Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
28.04.2024 - 01:35
Time of last synchronization with Norwegian Offshore Directorate's internal systems

AASTA HANSTEEN

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    AASTA HANSTEEN
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Producing
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    1997
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    Norwegian sea
    Main supply base
    Main supply base
    Sandnessjøen
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    23395946
  • Picture

    Picture
    AASTA HANSTEEN Field
  • Discoveries included

  • Activity status – history

    Activity status – history
    Status
    Status from
    Status to
    Producing
    16.12.2018
    Approved for production
    07.06.2013
    15.12.2018
  • Located in

    Located in
    Block name
    Prod. licence
    6707/10
    6706/12
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    03.10.2017
    PUD-fritak Snefrid Nord
    PDO Exemption
    07.06.2013
    Behandlet i Stortinget
    PDO
  • Owner – current

    Owner – current
    Owner kind
    Owner name
    PRODUCTION LICENSE
  • Operatorship – current

    Operatorship – current
    Company name
  • Licensees – current

    Licensees – current
    Company name
    Nation code
    Company share [%]
    NO
    51.000000
    NO
    24.000000
    NO
    15.000000
    NO
    10.000000
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    0.00
    61.33
    0.00
    1.18
    62.51
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    4.00
    1.00
    0.00
    84.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    0.00
    20.74
    0.00
    0.30
    21.04
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Aasta Hansteen is a field in the northern part of the Norwegian Sea, 120 kilometres northwest of the Norne field. The water depth is 1270 metres. Aasta Hansteen was discovered in 1997, and the plan for development and production (PDO) was approved in 2013. The field initially comprised three separate accumulations: Luva, Haklang and Snefrid Sør. A new accumulation was discovered in 2015, Snefrid Nord. The field is developed with a SPAR (Single Point Anchor Reservoir) platform moored to the seabed. The development includes in addition two subsea templates with four slots each and two subsea templates with one slot each (satellites). The templates are tied-back to the platform through pipelines and steel catenary risers. Aasta Hansteen was granted a PDO exemption for the development Snefrid Nord in 2017. The production started in 2018.
    14.12.2023
    Reservoir
    The main reservoirs contain gas in Upper Cretaceous sandstone in the Nise Formation, at a depth of 3000 metres. The reservoir quality is good.
    28.02.2023
    Recovery strategy
    The field is produced by pressure depletion and natural aquifer drive.
    28.02.2023
    Transport
    Gas from Aasta Hansteen is transported via the Polarled pipeline to the terminal at Nyhamna. Light oil is offloaded to shuttle tankers and transported to the market.
    28.02.2023
    Status
    The production is at the end of the plateau phase. It is planned to produce the field with low-pressure production in the future. The Irpa field is under construction as a subsea tied-back to Aasta Hansteen.
    14.12.2023
  • Investments (expected)

    Investments (expected)
    The operators future investments related to the reservers from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    836
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    36470
    2022
    298
    2021
    119
    2020
    119
    2019
    763
    2018
    4440
    2017
    4950
    2016
    5848
    2015
    8198
    2014
    7754
    2013
    3981
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
    Sum
    0.000000
    41.639955
    0.894131
    0.000000
    42.534086
    2024
    0.000000
    1.361728
    0.030016
    0.000000
    1.391744
    2023
    0.000000
    6.938700
    0.147880
    0.000000
    7.086580
    2022
    0.000000
    8.889595
    0.185064
    0.000000
    9.074659
    2021
    0.000000
    8.919575
    0.172276
    0.000000
    9.091851
    2020
    0.000000
    8.749396
    0.191681
    0.000000
    8.941077
    2019
    0.000000
    6.753622
    0.166909
    0.000000
    6.920531
    2018
    0.000000
    0.027339
    0.000305
    0.000000
    0.027644
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
    Sum
    0.000000
    42.146653
    0.575704
    42.722357
    2024
    0.000000
    1.382656
    0.017276
    1.399932
    2023
    0.000000
    7.064872
    0.086024
    7.150896
    2022
    0.000000
    8.987095
    0.108731
    9.095826
    2021
    0.000000
    9.034360
    0.103686
    9.138046
    2020
    0.000000
    8.838974
    0.133329
    8.972303
    2019
    0.000000
    6.800205
    0.126374
    6.926579
    2018
    0.000000
    0.038491
    0.000284
    0.038775
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    12.07.2008
    28.08.2008
    WILDCAT
    P&A
    GAS
    20.02.2015
    21.03.2015
    WILDCAT
    P&A
    OIL/GAS
    19.04.1997
    23.07.1997
    WILDCAT
    P&A
    GAS
    31.08.2008
    13.10.2008
    WILDCAT
    P&A
    GAS
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
    30.06.2018
    02.09.2018
    PRODUCTION
    GAS
    02.07.2018
    09.11.2018
    PRODUCTION
    GAS
    15.11.2017
    17.06.2018
    PRODUCTION
    GAS
    18.11.2017
    31.05.2018
    PRODUCTION
    GAS
    02.12.2017
    29.04.2018
    PRODUCTION
    GAS
    30.11.2017
    15.04.2018
    PRODUCTION
    GAS
    05.12.2017
    01.04.2018
    PRODUCTION
    GAS
    27.11.2017
    15.05.2018
    PRODUCTION
    GAS
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status