates, is under development.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.7174 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum63262022612202125162020174720191438201813 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum2.4334290.3959360.0000000.3036673.1330320.9329940.1350560.0000000.0989381.1669880.9849050.1562600.0000000.1247781.2659430.4319540.0888900.0000000.0709510.5917950.0835760.0157300.0000000.0090000.108306 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum2.4838670.5194860.0000003.0033530.9533800.1857650.0000001.1391450.9996110.1998190.0000001.1994300.4411540.1125620.0000000.5537160.0897220.0213400.0000000.111062 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent11.03.201303.05.2013WILDCATP&AOIL/GAS19.06.201426.08.2014APPRAISALP&AOIL/GAS14.06.201516.08.2015APPRAISALP&AOIL07.02.201801.04.2018APPRAISALP&AOIL12.02.202110.04.2021WILDCATP&AOIL11.11.201329.12.2013APPRAISALP&ASHOWS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent27.05.202128.06.2021OBSERVATIONNOT APPLICABLE29.06.202115.07.2021PRODUCTIONOIL21.09.202111.10.2021OBSERVATIONNOT APPLICABLE13.10.202103.11.2021PRODUCTIONOIL15.08.202107.09.2021PRODUCTIONOIL01.01.202212.02.2022INJECTIONWATER20.11.202120.12.2021INJECTIONWATER -
Wellbores – other