    Generell informasjon
    Attributt Verdi
    Brønnbane navn
    Offisielt navn på brønnbanen ihht Sokkeldirektoratets retningslinjer for betegnelse på brønner og brønnbaner.
    6407/8-7
    Type
    Brønnbanetype. Lovlige verdier: EXPLORATION, DEVELOPMENT, OTHER (se 'Formål' for mer informasjon)
    EXPLORATION
    Formål
    Endelig klassifisering av brønnbanen.

    Lovlige verdier for letebrønnbaner: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS.

    Lovlige verdier for utvinningsbrønnbaner:
    OBSERVATION, PRODUCTION, INJECTION, INJECTION-CCS, OBSERVATION-CCS.

    Lovlig verdier for andre brønnbaner:
    SOIL DRILLING (boring ifm trase og andre grunnundersøkelser som gjøres for å undersøke grunnforholdene i forkant av plassering av innretninger),
    SHALLOW GAS (undersøke grunn gass før første boring på lokasjon),
    PILOT (undersøke geologi og væskekontakter for plassering av hovedbrønnbanen),
    SCIENTIFIC (bores ihhtLov om vitenskapelige undersøkelser),
    STRATIGRAPHIC (bores ihht Petroleumsloven §2-1).
    WILDCAT
    Status
    Status for brønnbanen. Lovlige verdier:

    BLOWOUT: Det har vært blowout i brønnen.
    CLOSED: Utvinningsbrønnbane som er stengt for produksjon/injeksjon i kortere eller lengre periode. Statusen er også brukt på ferdig borete brønnbaner, der månedlig produksjon/injeksjon ikke har blitt rapportert enda.
    DRILLING: Brønnen er i borefasen. Kan være i aktiv boring, logging, testing eller plugging.
    JUNKED: Boringen ble avsluttet pga tekniske problemer,
    P&A: For letebrønnbane: brønnbanen er plugget og forlatt, og kan ikke re-entres for videre bruk. For utvinningsbrønnbane: produksjon/injeksjon er avsluttet og brønnen er plugget. Brønnhodet er fjernet eller på annet vis gjort utilgjengelig for nye brønnoperasjoner.
    PLUGGED: Brønnbane som er plugget, men øvre deler av brønnbanen kan brukes til å bore nye sidesteg mot nye boremål.
    PRODUCING: Det ble produsert fra brønnbanen ved operatørens siste månedlige innrapportering til Sokkeldirektoratet.
    INJECTING: Det ble injisert i brønnbanen ved operatørens siste månedlige innrapportering til Sokkeldirektoratet.
    SUSPENDED: Brønnbane der boringen er midlertidig stoppet. Rettighetshaverne planlegger å fortsette boringen på et senere tidspunkt.
    WILL NEVER BE DRILLED: Brønnbane som er registrert med navn og WellID av Sokkeldirektoratet, men som av ulike årsaker ikke vil bli boret.
    P&A
    Pressemelding
    Faktakart i nytt vindu
    Hovedområde
    Navn på området på norsk koninentalsokkel hvor brønnbanen ligger. Lovlige verdier: BARENTS SEA, NORWEGIAN SEA, NORTH SEA.
    NORWEGIAN SEA
    Brønn navn
    Offisielt navn på brønnen som brønnbanen tilhører ihht Sokkeldirektoratets retningslinjer for betegnelse på brønner og brønnbaner.
    6407/8-7
    Seismisk lokalisering
    Brønnbanens lokalisering (ved spud-posisjon) på seismiske linjer. SP: Skuddpunkt.
    ST10021Z14 : inline 1617 & crossline 1871
    Utvinningstillatelse
    Offisielt navn på utvinningstillatelsen som brønnbanen ble boret eller planlegges boret ut fra (brønnhodeposisjonen).
    Boreoperatør
    Navn på rettighetshaver som på vegne av den aktive utvinningstillatelsen (ved brønnhodeposisjon) starter boreoperasjonen. Dette tilsvarer vanligvis operatørselskapet for den aktuelle utvinningstillatelsen.
    Statoil Petroleum AS
    Boretillatelse
    Boretillatelsesnummer sammen med versjon av boretillatelsen som angitt i boretillatelsen gitt av Sokkeldirektoratet.
    1576-L
    Boreinnretning
    Sokkeldirektoratets navn på innretningen som brønnbanen ble boret fra.
    Boredager
    Antall dager fra borestart til boreslutt.
    16
    Borestart
    Dato borekrona trengte gjennom jordskorpa. For sidesteg: Datoen ny formasjon blir boret, se også utboringsdyp.
    27.04.2015
    Boreslutt
    Letebrønner fra flyttbare innretninger:
    For flytende innretninger - dato når ankerhåndteringen startet.For oppjekkbare innretninger - dato for oppstart av nedjekking.
    Letebrønner fra faste innretninger og alle utvinningsbrønner:
    Dato for når totalt dyp er nådd og siste foringsrør, casing eller screen er satt. Ved umiddelbar plugging av brønnbanen, tilsvarer boreslutt datoen siste plugg er satt.
    12.05.2015
    Frigitt dato
    Dato for når rådata som er innrapportert til myndighetene fra brønnen ikke lenger er undergitt taushetsplikt. Normalt ca 2 år etter boreslutt. Kan være tidligere hvis arealet for utvinningstillatelsen er tilbakelevert.
    12.05.2017
    Publiseringsdato
    Dato kvalitetskontroll av informasjon om brønnbanen ble ferdig, slik at den kan publiseres på internett som en 'Well Data Summary Sheet brønnbane', dvs. med mer informasjon tilgjengelig enn for andre brønnbaner.
    12.05.2017
    Opprinnelig formål
    Formålet med brønnbanen definert før borestart.Lovlige verdier for letebrønnbaner: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS. Eksempler på lovlige verdier for utvinningsbrønnbaner: OBSERVATION, PRODUCTION, INJECTION.
    WILDCAT
    Gjenåpnet
    Status om brønnbanen er gjenåpnet (YES) eller ikke (NO). Når en teller antall brønnbaner på norsk sokkel, teller en bare de som ikke er gjenåpnet (NO).
    NO
    Innhold
    For letebrønnbaner, funn status.

    Lovlige verdier: DRY, SHOWS (spor av hydrokarboner), GAS, GAS/CONDENSATE, OIL eller OIL/GAS.
    SHOWS (GAS SHOWS, OIL SHOWS eller OIL/GAS SHOWS) er oppdaget som fluorescerende kutt (organisk ekstrakt), lukt av petroleum, eller synlig belegg på borekaks eller borekjerner, eller som økte gassavlesninger i slamloggerens detekteringsutstyr.
    Lovlige verdier for WILDCAT-CCS og APPRAISAL-CCS: WATER

    For utvinningsbrønnbaner, type produsert eller injisert fluid.
    Lovlige verdier: WATER, CUTTINGS, NOT AVAILABLE, OIL, GAS/CONDENSATE, OIL/GAS, CO2, GAS, WATER/GAS, NOT APPLICABLE.
    DRY
    Funnbrønnbane
    Indikator som forteller om brønnbanen påviste et nytt funn. Lovlige verdier: YES, NO. For brønnbaner der resultatet ikke er pressemeldt eller på annet vis avklart, blir «NO» benyttet.
    NO
    Avstand, boredekk - midlere havflate [m]
    Avstand i meter mellom boredekk og midlere havnivå (RKB).
    40.0
    Vanndybde ved midlere havflate [m]
    Dybde i meter mellom midlere havflate og havbunn.
    259.0
    Totalt målt dybde (MD) [m RKB]
    Målt lengde av brønnbanen fra boredekket til bunnen av brønnbanen ("driller`s depth").
    3030.0
    Totalt vertikalt dybde (TVD) [m RKB]
    Vertikalt dybde fra dypet ved slutten av brønnbanen til boredekket. Vises bare på brønner som er frigitt. Referert til som sant vertikalt dyp (TVD: TrueVerticalDepth).
    3030.0
    Maks inklinasjon [°]
    Maksimum avvik, i grader, fra vertikal brønnbane. Vises bare på brønner som er frigitt.
    0.9
    Eldste penetrerte alder
    Alder (iflg. Geologic Time Scale 2004 by F. M. Gradstein, et al. (2004)) til den eldste formasjonen det er blitt boret gjennom. Kan avvike fra alder ved TD for eksempel i avviksbrønner. Eksempler for lovlige verdier: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EARLY PERMIAN, EARLY TRIASSIC, EOCENE.
    EARLY JURASSIC
    Eldste penetrerte formasjon
    Navn på den eldste litostratigrafiske enheten som brønnbanen har penetrert. Vises bare på brønner som er frigitt. I de fleste brønnbaner er dette formasjonen eller gruppen påtruffet i bunnen av brønnbanen. Kan avvike fra formasjonen eller gruppen ved TD for eksempel i brønnbaner som er boret med høy avvik eller gjennom forkastninger. Eksempler på lovlige verdier: AMUNDSEN FM, BALDER FM, BASEMENT, BLODØKS FM, BRYNE FM, BURTON FM, COOK FM, DRAKE FM, DRAUPNE FM, EKOFISK FM, SHETLAND GP.
    ÅRE FM
    Geodetisk datum
    Referansesystem for koordinater. Eksempel på lovlige verdier: ED50.
    ED50
    NS grader
    Geografisk koordinat for brønnhode, nord-sør grader.
    64° 23' 4.27'' N
    ØV grader
    Geografisk koordinat for brønnhode, øst-vest grader.
    7° 33' 42.94'' E
    NS UTM [m]
    Universal Transverse Mercator koodinat for brønnhode, nord-sør.
    7140825.54
    ØV UTM [m]
    Universal Transverse Mercator koodinat for brønnhode, øst-vest.
    430630.00
    UTM sone
    Universal Transverse Mercator sone. Eksempel på lovlige verdier: 31, 32, 33, 34.
    32
    NPDID for brønnbanen
    Sokkeldirektoratets entydige nøkkel for brønnbanen.
    7684
  • Brønnhistorie

    General
    Well 6407/8-7 and its sidetrack 6407/8-7 A were drilled to test the Bister prospect about four kilometres north of the Hyme field in the southern part of the Norwegian Sea and 140 kilometres north of Kristiansund. The objective of the main wellbore 6407/8-7 was to test the hydrocarbon potential in the Ile Formation. The secondary objective was to test the potential in the Tilje and Åre Formations.
    Operations and results
    Wildcat well 6407/8-7 was spudded with the semi-submersible installation Transocean Spitsbergen on 12 May 2015 and drilled to TD at 3030 m in the Early Jurassic Åre Formation. No significant problem was encountered in the operations. The well was drilled with seawater and polymer based hi-vis sweeps down to 1055 m, and with EMS-4400 oil based mud from 1055 m to TD. Due to corals in the area, environmental restrictions allowed no solids in the mud.
    The well encountered about 95 m of the Ile formation, of which 70 m were sandstone with good reservoir properties. The Tilje and Åre formations were also encountered, in thicknesses of 200 m and 170 m respectively, of which 160 m and 75 m respectively are sandstone with good reservoir quality. The well is dry. Some shows were observed on cuttings in both the main well and the sidetrack. However, when using OBM most HC's will be washed out and/or masked by the oil base in the mud. Preliminary post well analysis confirms that the shows observed on cuttings were from the OBM and not formation.
    No cores were cut. No fluid sample was taken. Formation pressure were measured with the stethoscope tool during wipertrip, post drilling. The valid pressures plot on two water gradients: one through Ile and Tofte, and a second with ca 2 bar higher pressure through the Tilje Formation.
    The well was plugged back for sidetracking on 12 May 2015. It is classified as a dry well.
    Testing
    No drill stem test was performed.
  • Borekaks i Sokkeldirektoratet

    Borekaks i Sokkeldirektoratet
    Borekaks tilgjengelig for prøvetaking?
    YES
    Borekaks i Sokkeldirektoratet
    Borekaksprøve, topp dybde [m]
    Borekaksprøve, bunn dybde [m]
    1060.00
    3030.00
  • Palynologiske preparater i Sokkeldirektoratet

    Palynologiske preparater i Sokkeldirektoratet
    Prøve dybde
    Dybde enhet
    Prøve type
    Laboratorie
    1300.0
    [m]
    DC
    APT
    1320.0
    [m]
    DC
    APT
    1360.0
    [m]
    DC
    APT
    1380.0
    [m]
    DC
    APT
    1420.0
    [m]
    DC
    APT
    1440.0
    [m]
    DC
    APT
    1460.0
    [m]
    DC
    APT
    1480.0
    [m]
    DC
    APT
    1500.0
    [m]
    DC
    APT
    1520.0
    [m]
    DC
    APT
    1540.0
    [m]
    DC
    APT
    1560.0
    [m]
    DC
    APT
    1580.0
    [m]
    DC
    APT
    1600.0
    [m]
    DC
    APT
    1620.0
    [m]
    DC
    APT
    1640.0
    [m]
    DC
    APT
    1700.0
    [m]
    DC
    APT
    1720.0
    [m]
    DC
    APT
    1740.0
    [m]
    DC
    APT
    1760.0
    [m]
    DC
    APT
    1780.0
    [m]
    DC
    APT
    1800.0
    [m]
    DC
    APT
    1820.0
    [m]
    DC
    APT
    1840.0
    [m]
    DC
    APT
    1860.0
    [m]
    DC
    APT
    1880.0
    [m]
    DC
    APT
    1900.0
    [m]
    DC
    APT
    1920.0
    [m]
    DC
    APT
    1940.0
    [m]
    DC
    APT
    1960.0
    [m]
    DC
    APT
    1980.0
    [m]
    DC
    APT
    2000.0
    [m]
    DC
    APT
    2020.0
    [m]
    DC
    APT
    2040.0
    [m]
    DC
    APT
    2060.0
    [m]
    DC
    APT
    2080.0
    [m]
    DC
    APT
    2100.0
    [m]
    DC
    APT
    2120.0
    [m]
    DC
    APT
    2140.0
    [m]
    DC
    APT
    2160.0
    [m]
    DC
    APT
    2180.0
    [m]
    DC
    APT
    2200.0
    [m]
    DC
    APT
    2220.0
    [m]
    DC
    APT
    2240.0
    [m]
    DC
    APT
    2260.0
    [m]
    DC
    APT
    2280.0
    [m]
    DC
    APT
    2300.0
    [m]
    DC
    APT
    2320.0
    [m]
    DC
    APT
    2340.0
    [m]
    DC
    APT
    2360.0
    [m]
    DC
    APT
    2380.0
    [m]
    DC
    APT
    2386.0
    [m]
    DC
    APT
    2392.0
    [m]
    DC
    APT
    2398.0
    [m]
    DC
    APT
    2407.0
    [m]
    DC
    APT
    2413.0
    [m]
    DC
    APT
    2419.0
    [m]
    DC
    APT
    2425.0
    [m]
    DC
    APT
    2434.0
    [m]
    DC
    APT
    2440.0
    [m]
    DC
    APT
    2446.0
    [m]
    DC
    APT
    2452.0
    [m]
    DC
    APT
    2455.0
    [m]
    DC
    APT
    2458.0
    [m]
    DC
    APT
    2461.0
    [m]
    DC
    APT
    2464.0
    [m]
    DC
    APT
    2467.0
    [m]
    DC
    APT
    2470.0
    [m]
    DC
    APT
    2473.0
    [m]
    DC
    APT
    2476.0
    [m]
    DC
    APT
    2479.0
    [m]
    DC
    APT
    2482.0
    [m]
    DC
    APT
    2485.0
    [m]
    DC
    APT
    2488.0
    [m]
    DC
    APT
    2491.0
    [m]
    DC
    APT
    2494.0
    [m]
    DC
    APT
    2497.0
    [m]
    DC
    APT
    2500.0
    [m]
    DC
    APT
    2503.0
    [m]
    DC
    APT
    2506.0
    [m]
    DC
    APT
    2509.0
    [m]
    DC
    APT
    2512.0
    [m]
    DC
    APT
    2515.0
    [m]
    DC
    APT
    2518.0
    [m]
    DC
    APT
    2521.0
    [m]
    DC
    APT
    2524.0
    [m]
    DC
    APT
    2527.0
    [m]
    DC
    APT
    2530.0
    [m]
    DC
    APT
    2533.0
    [m]
    DC
    APT
    2536.0
    [m]
    DC
    APT
    2539.0
    [m]
    DC
    APT
    2542.0
    [m]
    DC
    APT
    2545.0
    [m]
    DC
    APT
    2548.0
    [m]
    DC
    APT
    2551.0
    [m]
    DC
    APT
    2554.0
    [m]
    DC
    APT
    2557.0
    [m]
    DC
    APT
    2560.0
    [m]
    DC
    APT
    2563.0
    [m]
    DC
    APT
    2566.0
    [m]
    DC
    APT
    2569.0
    [m]
    DC
    APT
    2572.0
    [m]
    DC
    APT
    2575.0
    [m]
    DC
    APT
    2578.0
    [m]
    DC
    APT
    2581.0
    [m]
    DC
    APT
    2584.0
    [m]
    DC
    APT
    2587.0
    [m]
    DC
    APT
    2590.0
    [m]
    DC
    APT
    2593.0
    [m]
    DC
    APT
    2596.0
    [m]
    DC
    APT
    2599.0
    [m]
    DC
    APT
    2602.0
    [m]
    DC
    APT
    2605.0
    [m]
    DC
    APT
    2608.0
    [m]
    DC
    APT
    2611.0
    [m]
    DC
    APT
    2614.0
    [m]
    DC
    APT
    2617.0
    [m]
    DC
    APT
    2620.0
    [m]
    DC
    APT
    2623.0
    [m]
    DC
    APT
    2626.0
    [m]
    DC
    APT
    2629.0
    [m]
    DC
    APT
    2632.0
    [m]
    DC
    APT
    2635.0
    [m]
    DC
    APT
    2638.0
    [m]
    DC
    APT
    2641.0
    [m]
    DC
    APT
    2644.0
    [m]
    DC
    APT
    2647.0
    [m]
    DC
    APT
    2650.0
    [m]
    DC
    APT
    2653.0
    [m]
    DC
    APT
    2656.0
    [m]
    DC
    APT
    2659.0
    [m]
    DC
    APT
    2662.0
    [m]
    DC
    APT
    2665.0
    [m]
    DC
    APT
    2668.0
    [m]
    DC
    APT
    2671.0
    [m]
    DC
    APT
    2674.0
    [m]
    DC
    APT
    2677.0
    [m]
    DC
    APT
    2680.0
    [m]
    DC
    APT
    2683.0
    [m]
    DC
    APT
    2686.0
    [m]
    DC
    APT
    2689.0
    [m]
    DC
    APT
    2692.0
    [m]
    DC
    APT
    2695.0
    [m]
    DC
    APT
    2698.0
    [m]
    DC
    APT
    2701.0
    [m]
    DC
    APT
    2704.0
    [m]
    DC
    APT
    2707.0
    [m]
    DC
    APT
    2710.0
    [m]
    DC
    APT
    2713.0
    [m]
    DC
    APT
    2716.0
    [m]
    DC
    APT
    2719.0
    [m]
    DC
    APT
    2722.0
    [m]
    DC
    APT
    2722.0
    [m]
    DC
    APT
    2728.0
    [m]
    DC
    APT
    2731.0
    [m]
    DC
    APT
    2734.0
    [m]
    DC
    APT
    2737.0
    [m]
    DC
    APT
    2740.0
    [m]
    DC
    APT
    2743.0
    [m]
    DC
    APT
    2746.0
    [m]
    DC
    APT
    2749.0
    [m]
    DC
    APT
    2752.0
    [m]
    DC
    APT
    2755.0
    [m]
    DC
    APT
    2758.0
    [m]
    DC
    APT
    2761.0
    [m]
    DC
    APT
    2764.0
    [m]
    DC
    APT
    2767.0
    [m]
    DC
    APT
    2770.0
    [m]
    DC
    APT
    2773.0
    [m]
    DC
    APT
    2776.0
    [m]
    DC
    APT
    2779.0
    [m]
    DC
    APT
    2782.0
    [m]
    DC
    APT
    2785.0
    [m]
    DC
    APT
    2788.0
    [m]
    DC
    APT
    2791.0
    [m]
    DC
    APT
    2794.0
    [m]
    DC
    APT
    2797.0
    [m]
    DC
    APT
    2800.0
    [m]
    DC
    APT
    2809.0
    [m]
    DC
    APT
    2818.0
    [m]
    DC
    APT
    2827.0
    [m]
    DC
    APT
    2836.0
    [m]
    DC
    APT
    2845.0
    [m]
    DC
    APT
    2854.0
    [m]
    DC
    APT
    2863.0
    [m]
    DC
    APT
    2872.0
    [m]
    DC
    APT
    2881.0
    [m]
    DC
    APT
    2890.0
    [m]
    DC
    APT
    2899.0
    [m]
    DC
    APT
    2908.0
    [m]
    DC
    APT
    2917.0
    [m]
    DC
    APT
    2926.0
    [m]
    DC
    APT
    2935.0
    [m]
    DC
    APT
    2944.0
    [m]
    DC
    APT
    2953.0
    [m]
    DC
    APT
    2962.0
    [m]
    DC
    APT
    2971.0
    [m]
    DC
    APT
    2980.0
    [m]
    DC
    APT
    2989.0
    [m]
    DC
    APT
    2997.0
    [m]
    DC
    APT
  • Litostratigrafi

  • Logger

    Logger
    Type logg
    Topp dyp for logg [m]
    Bunn dyp for logg [m]
    AIT MSIP PPC TLD HNGS GR
    307
    1353
    AIT MSIP PPC TLD HNGS GR
    1055
    1464
    MDT GR
    1055
    1353
    MSIP GR
    1055
    1463
    MWD - GR RES
    352
    1055
    MWD - GR RES DEN NEU CALI
    1055
    3030
    MWD - GR RES FPWD SON
    1055
    3030
    MWD - MSIP TLD HNGS GR
    1055
    1353
    TLC MDT PPC GR
    1055
    1502
  • Foringsrør og formasjonsstyrketester

    Foringsrør og formasjonsstyrketester
    Type utforing
    Utforing diam.
    [tommer]
    Utforing dybde
    [m]
    Brønnbane diam.
    [tommer]
    Brønnbane dyp
    [m]
    LOT/FIT slam eqv.
    [g/cm3]
    Type formasjonstest
    CONDUCTOR
    30
    350.0
    36
    352.0
    0.00
    INTERM.
    13 3/8
    1045.0
    17 1/2
    1055.0
    0.00
    1058.0
    1058.0
    1.54
    FIT
    OPEN HOLE
    3030.0
    12 1/4
    3030.0
    0.00
  • Boreslam

    Boreslam
    Dybde MD [m]
    Egenvekt, slam [g/cm3]
    Viskositet, slam [mPa.s]
    Flytegrense [Pa]
    Type slam
    Dato, måling
    1058
    1.43
    21.0
    EMS 4400
    1193
    1.32
    18.0
    EMS 4400
    1412
    1.43
    23.0
    EMS 4400
    1903
    1.33
    18.0
    EMS 4400
    2539
    1.33
    15.0
    EMS 4400
    2893
    1.33
    16.0
    EMS 4400
    3030
    1.39
    17.0
    EMS 4400