JOHAN CASTBERG
Export:
PDF

-
General information
-
Picture
Picture Picture not available -
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing31.03.2025Approved for production11.06.201830.03.2025 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType11.06.2018Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE11.06.2018 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to11.06.2018 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO46.30000001.01.2025NO30.00000001.01.2025NO23.70000001.01.2025NO50.00000028.01.202231.12.2024NO30.00000028.01.202231.12.2024NO20.00000028.01.202231.12.2024NO50.00000010.12.201827.01.2022NO30.00000010.12.201827.01.2022NO20.00000010.12.201827.01.2022NO50.00000011.06.201809.12.2018NO30.00000011.06.201809.12.2018NO20.00000011.06.201809.12.2018 -
Description
Description TypeTextDate updatedDevelopmentJohan Castberg is a field in the Barents Sea, 100 kilometres northwest of the Snøhvit field. The water depth is 370 metres. Johan Castberg consists of the three discoveries Skrugard, Havis and Drivis, proven between 2011 and 2013. The plan for development and operation (PDO) was approved in 2018. The discoveries were developed together, and the development concept is a production, storage and offloading vessel (FPSO) with additional subsea templates including 18 horizontal production wells and 12 injection wells.02.04.2025ReservoirThe reservoirs contain oil with gas caps in three separate sandstone deposits of Late Triassic to Middle Jurassic age in the Tubåen, Nordmela and Stø Formations. They are at depths of 1250-1900 metres. Reservoir properties in the Tubåen and Stø Formations are generally good; the Nordmela Formation is more heterogeneous with several lateral barriers.02.04.2025Recovery strategyThe field is produced by pressure support from gas and water injection.02.04.2025TransportThe oil is offloaded to shuttle tankers and transported to the market.02.04.2025StatusThe production started in March 2025.02.04.2025 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2024 [mill NOK 2024-kroner]. The stated investment estimate has not been corrected for possible investment sharing.23910 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum61426202311614202292372021865720201094420191158420188470201792020160 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3] -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3] -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent27.01.201224.03.2012APPRAISALP&AOIL/GAS05.12.201124.01.2012WILDCATP&AOIL/GAS02.10.201316.12.2013WILDCATP&AOIL/GAS28.02.201405.05.2014WILDCATP&AOIL/GAS07.02.202114.03.2021WILDCATP&AOIL27.02.201102.05.2011WILDCATP&AOIL/GAS18.04.202222.05.2022WILDCATPLUGGEDOIL16.04.202207.06.2022WILDCATPLUGGEDOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeStatusContent25.02.202526.03.2025INJECTIONCLOSEDWATER02.05.202115.10.2021PRODUCTIONCLOSEDOIL16.10.202121.10.2021PRODUCTIONCLOSEDOIL26.04.202127.05.2021INJECTIONCLOSEDGAS15.03.202118.06.2021PRODUCTIONCLOSEDOIL14.04.202118.09.2021PRODUCTIONPRODUCINGOIL07.04.202114.07.2021PRODUCTIONCLOSEDOIL04.04.2025PRODUCTIONDRILLING16.07.202427.07.2024PRODUCTIONCLOSEDOIL15.09.202025.10.2020INJECTIONINJECTINGWATER21.09.202030.07.2021INJECTIONINJECTINGWATER07.08.202408.09.2024INJECTIONCLOSEDWATER29.11.202117.01.2022PRODUCTIONCLOSEDOIL14.01.202131.01.2021INJECTIONCLOSEDGAS25.11.202119.02.2022PRODUCTIONCLOSEDOIL20.02.202224.02.2022PRODUCTIONCLOSEDOIL03.12.2021PRODUCTIONSUSPENDED09.08.202014.12.2020INJECTIONCLOSEDWATER14.08.202008.01.2021INJECTIONCLOSEDWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus