SNORRE
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing03.08.1992Approved for production27.05.198802.08.1992 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType08.04.2020Endret PUD Hywind Snorre av OEDChanged PDO15.06.2018Endret PUD Snorre Expansion project i StortingetChanged PDO21.10.2009PUD fritak Snorre ExportPDO Exemption08.06.1998Snorre 2 i StortingetPDO16.12.1994Fase II Lunde L02-L05 av Kongen i StatsrådPDO27.05.1988Snorre Fase I i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to dateBUSINESS ARRANGEMENT AREA27.05.1988 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to16.05.201801.11.200915.05.201801.01.200931.10.200901.10.200731.12.200801.01.200330.09.200711.01.200131.12.200227.05.198810.01.2001 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO33.27556031.01.2022NO30.00000031.01.2022NO18.55336031.01.2022NO9.60000031.01.2022NO8.57108031.01.2022NO33.27556028.01.202230.01.2022NO30.00000028.01.202230.01.2022NO18.55336028.01.202230.01.2022NO9.60000028.01.202230.01.2022NO8.57108028.01.202230.01.2022NO33.27556010.12.201927.01.2022NO30.00000010.12.201927.01.2022NO18.55336010.12.201927.01.2022NO9.60000010.12.201927.01.2022NO8.57108010.12.201927.01.2022NO33.27556013.11.201909.12.2019NO30.00000013.11.201909.12.2019NO17.44596013.11.201909.12.2019NO9.60000013.11.201909.12.2019NO8.57108013.11.201909.12.2019NO1.10740013.11.201909.12.2019NO33.27556010.12.201812.11.2019NO30.00000010.12.201812.11.2019NO17.44596010.12.201812.11.2019NO9.60000010.12.201812.11.2019NO8.57108010.12.201812.11.2019NO1.10740010.12.201812.11.2019NO33.27556016.05.201809.12.2018NO30.00000016.05.201809.12.2018NO17.44596016.05.201809.12.2018NO9.60000016.05.201809.12.2018NO8.57108016.05.201809.12.2018NO1.10740016.05.201809.12.2018NO33.27556026.05.201615.05.2018NO30.00000026.05.201615.05.2018NO17.44596026.05.201615.05.2018NO9.60000026.05.201615.05.2018NO8.57108026.05.201615.05.2018NO1.10740026.05.201615.05.2018NO33.27556013.03.201525.05.2016NO30.00000013.03.201525.05.2016NO17.44596013.03.201525.05.2016NO9.60000013.03.201525.05.2016NO8.57108013.03.201525.05.2016NO1.10740013.03.201525.05.2016NO33.27556001.01.201412.03.2015NO30.00000001.01.201412.03.2015NO17.44596001.01.201412.03.2015NO9.60000001.01.201412.03.2015NO8.57108001.01.201412.03.2015NO1.10740001.01.201412.03.2015NO33.31690001.01.201231.12.2013NO30.00000001.01.201231.12.2013NO17.76350001.01.201231.12.2013NO9.60000001.01.201231.12.2013NO8.28120001.01.201231.12.2013NO1.03840001.01.201231.12.2013NO33.31690001.01.201131.12.2011NO30.00000001.01.201131.12.2011NO11.58490001.01.201131.12.2011NO9.60000001.01.201131.12.2011NO8.28120001.01.201131.12.2011NO6.17860001.01.201131.12.2011NO1.03840001.01.201131.12.2011NO33.31690001.11.200931.12.2010NO30.00000001.11.200931.12.2010NO11.58490001.11.200931.12.2010NO9.60000001.11.200931.12.2010NO8.28120001.11.200931.12.2010NO6.17860001.11.200931.12.2010NO1.03840001.11.200931.12.2010NO33.31690001.01.200931.10.2009NO30.00000001.01.200931.10.2009NO11.58490001.01.200931.10.2009NO9.60000001.01.200931.10.2009NO8.28120001.01.200931.10.2009NO6.17860001.01.200931.10.2009NO1.03840001.01.200931.10.2009NO30.00000001.10.200731.12.2008NO17.76720001.10.200731.12.2008NO15.54970001.10.200731.12.2008NO11.58490001.10.200731.12.2008NO9.60000001.10.200731.12.2008NO8.28120001.10.200731.12.2008NO6.17860001.10.200731.12.2008NO1.03840001.10.200731.12.2008NO30.00000001.01.200730.09.2007NO17.76720001.01.200730.09.2007NO15.54970001.01.200730.09.2007NO11.58490001.01.200730.09.2007NO9.60000001.01.200730.09.2007NO8.28120001.01.200730.09.2007NO6.17860001.01.200730.09.2007NO1.03840001.01.200730.09.2007NO30.00000026.06.200631.12.2006NO17.76720026.06.200631.12.2006NO15.54970026.06.200631.12.2006NO11.58490026.06.200631.12.2006NO9.60000026.06.200631.12.2006NO8.28120026.06.200631.12.2006NO6.17860026.06.200631.12.2006NO1.03840026.06.200631.12.2006NO30.00000001.05.200625.06.2006NO17.76720001.05.200625.06.2006NO15.54970001.05.200625.06.2006NO11.58490001.05.200625.06.2006NO9.60000001.05.200625.06.2006NO8.28120001.05.200625.06.2006NO6.17860001.05.200625.06.2006NO1.03840001.05.200625.06.2006NO30.00000001.01.200530.04.2006NO17.65430001.01.200530.04.2006NO15.57730001.01.200530.04.2006NO11.15810001.01.200530.04.2006NO9.60000001.01.200530.04.2006NO8.87870001.01.200530.04.2006NO5.95100001.01.200530.04.2006NO1.18060001.01.200530.04.2006NO30.00000001.10.200431.12.2004NO17.65430001.10.200431.12.2004NO14.39670001.10.200431.12.2004NO11.15810001.10.200431.12.2004NO9.60000001.10.200431.12.2004NO8.87870001.10.200431.12.2004NO5.95100001.10.200431.12.2004NO1.18060001.10.200431.12.2004NO1.18060001.10.200431.12.2004NO30.00000006.05.200330.09.2004NO17.65430006.05.200330.09.2004NO14.39670006.05.200330.09.2004NO11.15810006.05.200330.09.2004NO9.60000006.05.200330.09.2004NO8.87870006.05.200330.09.2004NO5.95100006.05.200330.09.2004NO1.18060006.05.200330.09.2004NO1.18060006.05.200330.09.2004NO30.00000031.12.200105.05.2003NO17.65430031.12.200105.05.2003NO14.39670031.12.200105.05.2003NO11.15810031.12.200105.05.2003NO9.60000031.12.200105.05.2003NO8.87870031.12.200105.05.2003NO5.95100031.12.200105.05.2003NO1.18060031.12.200105.05.2003NO1.18060031.12.200105.05.2003NO30.00000017.06.200130.12.2001NO17.65430017.06.200130.12.2001NO14.39670017.06.200130.12.2001NO11.15810017.06.200130.12.2001NO9.60000017.06.200130.12.2001NO8.87870017.06.200130.12.2001NO5.95100017.06.200130.12.2001NO1.18060017.06.200130.12.2001NO1.18060017.06.200130.12.2001NO30.00000001.06.200116.06.2001NO17.65430001.06.200116.06.2001NO14.39670001.06.200116.06.2001NO11.15810001.06.200116.06.2001NO9.60000001.06.200116.06.2001NO8.87870001.06.200116.06.2001NO5.95100001.06.200116.06.2001NO1.18060001.06.200116.06.2001NO1.18060001.06.200116.06.2001NO31.40000010.05.200131.05.2001NO17.65430010.05.200131.05.2001NO12.99670010.05.200131.05.2001NO11.15810010.05.200131.05.2001NO9.60000010.05.200131.05.2001NO8.87870010.05.200131.05.2001NO5.95100010.05.200131.05.2001NO1.18060010.05.200131.05.2001NO1.18060010.05.200131.05.2001NO44.39670011.01.200109.05.2001NO17.65430011.01.200109.05.2001NO11.15810011.01.200109.05.2001NO9.60000011.01.200109.05.2001NO8.87870011.01.200109.05.2001NO5.95100011.01.200109.05.2001NO1.18060011.01.200109.05.2001NO1.18060011.01.200109.05.2001NO44.39670024.07.200010.01.2001NO11.15810024.07.200010.01.2001NO9.60000024.07.200010.01.2001NO8.92650024.07.200010.01.2001NO8.87870024.07.200010.01.2001NO8.72780024.07.200010.01.2001NO5.95100024.07.200010.01.2001NO1.18060024.07.200010.01.2001NO1.18060024.07.200010.01.2001NO44.39670011.12.199923.07.2000NO11.15810011.12.199923.07.2000NO9.60000011.12.199923.07.2000NO8.92650011.12.199923.07.2000NO8.87870011.12.199923.07.2000NO8.72780011.12.199923.07.2000NO5.95100011.12.199923.07.2000NO1.18060011.12.199923.07.2000NO1.18060011.12.199923.07.2000NO41.40000017.12.199810.12.1999NO11.72450017.12.199810.12.1999NO11.15810017.12.199810.12.1999NO9.60000017.12.199810.12.1999NO8.92650017.12.199810.12.1999NO8.87870017.12.199810.12.1999NO5.95100017.12.199810.12.1999NO1.18060017.12.199810.12.1999NO1.18060017.12.199810.12.1999NO41.40000001.08.199816.12.1998NO11.72450001.08.199816.12.1998NO11.15810001.08.199816.12.1998NO9.60000001.08.199816.12.1998NO8.92650001.08.199816.12.1998NO8.87870001.08.199816.12.1998NO5.95100001.08.199816.12.1998NO1.18060001.08.199816.12.1998NO1.18060001.08.199816.12.1998NO41.40000009.05.199531.07.1998NO11.94470009.05.199531.07.1998NO10.33230009.05.199531.07.1998NO10.03480009.05.199531.07.1998NO9.60000009.05.199531.07.1998NO8.26580009.05.199531.07.1998NO5.51060009.05.199531.07.1998NO1.45590009.05.199531.07.1998NO1.45590009.05.199531.07.1998NO41.40000001.01.199008.05.1995NO11.25590001.01.199008.05.1995NO10.33230001.01.199008.05.1995NO10.03480001.01.199008.05.1995NO9.60000001.01.199008.05.1995NO8.26580001.01.199008.05.1995NO5.51060001.01.199008.05.1995NO1.45590001.01.199008.05.1995NO1.45590001.01.199008.05.1995NO0.68880001.01.199008.05.1995NO51.00000014.04.198931.12.1989NO11.25590014.04.198931.12.1989NO10.33230014.04.198931.12.1989NO10.03480014.04.198931.12.1989NO8.26580014.04.198931.12.1989NO5.51060014.04.198931.12.1989NO1.45590014.04.198931.12.1989NO1.45590014.04.198931.12.1989NO0.68880014.04.198931.12.1989NO51.00000008.07.198813.04.1989NO11.25590008.07.198813.04.1989NO10.33230008.07.198813.04.1989NO10.03480008.07.198813.04.1989NO8.26580008.07.198813.04.1989NO5.51060008.07.198813.04.1989NO1.45590008.07.198813.04.1989NO1.45590008.07.198813.04.1989NO0.68880008.07.198813.04.1989NO51.00000027.05.198807.07.1988NO11.25590027.05.198807.07.1988NO10.33230027.05.198807.07.1988NO8.26580027.05.198807.07.1988NO7.12300027.05.198807.07.1988NO5.51060027.05.198807.07.1988NO2.91180027.05.198807.07.1988NO1.45590027.05.198807.07.1988NO1.45590027.05.198807.07.1988NO0.68880027.05.198807.07.1988 -
Description
Description TypeTextDate updatedDevelopmentSnorre is a field in the Tampen area in the northern part of the North Sea. The water depth is 300-350 metres. Snorre was discovered in 1979, and the plan for development and operation (PDO) was approved in 1988. The field is developed with the facilities Snorre A, located in the southern part of the field, Snorre B in the northern part and two subsea systems tied-back to Snorre A (SPS and SEP). Snorre A is a floating tension-leg platform for accommodation, drilling and processing. There is also a separate process module on Snorre A for full stabilisation of the well stream from the Vigdis field. The production from Snorre A started in 1992. The subsea production system SPS was installed on the field in 1992. It consists of one template with 20 slots for production and injection wells. In 1998, a PDO was approved for Snorre B, a semi-submersible integrated drilling, processing and accommodation facility. Snorre B started production in 2001. An amended PDO for the Snorre Expansion Project (SEP) was approved in 2018. SEP consists of six subsea templates, each with four wells, and production from the first wells started in 2020. In 2020, an amended PDO for the development of the Hywind Tampen wind farm was approved. The wind farm consists of 11 floating turbines that started supplying electricity to the Snorre and Gullfaks platforms in 2022/2023. These fields are the first in the world receiving power from a floating wind farm.14.12.2023ReservoirSnorre produces oil from Triassic and Lower Jurassic sandstone in the Alke and Lunde Formations and the Statfjord Group. The field consists of several large fault blocks. The reservoirs are at depths of 2000-2700 metres and have complex structures with both channels and flow barriers.14.12.2023Recovery strategyThe field is produced with pressure support from water injection, gas injection and water alternating gas injection (WAG). From 2019, all gas is reinjected to increase oil recovery.28.02.2023TransportOil and gas are separated at the Snorre A platform. The oil is stabilised at the Vigdis process module on Snorre A, then exported through the Vigdis pipeline to Gullfaks A. The oil is stored and loaded onto shuttle tankers at the Gullfaks field. All gas from Snorre and Vigdis is reinjected into the Snorre field. Fully processed oil from Snorre B is transported by pipeline to Statfjord B for storage and loading onto shuttle tankers.28.02.2023StatusSeveral measures to increase oil recovery from Snorre are being considered. Possible third-party tie-ins may lead to further development of the field. Measures to further reduce emissions are also considered.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.38233 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum11882120226576202174882020772920195701201845902017282720162601201532092014525520134582201227882011298820103905200937142008292820073170200617242005155420041705200316852002224320012962200057961999561119981249199762019969411995816199485319931513199235601991578019906210198929531988995 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum246.7267616.4313610.0228028.989876262.1708004.1874910.0000000.0000000.0000004.1874915.4947000.0000000.0000000.0000005.4947006.0623550.0000000.0000000.0000006.0623555.8272660.0000000.0000000.0000005.8272663.9136350.0000000.0000000.0000003.9136353.0089090.0114920.0000000.0314793.0518805.3328790.0000000.0000000.0000005.3328794.8158190.0683530.0000000.1131114.9972835.7240440.0000000.0000000.0000005.7240446.3597820.0000000.0000000.0000006.3597825.6194230.0089910.0001710.0058035.6343885.0884420.0185620.0037320.0271455.1378814.4501610.0344060.0017790.0255324.5118785.5165010.1186020.0041350.0876715.7269095.8302210.1376310.0052820.0952376.0683716.0058010.1394350.0054930.0953756.2461048.4717880.2290200.0022100.1834568.8864748.3816350.0643230.0000000.0843368.5302948.3152270.1466450.0000000.2203928.6822648.9558260.3426000.0000000.4046399.70306511.5388230.1926350.0000000.26182911.99328713.5982200.4059350.0000000.66664914.67080412.6404600.4495380.0000000.93646014.02645811.5451200.5205070.0000000.97523313.0408608.5874260.2924950.0000000.5349799.4149009.3987170.3082630.0000000.55745510.26443510.0911120.4571340.0000000.61482911.16307510.7700940.5772460.0000000.56815811.91549811.4819700.6109510.0000000.62780812.72072911.3743330.6274720.0000000.67964712.6814529.8718220.4537660.0000000.61046410.9360526.9087350.2153590.0000000.4954317.6195251.5580240.0000000.0000000.0867581.644782 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum247.96363550.9363050.000000298.8999404.1975021.5034940.0000005.7009965.5038321.8347630.0000007.3385956.0825262.0286540.0000008.1111805.8533592.1794150.0000008.0327743.9015351.3797500.0000005.2812853.0331361.3648590.0000004.3979955.3327331.7929770.0000007.1257104.8157421.6907630.0000006.5065055.7368121.9813980.0000007.7182106.3112332.0029720.0000008.3142055.5969171.6861830.0000007.2831005.1850801.4400090.0000006.6250894.5592881.3598100.0000005.9190985.4139571.3340260.0000006.7479835.8139851.4736010.0000007.2875866.5494731.4423090.0000007.9917828.5023221.8385390.00000010.3408618.3780111.7071130.00000010.0851248.1188111.5646540.0000009.6834658.7368751.6397780.00000010.37665311.4888322.0493490.00000013.53818113.8146882.0980950.00000015.91278312.6627001.9279800.00000014.59068011.6237711.8797590.00000013.5035308.6024391.4459090.00000010.04834810.1142911.4384690.00000011.55276010.0480661.3665400.00000011.41460610.7328571.2109080.00000011.94376511.4399041.2069380.00000012.64684211.2713641.1808350.00000012.4521999.9215091.0452650.00000010.9667747.0282260.6885820.0000007.7168081.5918590.1526090.0000001.744468 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent11.07.197916.12.1979WILDCATP&AOIL11.09.198203.02.1983APPRAISALP&AOIL31.12.198527.03.1986APPRAISALP&AOIL17.02.198712.05.1987APPRAISALP&AOIL08.01.199715.02.1997APPRAISALP&AOIL27.01.201018.02.2010APPRAISALP&AOIL09.05.198424.07.1984APPRAISALP&AOIL14.09.198402.01.1985APPRAISALP&AOIL19.11.198416.01.1985APPRAISALP&AOIL17.03.198530.05.1985APPRAISALP&AOIL17.09.198516.12.1985APPRAISALP&AOIL13.04.198612.06.1986APPRAISALP&AOIL26.08.198629.10.1986APPRAISALP&AOIL -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent11.10.200716.12.2007PRODUCTIONOILPRODUCTION21.01.200013.04.2000PRODUCTIONOIL17.11.201504.12.2015PRODUCTIONOIL25.08.201522.09.2015PRODUCTIONOIL15.04.200213.06.2002PRODUCTIONOIL04.10.201502.11.2015PRODUCTIONOIL22.11.199928.12.1999PRODUCTIONOIL10.10.199918.11.1999OBSERVATIONNOT APPLICABLE28.01.200028.02.2000PRODUCTIONOIL14.03.201818.04.2019PRODUCTIONOIL/GAS08.07.200614.07.2007OBSERVATIONOIL13.08.200721.08.2007PRODUCTIONOIL05.05.201114.07.2011PRODUCTIONOIL21.07.200304.03.2004PRODUCTIONOIL09.08.200421.09.2004OBSERVATIONNOT APPLICABLE23.09.200412.12.2004PRODUCTIONOIL23.01.201203.06.2012PRODUCTIONOIL09.04.202401.06.2024PRODUCTIONOIL04.06.200301.09.2003PRODUCTIONOIL20.12.201701.01.2018PRODUCTIONOIL09.01.202323.07.2023PRODUCTION05.02.201411.11.2014PRODUCTIONOIL18.03.200605.05.2006PRODUCTIONOIL10.09.201018.11.2010PRODUCTIONOILPRODUCTION27.07.201615.12.2016PRODUCTIONOIL31.07.200407.08.2004INJECTIONCUTTINGS14.09.200510.11.2005INJECTIONWATER/GAS19.07.202003.09.2020INJECTIONWATER/GAS26.12.200030.01.2001INJECTIONNOT APPLICABLE26.01.200304.03.2003INJECTIONWATER21.08.201419.09.2014INJECTIONWATER/GASINJECTION11.10.200128.12.2001INJECTIONWATER07.07.201828.07.2018INJECTIONWATER/GAS26.06.200923.01.2010INJECTIONWATER/GAS08.09.200211.11.2002INJECTIONWATER15.08.200428.04.2005INJECTIONWATER06.04.202228.04.2022INJECTIONWATER/GAS20.03.200808.07.2008INJECTIONWATER/GAS20.07.201616.11.2016INJECTIONWATER/GAS25.11.200808.02.2009INJECTIONWATER/GAS06.03.200923.03.2009INJECTIONWATER29.10.201214.01.2013INJECTIONWATER/GAS13.07.201606.05.2017INJECTIONGAS28.02.202104.05.2021INJECTIONWATER/GAS03.11.201920.06.2020PRODUCTIONOIL06.11.201916.12.2020INJECTIONWATER/GAS29.10.201915.03.2020PRODUCTIONOIL14.11.202108.05.2022PRODUCTIONOIL09.04.202231.05.2022PRODUCTIONOIL17.11.202127.03.2022INJECTIONWATER/GAS12.04.202230.06.2022PRODUCTIONOIL21.11.202102.01.2022PRODUCTIONOIL29.08.202005.01.2021INJECTIONWATER/GAS26.08.202022.01.2021PRODUCTIONOIL10.11.201920.04.2020INJECTIONWATER/GAS07.04.199305.05.1993PRODUCTIONOIL09.10.200001.11.2000PRODUCTIONOIL26.03.199425.04.1994INJECTIONWATER20.04.199901.05.1999INJECTIONWATER02.01.199417.02.1994INJECTIONWATER21.09.200414.12.2004PRODUCTIONOIL01.09.199206.10.1992PRODUCTIONOIL07.08.200212.09.2002INJECTIONWATER15.10.199224.02.1993PRODUCTIONOIL24.04.200006.05.2000PRODUCTIONOIL29.08.199306.10.1993PRODUCTIONOIL16.10.199419.10.1994INJECTIONNOT APPLICABLE21.11.199404.03.1995PRODUCTIONOIL21.06.199303.08.1993INJECTIONWATER09.11.199304.12.1993INJECTIONWATER27.09.201708.10.2017INJECTIONWATER28.08.200126.09.2001PRODUCTIONOIL08.08.199613.09.1996INJECTIONWATER06.05.200231.05.2002INJECTIONWATER31.05.200323.07.2003PRODUCTIONOIL18.08.200220.12.2002INJECTIONWATER25.12.202310.01.2024INJECTIONGAS14.11.200330.12.2003PRODUCTIONOIL08.07.202122.04.2022PRODUCTIONOIL/GAS24.11.199621.10.1997PRODUCTIONOIL23.10.201025.11.2010INJECTIONWATER/GAS09.09.201813.10.2018INJECTIONWATER/GAS22.08.199321.05.1994INJECTIONWATER/GAS19.10.201617.11.2016PRODUCTIONOIL22.04.199304.06.1993PRODUCTIONOIL13.09.202319.10.2023PRODUCTIONOIL19.09.199509.05.1996PRODUCTIONOIL14.01.200318.03.2003PRODUCTIONOIL09.06.200808.07.2008INJECTIONWATER/GAS26.09.199411.08.1995PRODUCTIONOIL26.04.200110.05.2001INJECTIONWATER19.06.202220.07.2022INJECTIONWATER/GAS18.01.199404.03.1994INJECTIONWATER24.01.201305.03.2013PRODUCTIONOIL17.08.199101.03.1992PRODUCTIONOIL16.06.199412.07.1994OBSERVATIONNOT APPLICABLE09.10.199405.11.1994PRODUCTIONOIL25.08.199826.10.1998PRODUCTIONOIL08.04.200228.04.2002PRODUCTIONOIL18.10.201721.12.2017PRODUCTIONOIL15.06.200221.07.2002PRODUCTIONOIL18.12.201926.02.2020PRODUCTIONOIL/GAS30.11.200126.01.2002INJECTIONWATER28.01.202118.03.2021INJECTIONWATER/GAS27.08.199315.11.1993INJECTIONWATER24.01.201120.03.2011INJECTIONWATER/GASINJECTION28.07.199103.11.1991PRODUCTIONOIL06.07.199705.08.1997PRODUCTIONOIL28.10.199918.01.2000PRODUCTIONOIL10.12.201308.04.2014INJECTIONWATER/GAS16.03.199912.05.1999INJECTIONWATER/GAS07.04.199810.06.1998INJECTIONWATER11.02.200103.03.2001INJECTIONWATER04.02.201719.03.2017INJECTIONWATER/GAS18.08.199628.10.1996INJECTIONWATER05.12.200826.01.2009INJECTIONWATER28.11.199606.05.1997PRODUCTIONOIL05.09.199511.11.1995PRODUCTIONOIL10.12.199220.01.1993INJECTIONWATER16.01.199722.01.1997INJECTIONWATER13.09.201204.10.2012INJECTIONWATER/GAS17.07.200408.08.2004PRODUCTIONOIL30.08.199715.08.2001INJECTIONNOT APPLICABLE22.05.200925.06.2009PRODUCTIONOIL12.09.199028.11.1990INJECTIONWATER29.04.201814.05.2018INJECTIONWATER/GAS01.01.199104.03.1991PRODUCTIONOIL07.02.200802.04.2008INJECTIONWATER/GAS19.05.200030.06.2000PRODUCTIONOIL30.09.199430.12.1994OBSERVATIONNOT APPLICABLE31.12.199401.02.1995INJECTIONWATER/GAS29.08.199510.01.1996INJECTIONGAS20.03.200710.06.2007INJECTIONWATER/GAS02.07.201914.08.2019INJECTIONWATER/GAS24.08.199125.12.1991PRODUCTIONOIL17.03.201808.04.2018PRODUCTIONOIL08.08.199129.03.1992INJECTIONWATER/GAS16.06.199704.11.2000PRODUCTIONOIL11.04.201018.05.2010PRODUCTIONOIL11.04.202329.04.2023PRODUCTIONOIL10.10.199820.11.1998INJECTIONWATER02.02.199914.02.1999PRODUCTIONOIL04.12.201828.12.2018INJECTIONWATER/GAS20.06.199310.08.1993INJECTIONWATER17.03.200327.05.2003INJECTIONWATERINJECTION15.07.199422.08.1994PRODUCTIONOIL18.06.199627.07.1996PRODUCTIONOIL16.05.201622.06.2016INJECTIONWATER16.02.199307.04.1993PRODUCTIONOIL08.02.200405.03.2004PRODUCTIONOIL31.07.199827.08.1998PRODUCTIONNOT APPLICABLE28.08.199814.09.1998PRODUCTIONOIL31.08.200020.03.2001PRODUCTIONOIL27.01.202317.02.2023OBSERVATIONNOT APPLICABLE26.09.202413.11.2024PRODUCTIONOIL14.06.199629.04.2000PRODUCTIONOIL14.06.199904.09.1999INJECTIONWATER/GAS09.09.202011.11.2020PRODUCTIONOIL13.11.201901.06.2020PRODUCTIONOIL12.09.202023.10.2020INJECTIONWATER/GAS05.09.202009.10.2020INJECTIONWATER/GAS21.11.201919.07.2020INJECTIONWATER/GAS19.11.201901.08.2020PRODUCTIONOIL02.09.202009.02.2021INJECTIONWATER/GAS16.11.201922.01.2020PRODUCTIONOIL13.03.202115.10.2021PRODUCTIONOIL08.03.202121.09.2021PRODUCTIONOIL16.03.202126.10.2022INJECTIONWATER/GAS05.03.202128.08.2021PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus15.04.201815.04.2018SHALLOW GASPLUGGED14.04.201815.04.2018SHALLOW GASPLUGGED17.04.201818.04.2018SHALLOW GASPLUGGED16.04.201817.04.2018SHALLOW GASPLUGGED16.04.201816.04.2018SHALLOW GASPLUGGED15.04.201816.04.2018SHALLOW GASPLUGGED