6506/12-11 S
Export: PDF
-
General information
-
Wellbore history
GeneralThe well 6506/12-11 S was planned to be completed as a future producer. The main objectives of the well were to collect data on reservoir quality and fluid distribution, perform a long-term test to evaluate the continuity of the reservoir in the Tilje Formation, carry out an interference test between this well and an adjacent gas injector, 6506/11-5 S, and to investigate the effect of stimulation by fracturing on well productivity.Operations and resultsThe deviated appraisal well 6506/12-11 S was spudded on 8 June 1996 with the semi-submersible installation "Transocean Searcher" and drilled to a TD of 5268 m (4842.5 m TVD), approximately 60 m into the Åre Formation. Drilling was interrupted for 11 days by a labour conflict. The well was drilled with seawater and high viscosity pills down to 621 m, Anco 2000 mud with glycol from 621 to 2242 m, and with oil based Anco vert from 2242 m to TD. The well penetrated the top of the Tilje Formation and the Åre Formation, respectively, 18 m and 9.5 m shallower than prognosed. Both the Tilje and the Åre Formations were hydrocarbon bearing. Two tests were performed, one in Åre and one in Tilje. In addition, a minifrac test was performed in the Åre Formation. Six cores (196 m, 187 m recovered) were cut in the Tilje and Åre Formations. Three MDT wireline samples were taken in the well, one from each of the formations Åre, Tilje, and Garn. The samples from the Tilje and Åre Formations contained oil and gas, while the sample from the Garn Formation, contained formation water. A 7" liner was run and cemented on 9 August 1996. After testing, well 6506/12-11 S was suspended on 7 September 1996 as an oil appraisal well. The well was re-entered (6506/12-11 SR) on 11 November 1996 for an extended test. Well 6506/12-11 SR was suspended as an oil appraisal well on 1 February 1997 and re-classed to development well 6506/12-I-4 H.TestingTest 1 in 6506/12-11 S was carried out over the interval 5226 - 5235.5 m in Åre and flowed with a rate of 685 Sm3/day oil and 453000 Sm3/day gas. Test 2 in 6506/12-11 S was carried out over the interval 5197.5 - 5206.5 m in Tilje and flowed with a rate of 470 Sm3/day oil and 173900 Sm3/day gas. The testing in 6506/12-11 SR consisted of a prefrac test in Tilje 1.1 followed by a massiv hydraulic stimulation and clean up with coiled tubing prior to start the extended well test. Most of the produced oil during the well test was recovered by the floating production, storage and testing vessel "Crystal Sea". When offloading Crystal Sea at Mongstad, the oil was burnt off at the installation. -
Cuttings at the Norwegian Offshore Directorate
Cuttings at the Norwegian Offshore Directorate Cuttings available for sampling?YESCuttings at the Norwegian Offshore Directorate Cutting sample, top depth [m]Cutting samples, bottom depth [m]3640.005267.00 -
Cores at the Norwegian Offshore Directorate
Cores at the Norwegian Offshore Directorate Core sample numberCore sample - top depthCore sample - bottom depthCore sample depth - uom15041.05054.7[m ]25063.05116.8[m ]35117.05146.0[m ]45146.05166.8[m ]55167.05212.7[m ]65212.75237.0[m ]Cores at the Norwegian Offshore Directorate Total core sample length [m]187.3Cores at the Norwegian Offshore Directorate Cores available for sampling?YES -
Core photos
-
Palynological slides at the Norwegian Offshore Directorate
Palynological slides at the Norwegian Offshore Directorate Sample depthDepth unitSample typeLaboratory3640.0[m]DCRRI3660.0[m]DCRRI3680.0[m]DCRRI3690.0[m]DCRRI3710.0[m]DCRRI3720.0[m]DCRRI3750.0[m]DCRRI3760.0[m]DCRRI3780.0[m]DCRRI3790.0[m]DCRRI3810.0[m]DCRRI3830.0[m]DCRRI3840.0[m]DCRRI3860.0[m]DCRRI3870.0[m]DCRRI3890.0[m]DCRRI3900.0[m]DCRRI3920.0[m]DCRRI3930.0[m]DCRRI3950.0[m]DCRRI3970.0[m]DCRRI3980.0[m]DCRRI4000.0[m]DCRRI4020.0[m]DCRRI4030.0[m]DCRRI4050.0[m]DCRRI4060.0[m]DCRRI4080.0[m]DCRRI4090.0[m]DCRRI4110.0[m]DCRRI4120.0[m]DCRRI4140.0[m]DCRRI4150.0[m]DCRRI4170.0[m]DCRRI4185.0[m]DCRRI4200.0[m]DCRRI4215.0[m]DCRRI4230.0[m]DCRRI4250.0[m]DCRRI4265.0[m]DCRRI4280.0[m]DCRRI4335.0[m]DCRRI4350.0[m]DCRRI4365.0[m]DCRRI4380.0[m]DCRRI4395.0[m]DCRRI4410.0[m]DCRRI4425.0[m]DCRRI4440.0[m]DCRRI4455.0[m]DCRRI4470.0[m]DCRRI4485.0[m]DCRRI4500.0[m]DCRRI4515.0[m]DCRRI4530.0[m]DCRRI4545.0[m]DCRRI4551.0[m]DCRRI4560.0[m]DCRRI4566.0[m]DCRRI4578.0[m]DCRRI4584.0[m]DCRRI4587.0[m]DCRRI4590.0[m]DCRRI4596.0[m]DCRRI4611.0[m]DCRRI4626.0[m]DCRRI4644.0[m]DCRRI4656.0[m]DCRRI4665.0[m]DCRRI4674.0[m]DCRRI4683.0[m]DCRRI4692.0[m]DCRRI4704.0[m]DCRRI4713.0[m]DCRRI4722.0[m]DCRRI4731.0[m]DCRRI4740.0[m]DCRRI4749.0[m]DCRRI4761.0[m]DCRRI4770.0[m]DCRRI4782.0[m]DCRRI4791.0[m]DCRRI4800.0[m]DCRRI4809.0[m]DCRRI4818.0[m]DCRRI4827.0[m]DCRRI4836.0[m]DCRRI4845.0[m]DCRRI4854.0[m]DCRRI4860.0[m]DCRRI4869.0[m]DCRRI4878.0[m]DCRRI4887.0[m]DCRRI4896.0[m]DCRRI4905.0[m]DCRRI4914.0[m]DCRRI4922.0[m]DCRRI4932.0[m]DCRRI4941.0[m]DCRRI4950.0[m]DCRRI4959.0[m]DCRRI4968.0[m]DCRRI4977.0[m]DCRRI4986.0[m]DCRRI4995.0[m]DCRRI5001.0[m]DCRRI5007.0[m]DCRRI5013.0[m]DCRRI5019.0[m]DCRRI5025.0[m]DCRRI5031.0[m]DCRRI5037.0[m]DCRRI5041.8[m]CRRI5050.4[m]CRRI5054.5[m]CRRI5063.2[m]CRRI5065.6[m]CRRI5072.1[m]CRRI5076.5[m]CRRI5082.1[m]CRRI5087.7[m]CRRI5096.4[m]CRRI5096.7[m]CRRI5102.8[m]CRRI5108.8[m]CRRI5116.4[m]CRRI5122.5[m]CRRI5128.5[m]CRRI5134.6[m]CRRI5139.4[m]CRRI5143.0[m]CRRI5146.7[m]CRRI5152.7[m]CRRI5158.5[m]CRRI5163.9[m]CRRI5169.4[m]CRRI5224.4[m]CRRI5229.0[m]CRRI5232.6[m]CRRI5236.8[m]CRRI -
Oil samples at the Norwegian Offshore Directorate
Oil samples at the Norwegian Offshore Directorate Test typeBottle numberTop depth
MD [m]Bottom depth
MD [m]Fluid typeTest timeSamples availableDSTDST10.000.0023.08.1996 - 09:30YESDSTDST20.000.0003.09.1996 - 05:30YES -
Lithostratigraphy
Lithostratigraphy Top depth [mMD RKB]Lithostrat. unit311152320272027237223722464254025402813300236813681372845544577457745904731473148044835490149014980502650425211 -
Composite logs
Composite logs Document nameDocument formatDocument size [MB]pdf0.61 -
Geochemical information
Geochemical information Document nameDocument formatDocument size [MB]pdf1.00 -
Documents – reported by the production licence (period for duty of secrecy expired)
Documents – reported by the production licence (period for duty of secrecy expired) Document nameDocument formatDocument size [MB]pdf44.41 -
Drill stem tests (DST)
Drill stem tests (DST) Test numberFrom depth MD
[m]To depth MD
[m]Choke size
[mm]1.05236522620.62.05207519819.0Drill stem tests (DST) Test numberFinal shut-in pressure
[MPa]Final flow pressure
[MPa]Bottom hole pressure
[MPa]Downhole temperature
[°C]1.012.0001622.073.000162Drill stem tests (DST) Test numberOil
[Sm3/day]Gas
[Sm3/day]Oil density
[g/cm3]Gas grav. rel.airGOR
[m3/m3]1.06904530000.8406562.04701739000.8310.775360 -
Logs
Logs Log typeLog top depth [m]Log bottom depth [m]6CAL CHT GR22074730DIFL MAC CHT GR47355271DPR6174756FMT VPC CHT GR37094369MAC HXDIP GR36005270MDT GR47685230MRIL CHT GR47365233TRIPLE COMBO47565264VSP GR18255260ZDL CN CHT GR35905275 -
Casing and leak–off tests
Casing and leak–off tests Casing typeCasing diam.
[inch]Casing depth
[m]Hole diam.
[inch]Hole depth
[m]LOT/FIT mud eqv.
[g/cm3]Formation test typeCONDUCTOR30370.036370.00.00LOTINTERM.20617.026618.01.40LOTINTERM.13 3/82227.017 1/22230.01.87LOTINTERM.9 5/84739.012 1/44739.00.00LOTOPEN HOLE5268.08 1/25268.00.00LOT -
Drilling mud
Drilling mud Depth MD [m]Mud weight [g/cm3]Visc. [mPa.s]Yield point [Pa]Mud typeDate measured10701.25DUMMY17201.28DUMMY22421.3618.0ANCO 200023401.6565.0ANCO VERT25601.6652.0ANCO VERT39801.7659.0ANCO VERT39861.6652.0ANCO VERT43261.7254.0ANCO VERT45481.7656.0ANCO VERT46191.7655.0ANCO VERT47271.7657.0ANCO VERT47561.7656.0ANCO VERT47901.20DUMMY47901.2018.0ANCO VERT48021.2030.0ANCO VERT48311.2029.0ANCO VERT49501.20DUMMY49531.2023.0ANCO VERT49991.2025.0ANCO VERT50411.2027.0ANCO VERT50631.2018.0ANCO VERT51171.20DUMMY51461.20DUMMY52121.20DUMMY52371.20DUMMY52681.2030.0ANCO VERT52681.20DUMMY -
Pressure plots
Pressure plots The pore pressure data is sourced from well logs if no other source is specified. In some wells where pore pressure logs do not exist, information from Drill stem tests and kicks have been used. The data has been reported to the NPD, and further processed and quality controlled by IHS Markit.Pressure plots Document nameDocument formatDocument size [MB]pdf0.30