GOLIAT
Export: PDF
-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing12.03.2016Approved for production18.06.200911.03.2016 -
Located in
-
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType03.11.2020PUD-fritak Goliat WestPDO Exemption30.03.2017PUD fritak SnaddPDO Exemption18.06.2009Behandlet i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE18.06.2009 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to28.01.202210.12.201827.01.202218.06.200909.12.2018 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO65.00000028.01.2022NO35.00000028.01.2022NO65.00000010.12.201827.01.2022NO35.00000010.12.201827.01.2022NO65.00000016.05.201809.12.2018NO35.00000016.05.201809.12.2018NO65.00000002.11.200915.05.2018NO35.00000002.11.200915.05.2018NO65.00000018.06.200901.11.2009NO35.00000018.06.200901.11.2009 -
Description
Description TypeTextDate updatedDevelopmentGoliat is a field in the Barents Sea, 50 kilometres southeast of the Snøhvit field. The water depth is 360-420 metres. Goliat was discovered in 2000, and the plan for development and operation (PDO) was approved in 2009. The field is developed with a cylindrical floating production, storage and offloading facility (Sevan 1000 FPSO). Eight subsea templates with a total of 32 well slots are tied-back to the FPSO. Production started in 2016. Goliat was granted a PDO exemption for the Snadd reservoir in 2017 and the Goliat West segment in 2020. The production from these accumulations started in 2017 and 2021, respectively.13.12.2023ReservoirGoliat produces oil from sandstone of Triassic age in the Kobbe and Snadd Formations, and in the Kapp Toscana Group (Realgrunnen subgroup) of Triassic to Jurassic age. The reservoirs have thin gas caps and are in a complex and segmented structure at depths of 1100-1800 metres.13.12.2023Recovery strategyThe field is produced using water injection as pressure support. Additional pressure support results from reinjection of produced gas.28.02.2023TransportThe oil is offloaded to shuttle tankers for transport to the market. Future gas export is planned via the Snøhvit pipeline to the liquid natural gas (LNG) processing facility at Melkøya near Hammerfest.13.12.2023StatusProduction regularity has been below expectation since production start-up. Continuous maintenance and modification work along with several revision stops have resulted in a gradually improved regularity of the facility. A solution for Goliat gas export is being considered, which will contribute to extend the lifetime of the field. Several infill wells have been drilled since start up. In 2021 and 2023, the discoveries 7122/6-3 S (Rødhette) and 7122/8-1 S (Countach) were made in the area north of the Goliat field. More infill and exploration wells are planned in the coming years.03.01.2024 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.2904 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum546322022124420211436202080020195352018141220171520201633852015989420149389201366992012813620116683201027442009755 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum20.2058090.0000000.0000000.00000020.2058090.9512180.0000000.0000000.0000000.9512181.4916110.0000000.0000000.0000001.4916111.8845100.0000000.0000000.0000001.8845102.0228650.0000000.0000000.0000002.0228652.3135370.0000000.0000000.0000002.3135372.3586940.0000000.0000000.0000002.3586943.7202830.0000000.0000000.0000003.7202832.5129650.0000000.0000000.0000002.5129652.9501260.0000000.0000000.0000002.950126 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum20.2058098.9555040.00000029.1613120.9512180.9823400.0000001.9335581.4916111.3204940.0000002.8121041.8845101.2633910.0000003.1479012.0228651.1466760.0000003.1695412.3135371.3191170.0000003.6326542.3586940.9160670.0000003.2747613.7202831.0190140.0000004.7392972.5129650.4564560.0000002.9694212.9501260.5319490.0000003.482075 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent16.09.200005.10.2000WILDCATP&AOIL12.09.200119.10.2001APPRAISALP&AOIL24.10.200508.01.2006WILDCATP&AOIL/GAS21.09.200625.11.2006WILDCATP&AOIL/GAS23.12.200613.01.2007APPRAISALP&AOIL21.10.201204.01.2013APPRAISALP&AOIL/GAS28.11.201826.12.2018APPRAISALP&AOIL/GAS -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeContent10.08.201528.08.2015PRODUCTIONOIL13.06.201520.07.2015PRODUCTIONOIL11.06.201530.06.2015PRODUCTIONOIL08.08.201506.10.2015PRODUCTIONOIL07.10.201515.10.2015PRODUCTIONOIL23.06.201707.07.2017OBSERVATIONNOT APPLICABLE08.07.201714.07.2017PRODUCTIONOIL26.12.202004.01.2021PRODUCTIONOIL30.04.201822.05.2018PRODUCTIONOIL28.01.202106.02.2021PRODUCTIONOIL05.12.201523.01.2016PRODUCTIONOIL24.01.201629.01.2016PRODUCTIONOIL01.12.201523.12.2015PRODUCTIONOIL11.05.201414.11.2014PRODUCTIONOIL27.03.202413.04.2024PRODUCTION05.08.202130.08.2021PRODUCTIONOIL31.05.201427.10.2014PRODUCTIONOIL05.04.201407.05.2014PRODUCTIONOIL22.11.201430.11.2014PRODUCTIONOIL05.07.202213.07.2022PRODUCTIONOIL06.04.201617.04.2016INJECTIONGAS04.07.201416.01.2015INJECTIONGAS02.08.201428.09.2014INJECTIONGAS26.02.202109.03.2021INJECTIONWATER15.02.201607.03.2016INJECTIONWATER12.02.201628.02.2016INJECTIONWATER19.01.201305.03.2013OBSERVATIONWATER26.05.201310.06.2013INJECTIONWATER28.07.201713.08.2017INJECTIONWATER30.01.201329.03.2013INJECTIONWATER26.01.201312.05.2013INJECTIONWATER30.04.201627.05.2016PRODUCTIONOIL16.02.201509.05.2015PRODUCTIONOIL18.02.201529.03.2015PRODUCTIONOIL09.06.201807.07.2018PRODUCTIONOIL08.02.201416.03.2014INJECTIONGAS28.03.201721.04.2017INJECTIONWATER -
Wellbores – other
Wellbores – other Wellbore nameEntered dateCompleted datePurposeStatus13.06.201015.06.2010STRATIGRAPHICP&A11.06.201013.06.2010STRATIGRAPHICP&A15.06.201017.06.2010STRATIGRAPHICP&A17.06.201018.06.2010STRATIGRAPHICP&A19.10.201221.10.2012SHALLOW GASP&A18.06.201321.06.2013SHALLOW GASP&A18.06.201020.06.2010SOIL DRILLINGP&A