NJORD
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing30.09.1997Approved for production12.06.199529.09.1997 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType22.12.2023Endret PUD og PAD for prosjektet Njord elektrifiseringChanged PDO20.06.2017Njord Future Endet PUD av OEDChanged PDO21.01.2005Njord Gasseksport av Kongen i StatsrådPDO12.06.1995Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to dateBUSINESS ARRANGEMENT AREA12.06.1995 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to16.05.201801.11.200915.05.201801.10.200731.10.200901.01.200730.09.200712.06.199531.12.2006 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO50.00000008.06.2024NO27.50000008.06.2024NO22.50000008.06.2024NO50.00000031.01.202407.06.2024NO27.50000031.01.202407.06.2024NO22.50000031.01.202407.06.2024NO50.00000013.11.201930.01.2024NO27.50000013.11.201930.01.2024NO22.50000013.11.201930.01.2024NO50.00000030.04.201912.11.2019NO27.50000030.04.201912.11.2019NO22.50000030.04.201912.11.2019NO50.00000003.12.201829.04.2019NO22.50000003.12.201829.04.2019NO20.00000003.12.201829.04.2019NO7.50000003.12.201829.04.2019NO50.00000012.10.201802.12.2018NO20.00000012.10.201802.12.2018NO20.00000012.10.201802.12.2018NO7.50000012.10.201802.12.2018NO2.50000012.10.201802.12.2018NO50.00000016.05.201811.10.2018NO20.00000016.05.201811.10.2018NO20.00000016.05.201811.10.2018NO7.50000016.05.201811.10.2018NO2.50000016.05.201811.10.2018NO50.00000022.02.201815.05.2018NO20.00000022.02.201815.05.2018NO20.00000022.02.201815.05.2018NO7.50000022.02.201815.05.2018NO2.50000022.02.201815.05.2018NO50.00000028.04.201721.02.2018NO20.00000028.04.201721.02.2018NO20.00000028.04.201721.02.2018NO7.50000028.04.201721.02.2018NO2.50000028.04.201721.02.2018NO40.00000018.05.201627.04.2017NO30.00000018.05.201627.04.2017NO20.00000018.05.201627.04.2017NO7.50000018.05.201627.04.2017NO2.50000018.05.201627.04.2017NO40.00000013.01.201617.05.2016NO30.00000013.01.201617.05.2016NO20.00000013.01.201617.05.2016NO7.50000013.01.201617.05.2016NO2.50000013.01.201617.05.2016NO40.00000011.02.201212.01.2016NO30.00000011.02.201212.01.2016NO20.00000011.02.201212.01.2016NO7.50000011.02.201212.01.2016NO2.50000011.02.201212.01.2016NO40.00000002.01.201110.02.2012NO30.00000002.01.201110.02.2012NO20.00000002.01.201110.02.2012NO7.50000002.01.201110.02.2012NO2.50000002.01.201110.02.2012NO40.00000001.01.201101.01.2011NO30.00000001.01.201101.01.2011NO20.00000001.01.201101.01.2011NO7.50000001.01.201101.01.2011NO2.50000001.01.201101.01.2011NO30.00000001.11.200931.12.2010NO20.00000001.11.200931.12.2010NO20.00000001.11.200931.12.2010NO20.00000001.11.200931.12.2010NO7.50000001.11.200931.12.2010NO2.50000001.11.200931.12.2010NO30.00000001.10.200931.10.2009NO20.00000001.10.200931.10.2009NO20.00000001.10.200931.10.2009NO20.00000001.10.200931.10.2009NO7.50000001.10.200931.10.2009NO2.50000001.10.200931.10.2009NO30.00000026.05.200930.09.2009NO20.00000026.05.200930.09.2009NO20.00000026.05.200930.09.2009NO20.00000026.05.200930.09.2009NO7.50000026.05.200930.09.2009NO2.50000026.05.200930.09.2009NO30.00000002.01.200925.05.2009NO20.00000002.01.200925.05.2009NO20.00000002.01.200925.05.2009NO20.00000002.01.200925.05.2009NO7.50000002.01.200925.05.2009NO2.50000002.01.200925.05.2009NO30.00000001.01.200901.01.2009NO20.00000001.01.200901.01.2009NO20.00000001.01.200901.01.2009NO20.00000001.01.200901.01.2009NO7.50000001.01.200901.01.2009NO2.50000001.01.200901.01.2009NO30.00000001.11.200831.12.2008NO20.00000001.11.200831.12.2008NO20.00000001.11.200831.12.2008NO20.00000001.11.200831.12.2008NO7.50000001.11.200831.12.2008NO2.50000001.11.200831.12.2008NO30.00000001.01.200831.10.2008NO20.00000001.01.200831.10.2008NO20.00000001.01.200831.10.2008NO20.00000001.01.200831.10.2008NO7.50000001.01.200831.10.2008NO2.50000001.01.200831.10.2008NO30.00000001.10.200731.12.2007NO20.00000001.10.200731.12.2007NO20.00000001.10.200731.12.2007NO20.00000001.10.200731.12.2007NO7.50000001.10.200731.12.2007NO2.50000001.10.200731.12.2007NO30.00000001.01.200730.09.2007NO20.00000001.01.200730.09.2007NO20.00000001.01.200730.09.2007NO20.00000001.01.200730.09.2007NO7.50000001.01.200730.09.2007NO2.50000001.01.200730.09.2007NO30.00000010.01.200531.12.2006NO20.00000010.01.200531.12.2006NO20.00000010.01.200531.12.2006NO20.00000010.01.200531.12.2006NO7.50000010.01.200531.12.2006NO2.50000010.01.200531.12.2006NO30.00000001.01.200509.01.2005NO20.00000001.01.200509.01.2005NO20.00000001.01.200509.01.2005NO20.00000001.01.200509.01.2005NO7.50000001.01.200509.01.2005NO2.50000001.01.200509.01.2005NO20.00000005.07.200431.12.2004NO20.00000005.07.200431.12.2004NO20.00000005.07.200431.12.2004NO15.00000005.07.200431.12.2004NO15.00000005.07.200431.12.2004NO7.50000005.07.200431.12.2004NO2.50000005.07.200431.12.2004NO20.00000001.12.200304.07.2004NO20.00000001.12.200304.07.2004NO20.00000001.12.200304.07.2004NO15.00000001.12.200304.07.2004NO15.00000001.12.200304.07.2004NO7.50000001.12.200304.07.2004NO2.50000001.12.200304.07.2004NO20.00000022.03.200330.11.2003NO20.00000022.03.200330.11.2003NO20.00000022.03.200330.11.2003NO15.00000022.03.200330.11.2003NO15.00000022.03.200330.11.2003NO7.50000022.03.200330.11.2003NO2.50000022.03.200330.11.2003NO20.00000019.03.200221.03.2003NO20.00000019.03.200221.03.2003NO20.00000019.03.200221.03.2003NO15.00000019.03.200221.03.2003NO15.00000019.03.200221.03.2003NO7.50000019.03.200221.03.2003NO2.50000019.03.200221.03.2003NO30.00000001.01.200218.03.2002NO20.00000001.01.200218.03.2002NO20.00000001.01.200218.03.2002NO20.00000001.01.200218.03.2002NO7.50000001.01.200218.03.2002NO2.50000001.01.200218.03.2002NO30.00000017.06.200131.12.2001NO22.50000017.06.200131.12.2001NO20.00000017.06.200131.12.2001NO20.00000017.06.200131.12.2001NO7.50000017.06.200131.12.2001NO30.00000006.06.200116.06.2001NO22.50000006.06.200116.06.2001NO20.00000006.06.200116.06.2001NO20.00000006.06.200116.06.2001NO7.50000006.06.200116.06.2001NO30.00000010.05.200105.06.2001NO22.50000010.05.200105.06.2001NO20.00000010.05.200105.06.2001NO20.00000010.05.200105.06.2001NO7.50000010.05.200105.06.2001NO50.00000023.01.200109.05.2001NO22.50000023.01.200109.05.2001NO20.00000023.01.200109.05.2001NO7.50000023.01.200109.05.2001NO50.00000001.01.199622.01.2001NO22.50000001.01.199622.01.2001NO20.00000001.01.199622.01.2001NO7.50000001.01.199622.01.2001NO50.00000012.06.199531.12.1995NO30.00000012.06.199531.12.1995NO20.00000012.06.199531.12.1995 -
Description
Description TypeTextDate updatedDevelopmentNjord is a field in the Norwegian Sea, 30 kilometres west of the Draugen field. The water depth is 330 metres. The Njord field was discovered in 1986, and the plan for development and operation (PDO) was approved in 1995. Njord is developed with a floating steel platform unit, Njord A, containing drilling and processing facilities, and a storage vessel, Njord Bravo. The production started in 1997 and stopped temporarily in 2016 when the Njord A platform was shut down and towed to land for reinforcement and modifications. An amended PDO for the upgrading was approved in 2017. Production from the Njord field resumed at the end of 2022. The fields Hyme, Bauge and Fenja are tied-back to Njord.14.12.2023ReservoirNjord produces oil from Jurassic sandstone in the Tilje and Ile Formations. The field has a complicated fault pattern with only partial communication between the segments. The reservoir quality varies in the different reservoir zones. The reservoir depth is 2850 metres.14.12.2023Recovery strategyInitial production strategy was gas injection for pressure support in parts of the reservoir and pressure depletion in the rest of the reservoir. After gas export started in 2007, only minor volumes of gas have been injected. Due to the complex reservoir with many faults, the field has a relatively low recovery factor.28.02.2023TransportProduced oil is transported by pipeline to the storage vessel Njord Bravo, and further by tankers to the market. Gas from the field is exported through a 40-kilometre pipeline connected to the Åsgard Transport System (ÅTS) and further to the Kårstø terminal.28.02.2023StatusDrilling of new wells started in August 2023. Njord is planned to receive power from shore via the Draugen platform in a few years and thus be partially electrified.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.7150 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum447562022273020215076202058252019662220183727201723512016667201539201446520139682012139820111253201011352009694200884620078462006788200549920043220036102002121200134200062119991006199863519972052199628871995829 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum27.06930810.9165580.0000004.73168942.7175550.1056700.3120030.0000000.0827680.5004410.3012090.4737450.0000000.1248300.8997840.0010230.0000000.0000000.0000000.0010230.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0953840.2003120.0000000.0909200.3866160.3826030.9638150.0000000.4215801.7679980.3697490.6095590.0000000.2750931.2544010.2696700.5422100.0000000.2179091.0297890.3169040.7564380.0000000.3291361.4024780.5406151.3844900.0000000.6137882.5388930.9611741.7773680.0000000.7979593.5365010.7430061.8242330.0000000.8396453.4068840.9474311.9973340.0000000.9045063.8492711.0529760.0750510.0000000.0335551.1615821.3921240.0000000.0000000.0000001.3921241.8301990.0000000.0000000.0000001.8301991.6890500.0000000.0000000.0000001.6890501.7640970.0000000.0000000.0000001.7640971.8631330.0000000.0000000.0000001.8631332.9368010.0000000.0000000.0000002.9368013.9212280.0000000.0000000.0000003.9212283.5226360.0000000.0000000.0000003.5226361.6956050.0000000.0000000.0000001.6956050.3670210.0000000.0000000.0000000.367021 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum27.08282342.1390880.00000069.2219110.1129490.6167010.0000000.7296500.3122290.8053530.0000001.1175820.0010230.0015700.0000000.0025930.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.0000000.1011450.4064280.0000000.5075730.3962261.5591520.0000001.9553780.3410500.9584810.0000001.2995310.2696700.8643950.0000001.1340650.3168871.2173880.0000001.5342750.5406081.6487240.0000002.1893320.9611882.4827900.0000003.4439780.7430102.6025190.0000003.3455290.9474453.2468710.0000004.1943161.0529533.1537250.0000004.2066781.3922063.0100250.0000004.4022311.8301933.2369270.0000005.0671201.6890443.1158570.0000004.8049011.7640962.9512070.0000004.7153031.8631212.7681380.0000004.6312592.9367952.4888520.0000005.4256473.9213042.7187940.0000006.6400983.5258511.7429740.0000005.2688251.6959650.4584510.0000002.1544160.3678650.0837660.0000000.451631 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent19.10.198507.04.1986WILDCATP&AOIL/GAS19.11.198621.01.1987APPRAISALSUSPENDEDOIL/GAS07.03.199030.04.1990APPRAISALP&AOIL03.03.198818.05.1988APPRAISALP&AOIL13.01.198928.03.1989APPRAISALP&AOIL17.12.199015.02.1991APPRAISALP&ASHOWS18.10.200016.12.2000WILDCATP&AGAS/CONDENSATE03.08.200720.09.2007WILDCATP&AGAS/CONDENSATE -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContentPRODUCTION11.11.2011PRODUCTIONNOT APPLICABLE03.10.200311.01.2004INJECTIONGAS18.01.201111.03.2011PRODUCTIONOIL08.03.199910.08.1999INJECTIONGAS12.12.200023.12.2000INJECTIONGAS16.06.200623.07.2006INJECTIONWATER09.01.201017.02.2010PRODUCTIONGAS26.10.199826.11.1998INJECTIONGAS06.05.200021.05.2000INJECTIONGAS15.02.199815.06.1998INJECTIONGAS28.11.199624.12.1996INJECTIONGAS13.10.201020.11.2010PRODUCTIONOIL10.07.200028.08.2000PRODUCTIONOIL15.05.200504.06.2005PRODUCTIONOIL28.01.200626.02.2006INJECTIONGAS13.02.199702.04.1997OBSERVATIONNOT APPLICABLE04.12.199703.02.1998PRODUCTIONOIL27.12.200207.04.2003PRODUCTIONOIL08.04.200315.04.2003PRODUCTIONOIL16.04.200325.04.2003PRODUCTIONOIL31.08.199916.11.1999PRODUCTIONOIL24.01.200907.03.2009PRODUCTIONOIL25.12.199931.03.2000PRODUCTIONOIL09.03.199914.04.1999PRODUCTIONOIL05.02.200515.03.2005PRODUCTIONOIL18.12.199907.02.2000PRODUCTIONOIL21.09.199601.11.1996OBSERVATIONOIL04.11.199624.11.1996PRODUCTIONOIL09.10.200509.12.2005PRODUCTIONOIL23.02.199807.10.1998PRODUCTIONOIL29.10.199829.01.1999PRODUCTIONOIL02.09.199904.10.1999PRODUCTIONOIL14.09.200821.10.2008OBSERVATIONOIL25.10.200803.11.2008PRODUCTIONOIL14.10.200905.11.2009OBSERVATIONOIL10.11.200929.11.2009PRODUCTIONOIL22.05.201302.11.2023PRODUCTIONOIL/GASPRODUCTIONPRODUCTION12.09.199614.09.1996INJECTIONCUTTINGSPRODUCTIONOIL/GAS25.11.2024PRODUCTION05.07.2007PRODUCTIONNOT APPLICABLE -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus