BØYLA
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing19.01.2015Approved for production26.10.201218.01.2015 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType08.07.2022PUD for FroskPDO26.10.2012Kongen i statsrådPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE26.10.2012 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to30.09.201631.10.201429.09.201616.10.201430.11.201426.10.201215.10.2014 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO80.00000031.10.2024NO20.00000031.10.2024NO80.00000001.01.202330.10.2024NO20.00000001.01.202330.10.2024NO65.00000030.06.202231.12.2022NO20.00000030.06.202231.12.2022NO15.00000030.06.202231.12.2022NO65.00000028.01.202229.06.2022NO20.00000028.01.202229.06.2022NO15.00000028.01.202229.06.2022NO65.00000001.04.202027.01.2022NO20.00000001.04.202027.01.2022NO15.00000001.04.202027.01.2022NO65.00000010.12.201831.03.2020NO20.00000010.12.201831.03.2020NO15.00000010.12.201831.03.2020NO65.00000030.09.201609.12.2018NO20.00000030.09.201609.12.2018NO15.00000030.09.201609.12.2018NO65.00000026.05.201629.09.2016NO20.00000026.05.201629.09.2016NO15.00000026.05.201629.09.2016NO65.00000031.10.201425.05.2016NO20.00000031.10.201425.05.2016NO15.00000031.10.201425.05.2016NO65.00000016.10.201430.10.2014NO20.00000016.10.201430.10.2014NO15.00000016.10.201430.10.2014NO65.00000028.06.201315.10.2014NO20.00000028.06.201315.10.2014NO15.00000028.06.201315.10.2014NO65.00000026.10.201227.06.2013NO20.00000026.10.201227.06.2013NO15.00000026.10.201227.06.2013 -
Description
Description TypeTextDate updatedDevelopmentBøyla is a field in the central part of the North Sea, 28 kilometres south of the Alvheim field. The water depth is 120 metres. Bøyla was discovered in 2009, and the plan for development and operation (PDO) was approved in 2012. The field is developed with a subsea template including two horizontal production wells and one water injection well. The field is tied-back to the Alvheim production, storage and offloading vessel (FPSO). The production started in 2015. Test production from the nearby discovery 24/9-12 S (Frosk) started in 2019 and provided the basis for a PDO approved in 2022 for including Frosk in the Bøyla field.13.12.2023ReservoirBøyla produces oil from sandstone of late Paleocene to early Eocene age in the Hermod Formation. The reservoir is of good quality and lies in a channelised submarine fan system at a depth of 2100 metres.13.12.2023Recovery strategyThe field is produced with pressure support from water injection. Gas lift is also necessary to support flow in the wells.28.02.2023TransportThe well stream is transported by pipeline to the Alvheim FPSO, where the oil is stabilised and stored before it is exported by tankers. Processed rich gas is transported by pipeline from Alvheim to the Scottish Area Gas Evacuation (SAGE) pipeline on the UK continental shelf.28.02.2023StatusProduction from the Bøyla wells is decreasing and the wells are produced alternating with the Frosk wells.13.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.390 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum697320221344202118620200201922018192017262016-712015432201432602013127620124142011852010020090 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum3.7249220.3214240.0000000.0000004.0463460.2567120.0175210.0000000.0000000.2742330.3832760.0221800.0000000.0000000.4054560.1316510.0181060.0000000.0000000.1497570.1510460.0117390.0000000.0000000.1627850.4815480.0280730.0000000.0000000.5096210.3335470.0265880.0000000.0000000.3601350.2353580.0292190.0000000.0000000.2645770.3658570.0387820.0000000.0000000.4046390.6245570.0578260.0000000.0000000.6823830.7613700.0713900.0000000.0000000.832760 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum3.7249220.3566300.0000004.0815520.2567120.0225070.0000000.2792190.3832760.0264530.0000000.4097290.1316510.0204830.0000000.1521340.1510460.0146780.0000000.1657240.4815480.0318550.0000000.5134030.3335470.0296100.0000000.3631570.2353580.0317670.0000000.2671250.3658570.0421340.0000000.4079910.6245570.0608070.0000000.6853640.7613700.0763360.0000000.837706 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent07.10.200915.10.2009APPRAISALP&AOIL15.10.200925.10.2009APPRAISALP&AOIL12.09.200907.10.2009WILDCATP&AOIL09.02.201825.02.2018APPRAISALP&AOIL/GAS29.12.201708.02.2018WILDCATP&AOIL19.04.201924.04.2019APPRAISALPLUGGEDOIL -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent13.04.201410.05.2014OBSERVATIONOIL11.05.201414.05.2014OBSERVATIONOIL16.05.201423.06.2014PRODUCTIONOIL19.04.201417.03.2015PRODUCTIONOIL07.04.201401.06.2014OBSERVATIONOIL02.06.201417.08.2014INJECTIONWATER14.03.201918.05.2019PRODUCTIONOIL19.05.201931.05.2019PRODUCTIONOIL01.06.201914.06.2019PRODUCTIONOIL04.10.202203.11.2022PRODUCTIONOIL08.10.202201.12.2022PRODUCTIONOIL02.12.202207.12.2022PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus