YME
Export: PDF
-
General information
-
Picture
-
Discoveries included
-
Activity status — history
Activity status — history StatusStatus fromStatus toProducing25.10.2021Approved for production23.03.201824.10.2021Shut down12.12.201422.03.2018Approved for production11.05.200711.12.2014Shut down17.04.200110.05.2007Producing27.02.199616.04.2001Approved for production06.01.199526.02.1996 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType23.03.2018Yme new development av OEDChanged PDO11.05.2007Redevelopment I Kongen i StatsrådPDO20.10.1998Beta Vest av Kongen i StatsrådPDO14.02.1997Fase III Gamma Sørøst av Kongen i StatsrådPDO01.12.1995Fase II Beta Øst av Kongen i StatsrådPDO06.01.1995Fase I Gamma Vest av Kongen i StatsrådPDO -
Ownership — full history
-
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to06.10.201501.09.201505.10.201516.11.200631.08.201522.03.200615.11.200618.06.200421.03.200610.05.200131.12.200106.01.199509.05.2001 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO55.00000026.09.2024NO20.00000026.09.2024NO15.00000026.09.2024NO10.00000026.09.2024NO55.00000002.05.202325.09.2024NO20.00000002.05.202325.09.2024NO15.00000002.05.202325.09.2024NO10.00000002.05.202325.09.2024NO55.00000023.12.202201.05.2023NO20.00000023.12.202201.05.2023NO15.00000023.12.202201.05.2023NO10.00000023.12.202201.05.2023NO55.00000016.05.201922.12.2022NO20.00000016.05.201922.12.2022NO15.00000016.05.201922.12.2022NO10.00000016.05.201922.12.2022NO55.00000030.11.201715.05.2019NO20.00000030.11.201715.05.2019NO15.00000030.11.201715.05.2019NO10.00000030.11.201715.05.2019NO60.00000030.11.201629.11.2017NO20.00000030.11.201629.11.2017NO10.00000030.11.201629.11.2017NO10.00000030.11.201629.11.2017NO60.00000006.10.201529.11.2016NO20.00000006.10.201529.11.2016NO10.00000006.10.201529.11.2016NO10.00000006.10.201529.11.2016NO60.00000001.09.201505.10.2015NO20.00000001.09.201505.10.2015NO10.00000001.09.201505.10.2015NO10.00000001.09.201505.10.2015NO60.00000030.07.201331.08.2015NO20.00000030.07.201331.08.2015NO10.00000030.07.201331.08.2015NO10.00000030.07.201331.08.2015NO60.00000024.03.201229.07.2013NO20.00000024.03.201229.07.2013NO10.00000024.03.201229.07.2013NO10.00000024.03.201229.07.2013NO60.00000017.01.200923.03.2012NO20.00000017.01.200923.03.2012NO10.00000017.01.200923.03.2012NO10.00000017.01.200923.03.2012NO60.00000001.01.200916.01.2009NO20.00000001.01.200916.01.2009NO10.00000001.01.200916.01.2009NO10.00000001.01.200916.01.2009NO70.00000002.01.200831.12.2008NO20.00000002.01.200831.12.2008NO10.00000002.01.200831.12.2008NO70.00000001.01.200801.01.2008NO10.00000001.01.200801.01.2008NO10.00000001.01.200801.01.2008NO10.00000001.01.200801.01.2008NO70.00000016.11.200731.12.2007NO20.00000016.11.200731.12.2007NO10.00000016.11.200731.12.2007NO70.00000023.03.200615.11.2007NO20.00000023.03.200615.11.2007NO10.00000023.03.200615.11.2007NO40.00000022.03.200622.03.2006NO30.00000022.03.200622.03.2006NO20.00000022.03.200622.03.2006NO10.00000022.03.200622.03.2006NO40.00000001.03.200621.03.2006NO30.00000001.03.200621.03.2006NO20.00000001.03.200621.03.2006NO10.00000001.03.200621.03.2006NO40.00000002.07.200528.02.2006NO30.00000002.07.200528.02.2006NO20.00000002.07.200528.02.2006NO10.00000002.07.200528.02.2006NO40.00000001.07.200501.07.2005NO30.00000001.07.200501.07.2005NO20.00000001.07.200501.07.2005NO10.00000001.07.200501.07.2005NO50.00000004.05.200530.06.2005NO30.00000004.05.200530.06.2005NO20.00000004.05.200530.06.2005NO50.00000030.03.200503.05.2005NO30.00000030.03.200503.05.2005NO20.00000030.03.200503.05.2005NO50.00000018.06.200429.03.2005NO30.00000018.06.200429.03.2005NO20.00000018.06.200429.03.2005NO65.00000001.06.200131.12.2001NO25.00000001.06.200131.12.2001NO10.00000001.06.200131.12.2001NO35.00000010.05.200131.05.2001NO30.00000010.05.200131.05.2001NO25.00000010.05.200131.05.2001NO10.00000010.05.200131.05.2001NO65.00000011.01.200109.05.2001NO25.00000011.01.200109.05.2001NO10.00000011.01.200109.05.2001NO65.00000017.12.199810.01.2001NO25.00000017.12.199810.01.2001NO10.00000017.12.199810.01.2001NO65.00000004.05.199516.12.1998NO25.00000004.05.199516.12.1998NO10.00000004.05.199516.12.1998NO65.00000006.01.199503.05.1995NO15.00000006.01.199503.05.1995NO10.00000006.01.199503.05.1995NO10.00000006.01.199503.05.1995 -
Description
Description TypeTextDate updatedDevelopmentYme is a field in the southeastern part of the Norwegian sector of the North Sea, 130 kilometres northeast of the Ula field. The water depth is 100 metres. The field comprises two separate main structures, Gamma and Beta, which are 12 kilometres apart. Yme was discovered in 1987, and the plan for development and operation (PDO) was approved in 1995. Yme was originally developed with a jack-up drilling and production platform on the Gamma structure and a storage vessel. The Beta structure was developed with a subsea template. The production started in 1996 and ceased in 2001, because operation of the field was no longer regarded as profitable. A PDO for the redevelopment of Yme was approved in 2007. The development concept was a new mobile offshore production unit (MOPU). Due to structural deficiencies and the vast amount of outstanding work to complete the facility, it was decided to remove it from the field in 2013. The removal of the MOPU was completed in 2016. In 2018, an amended PDO for the redevelopment of Yme was approved. The PDO includes a jack-up rig equipped with drilling and production facilities installed on the Gamma structure and a subsea template on the Beta structure, as well as reuse of existing facilities on the field. The production started again in 2021.14.12.2023ReservoirThe reservoir contains oil in two separate main structures, Gamma and Beta. The structures comprise six deposits. The reservoirs are in sandstone of Middle Jurassic age in the Sandnes Formation, at a depth of 3150 metres. They are heterogeneous and have variable properties.14.12.2023Recovery strategyThe field is produced by pressure support from partial water injection and water alternating gas (WAG) injection. Some of the wells are equipped with gas lift.14.12.2023TransportThe oil is transported with tankers and the gas is reinjected.28.02.2023StatusThe first WAG injection cycle was performed in mid-2023. The production was lower in 2023 than expected, due to delays in drilling and completion activities, lower production efficiency and higher water cut in some wells.14.12.2023 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.972 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum2663920221690202116992020265020193340201823362017224201602015020140201336201225992011247420102297200928262008167920077202006020050200402003020020200102000019992511998491997207199665419957281994157199323 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum10.4815080.0000000.0000000.00000010.4815080.9404530.0000000.0000000.0000000.9404531.0826000.0000000.0000000.0000001.0826000.5313170.0000000.0000000.0000000.5313170.0211290.0000000.0000000.0000000.0211290.2065050.0000000.0000000.0000000.2065051.0712680.0000000.0000000.0000001.0712681.4839530.0000000.0000000.0000001.4839531.9697610.0000000.0000000.0000001.9697611.9797450.0000000.0000000.0000001.9797451.1947770.0000000.0000000.0000001.194777 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum10.6749370.5107360.00000011.1856730.9404530.0580190.0000000.9984721.0826000.0661820.0000001.1487820.5313170.0330700.0000000.5643870.0242370.0024870.0000000.0267240.1247270.0069190.0000000.1316461.1395250.0511830.0000001.1907081.5937850.0647010.0000001.6584861.9548690.0847800.0000002.0396492.0006710.0846870.0000002.0853581.2827530.0587080.0000001.341461 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent21.02.198728.04.1987WILDCATP&AOIL04.12.198908.02.1990WILDCATP&AOIL25.12.199311.04.1994APPRAISALRE-CLASS TO DEVOIL23.06.199521.07.1995APPRAISALRE-CLASS TO DEVOIL19.08.199615.10.1996WILDCATRE-CLASS TO DEVOIL22.04.199710.06.1997WILDCATRE-CLASS TO DEVOIL24.06.199702.02.1998WILDCATRE-CLASS TO DEVDRY29.06.199917.09.1999WILDCATRE-CLASS TO DEVOILWILDCATRE-CLASS TO DEV -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent25.12.199311.04.1994PRODUCTIONOIL14.05.200025.06.2000PRODUCTIONOIL13.12.199617.04.1997PRODUCTIONOIL18.04.199705.05.1997PRODUCTIONOIL24.02.200015.03.2000PRODUCTIONOIL24.06.199702.02.1998INJECTIONGAS08.06.199613.08.1996PRODUCTIONOIL21.04.199919.05.1999PRODUCTIONOIL28.08.200013.10.2000PRODUCTIONOIL04.03.199513.04.1995INJECTIONWATER19.08.199615.10.1996PRODUCTIONOIL13.07.199908.08.1999PRODUCTIONOIL22.03.199616.05.1996PRODUCTIONOIL23.06.199521.07.1995PRODUCTIONOIL11.05.199621.06.1996PRODUCTIONOIL22.04.199710.06.1997PRODUCTIONOIL29.06.199917.09.1999PRODUCTIONOIL07.02.200913.11.2009PRODUCTIONOIL31.01.200926.09.2009PRODUCTIONDRY03.08.201012.09.2010PRODUCTIONOIL21.02.200912.09.2009PRODUCTIONOIL03.05.202410.06.2024PRODUCTIONOIL11.06.202425.06.2024PRODUCTIONOIL14.02.200922.11.2009PRODUCTIONOIL14.01.200920.08.2009INJECTIONWATER/GASINJECTION23.01.200901.08.2009INJECTIONWATER/GASINJECTION28.02.200927.01.2010PRODUCTIONDRY01.12.202328.02.2024INJECTIONWATER/GAS10.01.200913.01.2009OBSERVATIONNOT APPLICABLE18.04.202310.06.2023PRODUCTIONOIL31.03.202318.09.2023PRODUCTION20.07.200903.04.2010PRODUCTIONOIL29.07.200929.04.2010PRODUCTIONOIL26.06.200912.03.2010INJECTIONWATER15.07.202220.08.2022PRODUCTIONNOT APPLICABLE21.08.202231.08.2022PRODUCTIONOIL23.07.202209.12.2022INJECTIONWATER05.07.202229.09.2022PRODUCTIONOIL -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus13.09.202113.09.2021SOIL DRILLINGPLUGGED14.09.202115.09.2021SOIL DRILLINGPLUGGED13.09.202114.09.2021SOIL DRILLINGPLUGGED14.09.202114.09.2021SOIL DRILLINGPLUGGED14.09.202114.09.2021SOIL DRILLINGPLUGGED15.09.202115.09.2021SOIL DRILLINGPLUGGED15.09.202115.09.2021SOIL DRILLINGPLUGGED15.09.202116.09.2021SOIL DRILLINGPLUGGED