MORVIN
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status – history
Activity status – history StatusStatus fromStatus toProducing01.08.2010Approved for production25.04.200831.07.2010 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType25.04.2008Kongen i statsrådPDO -
Owner – current
Owner – current Owner kindOwner namePRODUCTION LICENSE -
Operatorship – current
Operatorship – current Company name -
Licensees – current
Licensees – current Company nameNation codeCompany share [%]NO64.000000NO30.000000NO6.000000 -
Description
Description TypeTextDate updatedDevelopmentMorvin is a field in the Norwegian Sea, 15 kilometres west of the Åsgard field. The water depth is 360 metres. Morvin was discovered in 2001, and the plan for development and production (PDO) was approved in 2008. The field is developed with two 4-slot subsea templates, tied to the Åsgard B facility. The production started in 2010.14.12.2023ReservoirMorvin produces gas and oil from Jurassic sandstone in the Tilje, Tofte, Ile, Garn and Spekk Formations. The reservoirs are in a rotated and tilted fault block at depths of 4500-4700 metres. They have high pressure and high temperature (HPHT).14.12.2023Recovery strategyThe field is produced by pressure depletion.28.02.2023TransportThe well stream from Morvin is transported by a heated, 20-kilometre pipeline to the Åsgard B facility for processing. The condensate is separated from the gas and stabilised before being shipped together with condensate from the Åsgard field. The condensate is sold as oil. The rich gas is transported via the Åsgard Transport System (ÅTS) to the Kårstø terminal for separation of the natural gas liquids (NGL). The dry gas is transported from Kårstø to continental Europe via the Europipe II pipeline.14.12.2023StatusDrilling of new wells on Morvin is challenging. The focus is therefore to continue production from current wells, for example by conducting well interventions. In 2023, two coiled tubing operations have been performed on existing wells.14.12.2023 -
Investments (expected)
Investments (expected) The operators future investments related to the reservers from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.0 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum80152022-21202123202024201902018182017920161201502014-2201302012-3120116062010342920091843200817072007409 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum9.4471864.4083450.0000001.86729715.7228280.1116280.0553710.0000000.0131590.1801580.2034470.0860740.0000000.0180780.3075990.2113110.0913570.0000000.0193540.3220220.1741710.0824810.0000000.0253730.2820250.2728750.3253760.0000000.1209160.7191670.4255700.3714410.0000000.1627580.9597690.4657440.2960110.0000000.1365710.8983260.4602380.2552120.0000000.1127900.8282400.5136620.3810040.0000000.1783991.0730650.6667810.5294500.0000000.2698881.4661190.9638000.7601490.0000000.3548692.0788181.3018190.9670160.0000000.3719952.6408301.7106760.2074030.0000000.0831472.0012261.5584510.0000000.0000000.0000001.5584510.4070130.0000000.0000000.0000000.407013 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum9.2392804.8145150.00000014.0537950.1005220.0707690.0000000.1712910.1828670.1196790.0000000.3025460.1917560.1231460.0000000.3149020.1731860.1125660.0000000.2857520.2662350.1657970.0000000.4320320.3641020.2266420.0000000.5907440.4250290.2449450.0000000.6699740.4098670.1919210.0000000.6017880.4972400.2461170.0000000.7433570.6667670.3297780.0000000.9965450.9638000.4968860.0000001.4606861.3018200.6714310.0000001.9732511.7241110.8589970.0000002.5831081.5584510.7537390.0000002.3121900.4135270.2021020.0000000.615629 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
-
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent24.11.200912.08.2010PRODUCTIONOIL/GAS/CONDENSATE12.03.201013.05.2011PRODUCTIONOIL27.11.200917.02.2010PRODUCTIONNOT APPLICABLE22.02.201015.11.2010PRODUCTIONOIL22.10.200912.05.2010PRODUCTIONGAS/CONDENSATE -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus