EDVARD GRIEG
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing28.11.2015Approved for production11.06.201227.11.2015 -
Located in
Located in Block nameProd. licence16/1 -
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType11.06.2012Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE11.06.2012 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to01.01.202330.06.202231.12.202201.04.202029.06.202211.06.201231.03.2020 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO65.00000001.01.2023NO20.00000001.01.2023NO15.00000001.01.2023NO65.00000030.06.202231.12.2022NO20.00000030.06.202231.12.2022NO15.00000030.06.202231.12.2022NO65.00000001.04.202029.06.2022NO20.00000001.04.202029.06.2022NO15.00000001.04.202029.06.2022NO65.00000013.11.201931.03.2020NO20.00000013.11.201931.03.2020NO15.00000013.11.201931.03.2020NO65.00000030.06.201612.11.2019NO20.00000030.06.201612.11.2019NO15.00000030.06.201612.11.2019NO50.00000031.07.201329.06.2016NO20.00000031.07.201329.06.2016NO15.00000031.07.201329.06.2016NO15.00000031.07.201329.06.2016NO50.00000011.06.201230.07.2013NO30.00000011.06.201230.07.2013NO20.00000011.06.201230.07.2013 -
Description
Description TypeTextDate updatedDevelopmentEdvard Grieg is a field in the Utsira High area in the central North Sea, 35 kilometres south of the Grane and Balder fields. The water depth is 110 metres. Edvard Grieg was discovered in 2007, and the plan for development and operation (PDO) was approved in 2012. The field is developed with a fixed installation with a steel jacket and full process facility, and it utilises a jack-up rig for drilling and completion of wells. The production started in 2015. The Edvard Grieg installation supplies power to the Ivar Aasen field and processes the well stream from Ivar Aasen. The Solveig field is tied-back to Edvard Grieg. The Troldhaugen discovery is temporarily tied-back to Edvard Grieg for test production.13.12.2023ReservoirEdvard Grieg produces undersaturated oil from alluvial, aeolian and shallow marine sandstone and conglomerate of Late Triassic to Early Cretaceous age. The reservoir is at a depth of 1900 metres. The eservoir quality varies from moderate to very good in marine and aeolian sandstone, while the quality is poorer in alluvial sandstone and conglomerate. Oil is also proven in the underlying basement.13.12.2023Recovery strategyThe field is produced by pressure support from water injection.28.02.2023TransportThe oil is exported by pipeline to the Grane Oil Pipeline, which is connected to the Sture terminal. The gas is exported in a separate pipeline to the Scottish Area Gas Evacuation (SAGE) system in the UK.28.02.2023StatusEdvard Grieg production went off plateau in 2023. The field has been producing better than expected and the recoverable volumes have increased significantly since the PDO due to excellent reservoir performance. Two infill campaigns were finished in 2021 and 2023. Test production from the Troldhaugen discovery started in 2021 and has continued in 2023.13.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.3314 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum29393202256220212325202081820191672018134420172286201623032015547220146756201359072012145320110 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum41.1829093.7805500.0000002.08804747.0515051.5895250.1547600.0000000.0859151.8302004.1400170.4252230.0000000.2541784.8194185.1370270.4717340.0000000.2812585.8900195.6892110.4914030.0000000.2814576.4620715.0595690.4494910.0000000.2487015.7577604.9977390.4992260.0000000.2493195.7462845.1030520.4609190.0000000.2765085.8404795.4134690.4953350.0000000.2758156.1846193.9021510.3241450.0000000.1334454.3597410.1511490.0083140.0000000.0014510.160914 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum41.4252324.8899190.00000046.3151511.5899860.1901120.0000001.7800984.1744610.5065680.0000004.6810295.2119040.6223250.0000005.8342295.7696080.6574710.0000006.4270795.1608200.5762190.0000005.7370395.0970580.6394830.0000005.7365415.1001840.6348630.0000005.7350475.3945710.6102110.0000006.0047823.7777230.4361920.0000004.2139150.1489170.0164750.0000000.165392 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent08.09.200713.11.2007WILDCATSUSPENDEDOILAPPRAISALWILL NEVER BE DRILLED02.10.200910.10.2009WILDCATP&AOIL13.11.200805.02.2009APPRAISALP&AOIL30.11.200921.01.2010APPRAISALP&AOIL22.01.201105.04.2011APPRAISALP&AOIL06.04.201113.05.2011APPRAISALP&AOIL24.02.201414.05.2014APPRAISALP&AOIL24.06.201525.08.2015APPRAISALP&AOIL01.03.201711.04.2017APPRAISALP&AOIL11.05.201922.06.2019APPRAISALP&AOIL10.03.201910.05.2019APPRAISALP&AOIL -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent10.07.201605.09.2016INJECTIONWATER/GAS21.05.201511.06.2016INJECTIONWATER08.04.202302.08.2023PRODUCTIONOIL03.08.202331.08.2023PRODUCTIONOIL11.04.202302.06.2023PRODUCTIONOIL13.08.201715.12.2017INJECTIONWATER/GAS25.03.201510.05.2015PRODUCTIONOIL10.03.201719.05.2017PRODUCTIONOIL05.04.201828.05.2018OBSERVATIONNOT APPLICABLE01.06.201825.06.2018PRODUCTIONOIL02.12.201426.01.2015OBSERVATIONOIL16.12.201504.01.2016PRODUCTIONOIL02.10.201421.11.2014OBSERVATIONOIL01.02.201513.03.2015PRODUCTIONOIL05.05.202317.05.2023PRODUCTIONOIL01.10.201627.11.2016PRODUCTIONOIL20.08.201724.01.2018PRODUCTIONOIL04.02.202114.09.2021PRODUCTIONOIL06.12.201601.02.2017PRODUCTIONOIL12.02.202121.06.2021PRODUCTIONOIL22.06.202129.07.2021PRODUCTIONOIL19.02.202115.04.2021PRODUCTIONOIL04.02.201820.03.2018PRODUCTIONOIL02.06.201728.07.2017PRODUCTIONOIL04.09.201713.10.2017INJECTIONWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus