GINA KROG

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    GINA KROG
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Producing
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    1978
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    North sea
    Main supply base
    Main supply base
    Dusavik
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    23384544
  • Picture

    Picture
    GINA KROG Field
  • Discoveries included

    Discoveries included
    Discovery name
  • Activity status — history

    Activity status — history
    Status
    Status from
    Status to
    Producing
    30.06.2017
    Approved for production
    21.05.2013
    29.06.2017
  • Located in

    Located in
    Block name
    Prod. licence
    15/5
    15/6
    15/6
    15/6
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    15.12.2022
    Endret PUD Alternativ oljeeksport løsning
    PDO
    21.05.2013
    Behandlet i Stortinget
    PDO
  • Ownership — full history

    Ownership — full history
    Owner kind
    Owner name
    Ownership from date
    Ownership to date
    BUSINESS ARRANGEMENT AREA
    21.05.2013
  • Operatorship — full history

    Operatorship — full history
    Company name
    Operatorship from
    Operatorship to
    16.05.2018
    21.05.2013
    15.05.2018
  • Licensees — full history

    Licensees — full history
    Company name
    Nation code
    Company share [%]
    Date licensee from
    Date licensee to
    NO
    58.700000
    25.09.2024
    NO
    41.300000
    25.09.2024
    NO
    58.700000
    18.06.2024
    24.09.2024
    NO
    41.300000
    18.06.2024
    24.09.2024
    NO
    58.700000
    23.01.2024
    17.06.2024
    NO
    30.000000
    23.01.2024
    17.06.2024
    NO
    11.300000
    23.01.2024
    17.06.2024
    NO
    58.700000
    30.04.2020
    22.01.2024
    NO
    30.000000
    30.04.2020
    22.01.2024
    NO
    11.300000
    30.04.2020
    22.01.2024
    NO
    58.700000
    16.05.2018
    29.04.2020
    NO
    30.000000
    16.05.2018
    29.04.2020
    NO
    8.000000
    16.05.2018
    29.04.2020
    NO
    3.300000
    16.05.2018
    29.04.2020
    NO
    58.700000
    30.11.2017
    15.05.2018
    NO
    30.000000
    30.11.2017
    15.05.2018
    NO
    8.000000
    30.11.2017
    15.05.2018
    NO
    3.300000
    30.11.2017
    15.05.2018
    NO
    58.700000
    18.03.2017
    29.11.2017
    NO
    15.000000
    18.03.2017
    29.11.2017
    NO
    15.000000
    18.03.2017
    29.11.2017
    NO
    8.000000
    18.03.2017
    29.11.2017
    NO
    3.300000
    18.03.2017
    29.11.2017
    NO
    58.700000
    21.12.2016
    17.03.2017
    NO
    15.000000
    21.12.2016
    17.03.2017
    NO
    15.000000
    21.12.2016
    17.03.2017
    NO
    8.000000
    21.12.2016
    17.03.2017
    NO
    3.300000
    21.12.2016
    17.03.2017
    NO
    58.700000
    30.09.2016
    20.12.2016
    NO
    30.000000
    30.09.2016
    20.12.2016
    NO
    8.000000
    30.09.2016
    20.12.2016
    NO
    3.300000
    30.09.2016
    20.12.2016
    NO
    58.700000
    30.12.2014
    29.09.2016
    NO
    30.000000
    30.12.2014
    29.09.2016
    NO
    8.000000
    30.12.2014
    29.09.2016
    NO
    3.300000
    30.12.2014
    29.09.2016
    NO
    58.700000
    21.05.2013
    29.12.2014
    NO
    38.000000
    21.05.2013
    29.12.2014
    NO
    3.300000
    21.05.2013
    29.12.2014
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    10.05
    18.46
    0.85
    0.00
    30.13
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    24.00
    12.00
    5.00
    21.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    2.03
    10.08
    0.18
    0.00
    12.45
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Gina Krog is a field on the Utsira High in the central part of the North Sea, just north of the Sleipner Vest field. The water depth is 120 metres. Gina Krog was discovered in 1978, and the plan for development and operation (PDO) was approved in 2013. The field is developed with a fixed platform with living quarters and processing facilities. The production started in 2017. An amended PDO for an alternative oil export solution was approved in 2022. Since September 2023, Gina Krog is fully electrified by power from shore via the Johan Sverdrup field.
    13.12.2023
    Reservoir
    Gina Krog produces oil and gas from sandstone of Middle Jurassic age in the Hugin Formation. The field is structurally complex and segmented, and the reservoir depth is 3300-3900 metres. Reservoir thickness and quality are varying.
    13.12.2023
    Recovery strategy
    The field has earlier been produced by gas injection in most reservoir segments. Since 2021, all segments are produced by pressure depletion.
    28.02.2023
    Transport
    Stabilised oil and condensate are transported to a floating storage and offloading vessel (Randgrid FSO), and then offloaded to shuttle tankers for further transport. Rich gas is exported to the Sleipner A facility for further processing. Sales gas is exported from Sleipner A via Gassled (Area D) to the market, while unstable condensate is exported to the Kårstø terminal.
    28.02.2023
    Status
    Oil production is declining, and to keep the production as high as possible, gas lift is used in some of the wells. In addition, two injection wells have been converted to producers. The strategy is to keep the gas production at plateau while at the same time maximising oil production. The second drilling campaign on Gina Krog started in June 2023 with two new wells, one with an exploration target. A PDO for the subsea tie-back of the discovery 15/5-2 Eirin was delivered in September 2023. The alternative oil export solution, which includes a pipeline from Gina Krog to the Sleipner A platform, is planned to be in operation in 2024.
    13.12.2023
  • Investments (expected)

    Investments (expected)
    The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    3023
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    31772
    2022
    691
    2021
    349
    2020
    233
    2019
    1434
    2018
    2631
    2017
    5147
    2016
    7139
    2015
    7551
    2014
    4450
    2013
    2147
    2012
    0
    2011
    0
    2010
    0
    2009
    0
    2008
    0
    2007
    0
    2006
    0
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
    Sum
    8.398534
    10.177655
    0.000000
    1.329551
    19.905740
    2024
    0.483594
    2.010079
    0.000000
    0.055143
    2.548816
    2023
    0.525438
    2.331416
    0.000000
    0.065232
    2.922086
    2022
    0.662852
    2.811405
    0.000000
    0.058930
    3.533187
    2021
    0.870548
    0.725702
    0.000000
    0.151919
    1.748169
    2020
    1.263810
    0.249732
    0.000000
    0.285446
    1.798988
    2019
    1.860959
    0.853741
    0.000000
    0.375190
    3.089890
    2018
    1.983805
    0.609517
    0.000000
    0.253041
    2.846363
    2017
    0.747528
    0.586063
    0.000000
    0.084650
    1.418241
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
    Sum
    7.586719
    19.260306
    0.000000
    26.847025
    2024
    0.404524
    2.124511
    0.000000
    2.529035
    2023
    0.432096
    2.490991
    0.000000
    2.923087
    2022
    0.559553
    2.982429
    0.000000
    3.541982
    2021
    0.754996
    2.873864
    0.000000
    3.628860
    2020
    1.125636
    3.118896
    0.000000
    4.244532
    2019
    1.716873
    3.073588
    0.000000
    4.790461
    2018
    1.880536
    1.931535
    0.000000
    3.812071
    2017
    0.712505
    0.664492
    0.000000
    1.376997
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    26.11.1977
    08.04.1978
    WILDCAT
    P&A
    GAS/CONDENSATE
    04.07.2008
    07.09.2008
    APPRAISAL
    P&A
    OIL
    09.09.2008
    13.10.2008
    APPRAISAL
    P&A
    DRY
    09.09.1971
    26.10.1971
    APPRAISAL
    SUSPENDED
    SHOWS
    09.05.1974
    01.08.1974
    APPRAISAL
    P&A
    GAS/CONDENSATE
    26.05.2007
    13.06.2007
    APPRAISAL
    P&A
    GAS/CONDENSATE
    13.06.2007
    23.07.2007
    APPRAISAL
    P&A
    OIL
    29.03.2007
    27.05.2007
    APPRAISAL
    P&A
    OIL/GAS
    26.12.2010
    13.03.2011
    APPRAISAL
    P&A
    GAS/CONDENSATE
    27.10.2010
    19.12.2010
    APPRAISAL
    P&A
    DRY
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
    02.05.2018
    23.08.2018
    PRODUCTION
    OIL
    PRODUCTION
    NOT APPLICABLE
    14.05.2016
    23.01.2018
    OBSERVATION
    OIL
    19.02.2018
    10.04.2018
    PRODUCTION
    OIL
    06.05.2018
    16.10.2018
    PRODUCTION
    OIL
    11.05.2018
    05.05.2019
    PRODUCTION
    OIL
    18.05.2019
    23.07.2023
    OBSERVATION
    04.08.2023
    02.09.2023
    PRODUCTION
    26.08.2015
    10.12.2015
    OBSERVATION
    OIL
    12.12.2015
    08.01.2016
    PRODUCTION
    OIL
    01.09.2015
    09.10.2015
    INJECTION
    GAS
    03.08.2016
    17.12.2018
    PRODUCTION
    GAS
    22.02.2019
    13.03.2019
    INJECTION
    GAS
    13.07.2017
    26.11.2017
    PRODUCTION
    OIL
    23.05.2016
    01.10.2017
    PRODUCTION
    GAS
    30.07.2016
    13.02.2019
    INJECTION
    GAS
    17.05.2016
    22.11.2018
    INJECTION
    GAS
    26.12.2018
    07.01.2019
    INJECTION
    GAS
    23.08.2015
    27.04.2016
    PRODUCTION
    OIL
    29.08.2015
    01.03.2016
    OBSERVATION
    OIL
    01.03.2016
    17.03.2016
    PRODUCTION
    OIL
    19.08.2015
    27.06.2018
    PRODUCTION
    OIL
    23.09.2023
    31.10.2023
    PRODUCTION
    GAS
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status