IVAR AASEN
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing24.12.2016Approved for production21.05.201323.12.2016 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType21.05.2013Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to dateBUSINESS ARRANGEMENT AREA30.06.2014PRODUCTION LICENSE21.05.201329.06.2014 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to30.09.201621.05.201329.09.2016 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO41.47300001.01.2023NO36.17120001.01.2023NO12.31730001.01.2023NO9.23850001.01.2023NO0.80000001.01.2023NO41.47300001.11.202231.12.2022NO34.78620001.11.202231.12.2022NO12.31730001.11.202231.12.2022NO9.23850001.11.202231.12.2022NO1.38500001.11.202231.12.2022NO0.80000001.11.202231.12.2022NO41.47300030.06.202231.10.2022NO34.78620030.06.202231.10.2022NO12.31730030.06.202231.10.2022NO6.46150030.06.202231.10.2022NO2.77700030.06.202231.10.2022NO1.38500030.06.202231.10.2022NO0.80000030.06.202231.10.2022NO41.47300031.05.202229.06.2022NO34.78620031.05.202229.06.2022NO12.31730031.05.202229.06.2022NO6.46150031.05.202229.06.2022NO2.77700031.05.202229.06.2022NO1.38500031.05.202229.06.2022NO0.80000031.05.202229.06.2022NO41.47300031.03.202230.05.2022NO34.78620031.03.202230.05.2022NO12.31730031.03.202230.05.2022NO6.46150031.03.202230.05.2022NO2.77700031.03.202230.05.2022NO1.38500031.03.202230.05.2022NO0.80000031.03.202230.05.2022NO41.47300001.04.202030.03.2022NO34.78620001.04.202030.03.2022NO12.31730001.04.202030.03.2022NO6.46150001.04.202030.03.2022NO3.02300001.04.202030.03.2022NO1.38500001.04.202030.03.2022NO0.55400001.04.202030.03.2022NO41.47300013.11.201931.03.2020NO34.78620013.11.201931.03.2020NO12.31730013.11.201931.03.2020NO6.46150013.11.201931.03.2020NO3.02300013.11.201931.03.2020NO1.38500013.11.201931.03.2020NO0.55400013.11.201931.03.2020NO41.47300016.05.201912.11.2019NO34.78620016.05.201912.11.2019NO12.31730016.05.201912.11.2019NO6.46150016.05.201912.11.2019NO3.02300016.05.201912.11.2019NO1.38500016.05.201912.11.2019NO0.55400016.05.201912.11.2019NO41.47300004.12.201815.05.2019NO34.78620004.12.201815.05.2019NO12.31730004.12.201815.05.2019NO6.46150004.12.201815.05.2019NO3.02300004.12.201815.05.2019NO1.38500004.12.201815.05.2019NO0.55400004.12.201815.05.2019NO41.47300003.12.201803.12.2018NO34.78620003.12.201803.12.2018NO12.31730003.12.201803.12.2018NO6.46150003.12.201803.12.2018NO3.02300003.12.201803.12.2018NO1.38500003.12.201803.12.2018NO0.55400003.12.201803.12.2018NO41.47300012.10.201802.12.2018NO34.78620012.10.201802.12.2018NO12.31730012.10.201802.12.2018NO6.46150012.10.201802.12.2018NO3.02300012.10.201802.12.2018NO1.38500012.10.201802.12.2018NO0.55400012.10.201802.12.2018NO41.47300016.05.201811.10.2018NO34.78620016.05.201811.10.2018NO12.31730016.05.201811.10.2018NO6.46150016.05.201811.10.2018NO3.02300016.05.201811.10.2018NO1.38500016.05.201811.10.2018NO0.55400016.05.201811.10.2018NO41.47300022.12.201715.05.2018NO34.78620022.12.201715.05.2018NO12.31730022.12.201715.05.2018NO6.46150022.12.201715.05.2018NO3.02300022.12.201715.05.2018NO1.38500022.12.201715.05.2018NO0.55400022.12.201715.05.2018NO41.47300011.12.201721.12.2017NO34.78620011.12.201721.12.2017NO12.31730011.12.201721.12.2017NO6.46150011.12.201721.12.2017NO3.02300011.12.201721.12.2017NO1.38500011.12.201721.12.2017NO0.55400011.12.201721.12.2017NO41.47300030.09.201610.12.2017NO34.78620030.09.201610.12.2017NO12.31730030.09.201610.12.2017NO6.46150030.09.201610.12.2017NO3.02300030.09.201610.12.2017NO1.38500030.09.201610.12.2017NO0.55400030.09.201610.12.2017NO41.47300008.07.201629.09.2016NO34.78620008.07.201629.09.2016NO12.31730008.07.201629.09.2016NO6.46150008.07.201629.09.2016NO3.02300008.07.201629.09.2016NO1.38500008.07.201629.09.2016NO0.55400008.07.201629.09.2016NO41.47300030.09.201407.07.2016NO34.78620030.09.201407.07.2016NO12.31730030.09.201407.07.2016NO6.46150030.09.201407.07.2016NO3.02300030.09.201407.07.2016NO1.38500030.09.201407.07.2016NO0.55400030.09.201407.07.2016NO41.47300029.08.201429.09.2014NO31.76320029.08.201429.09.2014NO12.31730029.08.201429.09.2014NO6.46150029.08.201429.09.2014NO3.02300029.08.201429.09.2014NO3.02300029.08.201429.09.2014NO1.38500029.08.201429.09.2014NO0.55400029.08.201429.09.2014NO41.47300030.06.201428.08.2014NO28.74020030.06.201428.08.2014NO12.31730030.06.201428.08.2014NO6.46150030.06.201428.08.2014NO3.02300030.06.201428.08.2014NO3.02300030.06.201428.08.2014NO3.02300030.06.201428.08.2014NO1.38500030.06.201428.08.2014NO0.55400030.06.201428.08.2014NO50.00000021.05.201329.06.2014NO35.00000021.05.201329.06.2014NO15.00000021.05.201329.06.2014 -
Description
Description TypeTextDate updatedDevelopmentIvar Aasen is a field in the northern part of the North Sea, 30 kilometres south of the Grane and Balder fields. The water depth is 110 metres. Ivar Aasen was discovered in 2008, and the plan for development and operation (PDO) was approved in 2013. The development comprises a production, drilling and quarters (PDQ) platform with a steel jacket and a separate jack-up rig for drilling and completion. The production started in 2016. The platform is equipped for tie-in of a subsea template planned for the development of the Hanz field, and for possible development of other nearby discoveries. First stage processing is carried out on the Ivar Aasen platform, and the partly processed fluids are transported to the Edvard Grieg platform for final processing and export. Ivar Aasen is supplied with power from shore since 2023.13.12.2023ReservoirIvar Aasen produces oil from sandstone reservoirs. The field consists of the 16/1-9 Ivar Aasen discovery and the small 16/1-7 (West Cable) discovery. The reservoir in the Ivar Aasen discovery consists of fluvial sandstone of Late Triassic to Middle Jurassic age in the Skagerrak and Sleipner Formations and shallow marine sandstone in the Middle Jurassic Hugin Formation. The reservoir is at a depth of 2400 metres. It is compartmentalised and has moderate to good quality. Parts of the reservoir have an overlying gas cap. The reservoir in the West Cable discovery is in fluvial sandstone in the Middle Jurassic Sleipner Formation. It is at a depth of 2950 metres and has moderate quality.13.12.2023Recovery strategyThe Ivar Aasen reservoir is produced by pressure support from water injection. The West Cable reservoir is produced by pressure depletion.28.02.2023TransportOil and gas are transported to the Edvard Grieg platform for final processing. The oil is exported by pipeline to the Grane Oil Pipeline, which is connected to the Sture terminal. The gas is exported in a separate pipeline to the Scottish Area Gas Evacuation (SAGE) system in the UK.28.02.2023StatusSince production start-up, additional injection and production wells have been drilled. Ivar Aasen production is on decline. The Hanz field and the discovery 16/1-29 S Symra are under development and will be tied-back to Ivar Aasen.13.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.1162 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum313702022107820217932020144020191770201812512017259620165926201590442014516720132305 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum17.4870293.3531660.0000001.17641822.0166110.8917420.2626130.0000000.1011271.2554821.5126320.3356090.0000000.1356721.9839131.5744110.2917120.0000000.1225651.9886882.2168050.4102260.0000000.1406402.7676712.7812150.4408120.0000000.1639143.3859403.1253000.3887930.0000000.1425863.6566793.0739610.6387920.0000000.1964843.9092362.2879860.5805620.0000000.1734303.0419780.0229770.0040470.0000000.0000000.027024 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum17.4547394.3637060.00000021.8184451.3974990.3956700.0000001.7931691.4524330.3994280.0000001.8518611.4773640.3926230.0000001.8699872.1750430.5367110.0000002.7117542.7182590.5644380.0000003.2826973.0180970.5475500.0000003.5656472.9646240.7834950.0000003.7481192.2238020.7335950.0000002.9573970.0276180.0101960.0000000.037814 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent04.07.197607.08.1976APPRAISALP&AOIL29.04.200428.05.2004WILDCATP&AOIL19.02.200822.04.2008WILDCATP&AOIL/GAS23.02.201026.04.2010APPRAISALP&AOIL/GAS26.04.201009.05.2010APPRAISALP&AOIL23.10.201207.12.2012WILDCATP&AOIL07.12.201201.01.2013APPRAISALP&AOIL13.08.201325.10.2013WILDCATP&ADRY03.03.201520.04.2015APPRAISALP&AOIL21.01.201503.03.2015APPRAISALP&AOIL27.05.201504.06.2015APPRAISALP&AOIL04.06.201514.06.2015APPRAISALP&AOIL24.04.201527.05.2015APPRAISALP&AOIL -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent25.11.201507.12.2015INJECTIONWATER12.04.201730.04.2017INJECTIONWATER05.06.201717.06.2017INJECTIONWATER26.04.201612.05.2016INJECTIONWATER05.09.202113.09.2021INJECTIONWATER19.03.201706.04.2017INJECTIONWATER16.05.201829.05.2018OBSERVATIONNOT APPLICABLE30.05.201807.06.2018OBSERVATIONNOT APPLICABLE08.06.201819.06.2018INJECTIONWATER14.04.201809.05.2018INJECTIONWATER22.05.201609.06.2016INJECTIONWATER28.09.202210.10.2022OBSERVATIONNOT APPLICABLE11.10.202218.10.2022OBSERVATIONNOT APPLICABLE07.12.202217.12.2022PRODUCTIONOILPRODUCTION19.03.201611.07.2016PRODUCTIONNOT APPLICABLE07.05.201730.05.2017PRODUCTIONOIL17.07.201722.07.2017PRODUCTIONOIL21.11.202202.12.2022PRODUCTIONOIL05.08.201501.09.2015PRODUCTIONOIL12.09.201529.09.2015PRODUCTIONOIL01.10.201510.10.2015PRODUCTIONOIL23.06.201709.07.2017PRODUCTIONOIL12.08.202127.08.2021OBSERVATIONNOT APPLICABLE22.10.202216.11.2022PRODUCTIONOIL20.10.201512.11.2015PRODUCTIONOIL04.07.201924.07.2019PRODUCTIONOIL25.07.201902.08.2019PRODUCTIONDRY03.08.201907.08.2019PRODUCTIONOIL15.12.201517.01.2016PRODUCTIONOIL31.08.202006.09.2020OBSERVATIONNOT APPLICABLE07.09.202016.09.2020PRODUCTIONNOT APPLICABLE30.11.202005.12.2020PRODUCTIONOIL19.11.202029.11.2020PRODUCTIONOIL17.09.202020.09.2020OBSERVATIONNOT APPLICABLE12.04.201929.04.2019OBSERVATIONNOT APPLICABLE30.04.201914.05.2019PRODUCTIONOIL/GAS31.01.201616.02.2016PRODUCTIONOIL23.09.202025.10.2020PRODUCTIONOIL26.10.202002.11.2020PRODUCTIONOIL03.11.202010.11.2020PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus