MARIA

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    MARIA
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Producing
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    2010
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    Norwegian sea
    Main supply base
    Main supply base
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    26465170
  • Picture

    Picture
    MARIA Field
    Picture not available
  • Discoveries included

    Discoveries included
    Discovery name
  • Activity status – history

    Activity status – history
    Status
    Status from
    Status to
    Producing
    16.12.2017
    Approved for production
    04.09.2015
    15.12.2017
  • Located in

    Located in
    Block name
    Prod. licence
    6507/10
    6406/3
    6406/3
    6407/1
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    28.06.2023
    Godkjent av OED (Maria revitalization project)
    Changed PDO
    04.09.2015
    Kongen i statsråd
    PDO
    Endret PUD Maria Fase 2
    Changed PDO
  • Owner – current

    Owner – current
    Owner kind
    Owner name
    PRODUCTION LICENSE
  • Operatorship – current

    Operatorship – current
    Company name
  • Licensees – current

    Licensees – current
    Company name
    Nation code
    Company share [%]
    NO
    50.000000
    NO
    30.000000
    NO
    20.000000
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    15.89
    1.69
    1.03
    0.00
    19.54
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    47.00
    0.00
    6.00
    0.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    10.42
    1.15
    0.69
    0.00
    12.88
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Maria is a field on Haltenbanken in the Norwegian Sea, 25 kilometres east of the Kristin field. The water depth is 300 metres. Maria was discovered in 2010, and the plan for development and production (PDO) was approved in 2015. The field has initially been developed with two templates with five producers and two injectors, tied-back to the Kristin field. Gas for gas lift is supplied from the Åsgard B facility via the Tyrihans D template. Sulphate-reduced water for injection is supplied from Heidrun. The production started in 2017. An amended PDO for Maria Phase 2, including a new template and four wells, was approved in June 2023.
    14.12.2023
    Reservoir
    Maria produces oil and gas from massive sandstone with shale layers in the Middle Jurassic Garn Formation. The reservoir is at a depth of 3800 metres.
    14.12.2023
    Recovery strategy
    The field is produced by water injection for pressure support. The wells are equipped with gas lift.
    28.02.2023
    Transport
    The well stream is routed to the Kristin platform for processing and further export together with the gas and oil from the Kristin and Tyrihans fields. Stabilised oil is transported from Kristin to Åsgard C and further offloaded to shuttle tankers. The rich gas is sent via the Åsgard Transport System (ÅTS) to the Kårstø terminal, where NGL and condensate is extracted.
    28.02.2023
    Status
    Maria Phase 2 will increase recovery from the middle part of the Garnformation, which is undrained by current wells. Drilling of the wells in Maria Phase 2 is planned for 2024, with start-up of production in mid-2025.
    14.12.2023
  • Investments (expected)

    Investments (expected)
    The operators future investments related to the reservers from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    6188
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    15013
    2022
    641
    2021
    309
    2020
    1526
    2019
    625
    2018
    773
    2017
    5188
    2016
    4224
    2015
    1700
    2014
    27
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
    Sum
    5.512288
    0.184491
    0.000000
    0.107028
    5.803807
    2024
    0.103202
    0.012903
    0.000000
    0.007520
    0.123625
    2023
    0.653953
    0.064127
    0.000000
    0.041387
    0.759467
    2022
    1.219110
    0.107461
    0.000000
    0.058121
    1.384692
    2021
    1.208819
    0.000000
    0.000000
    0.000000
    1.208819
    2020
    0.835583
    0.000000
    0.000000
    0.000000
    0.835583
    2019
    0.439606
    0.000000
    0.000000
    0.000000
    0.439606
    2018
    1.052015
    0.000000
    0.000000
    0.000000
    1.052015
    2017
    0.000000
    0.000000
    0.000000
    0.000000
    0.000000
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
    Sum
    5.587349
    0.808690
    0.000000
    6.396039
    2024
    0.099956
    0.016972
    0.000000
    0.116928
    2023
    0.634806
    0.095188
    0.000000
    0.729994
    2022
    1.178789
    0.187552
    0.000000
    1.366341
    2021
    1.217602
    0.175005
    0.000000
    1.392607
    2020
    0.820216
    0.116274
    0.000000
    0.936490
    2019
    0.431472
    0.055136
    0.000000
    0.486608
    2018
    1.136087
    0.153726
    0.000000
    1.289813
    2017
    0.068421
    0.008837
    0.000000
    0.077258
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    16.05.2010
    10.08.2010
    WILDCAT
    P&A
    OIL
    31.01.2012
    21.05.2012
    APPRAISAL
    P&A
    OIL/GAS
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
    18.04.2017
    26.10.2017
    INJECTION
    WATER
    05.06.2020
    28.07.2020
    PRODUCTION
    OIL
    27.04.2017
    16.05.2017
    INJECTION
    WATER
    20.04.2017
    25.12.2017
    PRODUCTION
    OIL
    30.03.2017
    30.08.2017
    PRODUCTION
    OIL
    09.04.2017
    05.02.2018
    PRODUCTION
    OIL
    02.04.2017
    18.09.2017
    INJECTION
    WATER
    13.03.2020
    17.05.2020
    INJECTION
    WATER
    28.03.2017
    18.07.2017
    PRODUCTION
    OIL
    24.03.2024
    PRODUCTION
    PRODUCTION
    18.03.2024
    PRODUCTION
    12.03.2024
    19.04.2024
    PRODUCTION
    OIL
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status