Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
05.11.2024 - 01:27
Time of last synchronization with Norwegian Offshore Directorate's internal systems

SOLVEIG

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Field name
    Official field name
    SOLVEIG
    Factmaps in new window
    Current activity status
    Current activity status of the field. Example of legal values: SHUT DOWN, PRODUCING, PDO APPROVED
    Producing
    Discovery wellbore
    Name of the wellbore which proved the field.
    Discovery year.
    The year the field was discovered
    2013
    Main area
    Main NCS area. Example of legal values: NORTH SEA, NORWEGIAN SEA, BARENTS SEA
    North sea
    Main supply base
    Main supply base
    Tananger
    NPDID field
    Norwegian Offshore Directorate's unique id for fields
    34833011
  • Picture

    Picture
    SOLVEIG Field
    Picture not available
  • Discoveries included

    Discoveries included
    Discovery name
  • Activity status — history

    Activity status — history
    Status
    Status from
    Status to
    Producing
    29.09.2021
    Approved for production
    26.06.2019
    28.09.2021
  • Located in

    Located in
    Block name
    Prod. licence
    16/4
  • PDO – Plan for Development and Operations

    PDO – Plan for Development and Operations
    Date PDO approved
    Description
    Type
    28.06.2023
    Godkjent av OED
    PDO Exemption
    26.06.2019
    Godkjent av OED
    PDO
  • Ownership — full history

    Ownership — full history
    Owner kind
    Owner name
    Ownership from date
    Ownership to date
    PRODUCTION LICENSE
    26.06.2019
  • Operatorship — full history

    Operatorship — full history
    Company name
    Operatorship from
    Operatorship to
    01.01.2023
    30.06.2022
    31.12.2022
    01.04.2020
    29.06.2022
    26.06.2019
    31.03.2020
  • Licensees — full history

    Licensees — full history
    Company name
    Nation code
    Company share [%]
    Date licensee from
    Date licensee to
    NO
    65.000000
    01.01.2023
    NO
    20.000000
    01.01.2023
    NO
    15.000000
    01.01.2023
    NO
    65.000000
    30.06.2022
    31.12.2022
    NO
    20.000000
    30.06.2022
    31.12.2022
    NO
    15.000000
    30.06.2022
    31.12.2022
    NO
    65.000000
    01.04.2020
    29.06.2022
    NO
    20.000000
    01.04.2020
    29.06.2022
    NO
    15.000000
    01.04.2020
    29.06.2022
    NO
    65.000000
    13.11.2019
    31.03.2020
    NO
    20.000000
    13.11.2019
    31.03.2020
    NO
    15.000000
    13.11.2019
    31.03.2020
    NO
    65.000000
    26.06.2019
    12.11.2019
    NO
    20.000000
    26.06.2019
    12.11.2019
    NO
    15.000000
    26.06.2019
    12.11.2019
  • Norwegian Offshore Directorate – estimate for reserves (Norwegian share)

    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Valid date:
    31.12.2023
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. recoverable oil
    [mill Sm3]
    Orig. recoverable gas
    [bill Sm3]
    Orig. recoverable NGL
    [mill tonn]
    Orig. recoverable cond.
    [mill Sm3]
    Orig. recoverable oil eq.
    [mill Sm3 o.e]
    12.41
    2.43
    0.93
    0.00
    16.61
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Orig. inplace oil
    [mill Sm3]
    Orig. inplace ass. liquid
    [mill Sm3]
    Orig. inplace ass. gas
    [bill Sm3]
    Orig. inplace free gas
    [bill Sm3]
    40.00
    0.00
    6.00
    2.00
    Norwegian Offshore Directorate – estimate for reserves (Norwegian share)
    Remaining oil
    [mill Sm3]
    Remaining gas
    [bill Sm3]
    Remaining NGL
    [mill tonn]
    Remaining cond.
    [mill Sm3]
    Remaining oil eq.
    [mill Sm3 o.e]
    10.99
    2.14
    0.81
    0.00
    14.67
  • Description

    Description
    Type
    Text
    Date updated
    Development
    Solveig is a field in the North Sea, 15 kilometres south of the Edvard Grieg field. The water depth is 100 metres. Solveig was discovered in 2013, and subsequently delineated by appraisal wells in 2014, 2015 and 2018. The plan for development and operation (PDO) was approved in 2019. Solveig was originally developed with five single wells, tied-back to the Edvard Grieg field. The production started in 2021. A PDO exemption for a Phase 2 development was granted in 2023.
    14.12.2023
    Reservoir
    Solveig produces oil from sandstone and conglomerate of Triassic and presumably Devonian age. The main reservoir was formed in small basins along the southwestern flank of the South Utsira High. The reservoir contains oil with a small gas cap at a depth of 1900 metres and has varying quality.
    14.12.2023
    Recovery strategy
    The field is produced by pressure support from water injection.
    28.02.2023
    Transport
    The well stream is transported via the Edvard Grieg field and onward by pipeline to the Sture terminal. The gas is exported via the Scottish Area Gas Evacuation (SAGE) infrastructure to the St Fergus terminal in the UK.
    28.02.2023
    Status
    Solveig Phase 2, which includes installation of two new subsea templates, is under development.
    14.12.2023
  • Investments (expected)

    Investments (expected)
    The operator's future investments related to the reserves from 2023 [mill NOK 2023-kroner]. The stated investment estimate has not been corrected for possible investment sharing.
    7174
  • Investments (historical)

    Investments (historical)
    Investments
    [mill NOK nominal values]
    Sum
    6326
    2022
    612
    2021
    2516
    2020
    1747
    2019
    1438
    2018
    13
  • Production , saleable

    Production , saleable
    Month
    Net - oil
    [mill Sm3]
    Net - gas
    [bill Sm3]
    Net - condensate
    [mill Sm3]
    Net - NGL
    [mill Sm3]
    Net - oil equivalents
    [mill Sm3]
    Sum
    2.242473
    0.379822
    0.000000
    0.290406
    2.912701
    2024
    0.742038
    0.118942
    0.000000
    0.085677
    0.946657
    2023
    0.984905
    0.156260
    0.000000
    0.124778
    1.265943
    2022
    0.431954
    0.088890
    0.000000
    0.070951
    0.591795
    2021
    0.083576
    0.015730
    0.000000
    0.009000
    0.108306
  • Production , sum wellbores

    Production , sum wellbores
    Month
    Gross - oil
    [mill Sm3]
    Gross - gas
    [bill Sm3]
    Gross - condensate
    [mill Sm3]
    Gross - oil equivalents
    [mill Sm3]
    Sum
    2.290010
    0.481786
    0.000000
    2.771796
    2024
    0.759523
    0.148065
    0.000000
    0.907588
    2023
    0.999611
    0.199819
    0.000000
    1.199430
    2022
    0.441154
    0.112562
    0.000000
    0.553716
    2021
    0.089722
    0.021340
    0.000000
    0.111062
  • Production – charts

    Production – charts
    Graph Net oe
    Production – charts
    Graph Net oil
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net gas
    Production – charts
    Graph Net NGL
    Production – charts
    Graph Water
    Any produced water is only included after 1.1.2000
  • Wellbores – exploration

    Wellbores – exploration
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    Content
    11.03.2013
    03.05.2013
    WILDCAT
    P&A
    OIL/GAS
    19.06.2014
    26.08.2014
    APPRAISAL
    P&A
    OIL/GAS
    14.06.2015
    16.08.2015
    APPRAISAL
    P&A
    OIL
    07.02.2018
    01.04.2018
    APPRAISAL
    P&A
    OIL
    12.02.2021
    10.04.2021
    WILDCAT
    P&A
    OIL
    11.11.2013
    29.12.2013
    APPRAISAL
    P&A
    SHOWS
  • Wellbores – development

    Wellbores – development
    Wellbore name
    Entered date
    Completed date
    Purpose
    Content
    27.05.2021
    28.06.2021
    OBSERVATION
    NOT APPLICABLE
    29.06.2021
    15.07.2021
    PRODUCTION
    OIL
    21.09.2021
    11.10.2021
    OBSERVATION
    NOT APPLICABLE
    13.10.2021
    03.11.2021
    PRODUCTION
    OIL
    15.08.2021
    07.09.2021
    PRODUCTION
    OIL
    01.01.2022
    12.02.2022
    INJECTION
    WATER
    20.11.2021
    20.12.2021
    INJECTION
    WATER
  • Wellbores – other

    Wellbores – other
    Wellbore name
    Entered date
    Completed date
    Purpose
    Status
    SHALLOW GAS
    SHALLOW GAS