25/2-5
Eksport: PDF
-
Generell informasjon
-
Brønnhistorie
Well 25/2-5 is located on the north-west rim of the Stord Basin and to the north of the main part of the Utsira High in the North Sea. The main target was Jurassic sandstones, which appeared promising after the discovery made in well 25/2-4 where Mid Jurassic (Dogger) sandstones were found to be hydrocarbon bearing, and also after the positive results of 25/4-1.Operations and resultsWildcat well 25/2-5 was spudded with the semi-submersible installation Polyglomar Driller on 8 March 1976 and drilled to TD at 4000 m in the Triassic Smith Bank Formation.As anticipated, good reservoirs were encountered in the early Tertiary, but without any shows (no structural closure) Jurassic sandstones present two main reservoirs: The upper reservoir "Brent sands" (3336 - 3489 m) was oil bearing in 3 zones (3339 m - 3388.5 m, 3448.5 - 3481 m, and 3487 - 3489 m), with a net oil pay of 40 m. Tests of the upper Brent showed a good productivity. The lower reservoir "Statfjord sands" (3652 - 3847 m) was oil bearing in two zones (3652 - 3692 m and 3706 - 3763 m), with a net oil pay of 44.5 m, but with lower porosities than in the "Brent sands". The pressure of the Jurassic reservoir was hydrostatic (equivalent density = 1.08).Five cores were cut in the Vestland Group. Four were cut from 3339.5 to 3372 m in the Hugin Formation and one was cut from 3476 to 3485 m in the Sleipner Formation. Ten FIT tests were carried out in the Vestland Group sands. Five were carried out while drilling from 3354 to 3384 m. Of these, oil was recovered in two FITs at 3357.2 and 3382.5 m (density = 0.804 g/cm3 = 44 deg API). The others were unsuccessful. Another five FITS were carried out during DST3. Of these, oil was recovered in FIT no 15 at 3383.8 m and gas in the 4 others. Nine FITs were carried out in the Statfjord Formation. None of these recovered any oil or gas.The well was permanently abandoned on 4 August as an oil and gas discovery.TestingThree drill stem tests were made.DST 1 from 3692 - 3695 m (Statfjord Formation) gave no flow.DST 2 from 3652 - 3695 m (Statfjord Formation) flowed 47700 Sm3 gas and 229 Sm3 oil /day through a 0.5 inch choke. The GOR was 208 Sm3/Sm3.DST 3 from 3337 - 3362 m (Vestland Group) flowed 95399 Sm3 gas and 470 sm3 oil /day through a 0.5 inch choke. The GOR was 203 Sm3/Sm3 and the oil density was 0.813 g/cm3. -
Borekaks i Sokkeldirektoratet
Borekaks i Sokkeldirektoratet Borekaks tilgjengelig for prøvetaking?YESBorekaks i Sokkeldirektoratet Borekaksprøve, topp dybde [m]Borekaksprøve, bunn dybde [m]200.004000.00 -
Borekjerner i Sokkeldirektoratet
Borekjerner i Sokkeldirektoratet Kjerneprøve nummerKjerneprøve - topp dybdeKjerneprøve - bunn dybdeKjerneprøve dybde - enhet13339.53340.0[m ]23350.03352.0[m ]33354.03362.0[m ]43363.03372.0[m ]53476.03484.7[m ]Borekjerner i Sokkeldirektoratet Total kjerneprøve lengde [m]28.2Borekjerner i Sokkeldirektoratet Kjerner tilgjengelig for prøvetaking?YES -
Foringsrør og formasjonsstyrketester
Foringsrør og formasjonsstyrketester Type utforingUtforing diam.
[tommer]Utforing dybde
[m]Brønnbane diam.
[tommer]Brønnbane dyp
[m]LOT/FIT slam eqv.
[g/cm3]Type formasjonstestCONDUCTOR30193.036195.00.00LOTSURF.COND.13 3/82860.017 1/22873.00.00LOTINTERM.9 5/83300.012 1/83313.00.00LOTLINER73577.08 1/23580.00.00LOT -
Borestrengtester (DST)
Borestrengtester (DST) Test nummerFra dybde MD
[m]Til dybde MD
[m]Reduksjonsventil størrelse
[mm]1.0369236950.02.03652369519.03.03337336212.5Borestrengtester (DST) Test nummerEndelig avstengningstrykk
[MPa]Endelig strømningstrykk
[MPa]Bunnhullstrykk
[MPa]Borehullstemperatur
[°C]1.02.03.0Borestrengtester (DST) Test nummerOlje produksjon
[Sm3/dag]Gass produksjon
[Sm3/dag]Oljetetthet
[g/cm3]Gasstyngde rel. luftGOR
[m3/m3]1.02.03301080003273.0470954000.813203 -
Logger
Logger Type loggTopp dyp for logg [m]Bunn dyp for logg [m]BHC GR193715CBL14913705DEV6992000DLL33003994FDC CNL33004001GR CLL32023705HDT20004000HRT1432600ISF GR SL6994001ML MLL29994001SS1503893 -
Litostratigrafi
Litostratigrafi Topp Dyb [mMD RKB]Litostrat. enhet141458105511581167215521552238237425082660270227022990315832403259329232923302330233163336333634073489348935133605365238473847 -
Geokjemisk informasjon
-
Dokumenter – rapportert av utvinningstillatelsen (frigitt ihht til regelverk)
Dokumenter – rapportert av utvinningstillatelsen (frigitt ihht til regelverk) Dokument navnDokument formatDokumentstørrelse [MB]pdf8.84 -
Dokumenter – eldre Sokkeldirektoratets WDSS rapporter og andre relaterte dokumenter
Dokumenter – eldre Sokkeldirektoratets WDSS rapporter og andre relaterte dokumenter Dokument navnDokument formatDokumentstørrelse [MB]pdf0.39 -
Tynnslip i Sokkeldirektoratet
Tynnslip i Sokkeldirektoratet DybdeEnhet3385.00[m ]3384.00[m ]