MARIA
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing16.12.2017Approved for production04.09.201515.12.2017 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType28.06.2023Godkjent av OED (Maria revitalization project)Changed PDO04.09.2015Kongen i statsrådPDOEndret PUD Maria Fase 2Changed PDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE04.09.2015 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to13.11.201904.09.201512.11.2019 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO50.00000031.05.2022NO30.00000031.05.2022NO20.00000031.05.2022NO50.00000013.11.201930.05.2022NO30.00000013.11.201930.05.2022NO20.00000013.11.201930.05.2022NO50.00000004.12.201812.11.2019NO30.00000004.12.201812.11.2019NO20.00000004.12.201812.11.2019NO50.00000022.12.201703.12.2018NO30.00000022.12.201703.12.2018NO20.00000022.12.201703.12.2018NO50.00000004.09.201521.12.2017NO30.00000004.09.201521.12.2017NO20.00000004.09.201521.12.2017 -
Description
Description TypeTextDate updatedDevelopmentMaria is a field on Haltenbanken in the Norwegian Sea, 25 kilometres east of the Kristin field. The water depth is 300 metres. Maria was discovered in 2010, and the plan for development and production (PDO) was approved in 2015. The field has initially been developed with two templates with five producers and two injectors, tied-back to the Kristin field. Gas for gas lift is supplied from the Åsgard B facility via the Tyrihans D template. Sulphate-reduced water for injection is supplied from Heidrun. The production started in 2017. An amended PDO for Maria Phase 2, including a new template and four wells, was approved in June 2023.14.12.2023ReservoirMaria produces oil and gas from massive sandstone with shale layers in the Middle Jurassic Garn Formation. The reservoir is at a depth of 3800 metres.14.12.2023Recovery strategyThe field is produced by water injection for pressure support. The wells are equipped with gas lift.28.02.2023TransportThe well stream is routed to the Kristin platform for processing and further export together with the gas and oil from the Kristin and Tyrihans fields. Stabilised oil is transported from Kristin to Åsgard C and further offloaded to shuttle tankers. The rich gas is sent via the Åsgard Transport System (ÅTS) to the Kårstø terminal, where NGL and condensate is extracted.28.02.2023StatusMaria Phase 2 will increase recovery from the middle part of the Garnformation, which is undrained by current wells. Drilling of the wells in Maria Phase 2 is planned for 2024, with start-up of production in mid-2025.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.6188 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum1501320226412021309202015262019625201877320175188201642242015170020142720130 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum5.8414030.2238600.0000000.1336656.1989280.4027290.0504930.0000000.0371260.4903480.6544590.0660780.0000000.0374860.7580231.2106010.1072890.0000000.0590531.3769431.2088190.0000000.0000000.0000001.2088190.8355830.0000000.0000000.0000000.8355830.4634120.0000000.0000000.0000000.4634121.0658000.0000000.0000000.0000001.0658000.0000000.0000000.0000000.0000000.000000 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum5.9148910.8866350.0000006.8015250.3958090.0699930.0000000.4658020.6377270.0968350.0000000.7345611.1787700.1875550.0000001.3663251.2176020.1750050.0000001.3926070.8202160.1162740.0000000.9364900.4465920.0631730.0000000.5097651.1542520.1653730.0000001.3196250.0639230.0124270.0000000.076350 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent16.05.201010.08.2010WILDCATP&AOIL31.01.201221.05.2012APPRAISALP&AOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent18.04.201726.10.2017INJECTIONWATER05.06.202028.07.2020PRODUCTIONOIL27.04.201716.05.2017INJECTIONWATER20.04.201725.12.2017PRODUCTIONOIL30.03.201730.08.2017PRODUCTIONOIL09.04.201705.02.2018PRODUCTIONOIL02.04.201718.09.2017INJECTIONWATER13.03.202017.05.2020INJECTIONWATER28.03.201718.07.2017PRODUCTIONOIL24.03.2024PRODUCTIONOILPRODUCTION18.03.2024PRODUCTIONWATER12.03.202419.04.2024PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus