34/10-7 R

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Wellbore name
    Official name of wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    34/10-7 R
    Type
    Wellbore type. Legal values: EXPLORATION, DEVELOPMENT, OTHER (see 'Purpose' for more information)
    EXPLORATION
    Purpose
    Final classification of the wellbore.

    Legal values for exploration wellbores:
    WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS.

    Legal values for development wellbores:
    OBSERVATION, PRODUCTION, INJECTION, INJECTION-CCS, OBSERVATION-CCS.

    Legal values for other wellbores:
    SOIL DRILLING (drilling in connection with track surveys and other subsurface surveys to investigate the soil conditions prior to placement of facilities),
    SHALLOW GAS (drilling to investigate shallow gas before the first 'real' drilling on the location),
    PILOT (drilling to investigate the geology and fluid connectors for location of the main wellbore),
    SCIENTIFIC (drilling according to Law of Scientific research and exploration),
    STRATIGRAPHIC (driling according to Law of Petroleum activities §2-1).
    APPRAISAL
    Status
    Status for the wellbore. Legal values are:

    BLOWOUT: A blowout has occurred in the well.
    CLOSED: A development wellbore that has been closed in a shorter or longer periode. Also applies to development wellbores where drilling is completed, but production/injection has not yet been reported.
    DRILLING: The well is in the drilling phase - can be active drilling, logging, testing or plugging,
    JUNKED: The drilling operation has been terminated due to technical problems.
    P&A: Exploration: The well is plugged and abandoned, and can not be reentered for further use. Development wells: The production/injection from/to the well is stopped and the well is plugged. The wellhead is removed or else made unavailable for further well operations.
    PLUGGED: The wellbore has been plugged, but the upper parts of the wellbore can be re-used. A sidetrack might be drilled at a later stage.
    PRODUCING: It was produced from the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    INJECTING: It was injected to the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    PREDRILLED: The upper part of the well has been drilled, usually as part of a batch-drilling campaign covering several wellbores.
    RE-CLASS TO DEV: Exploration wellbore that is reclassified to a development wellbore.
    RE-CLASS TO TEST: Exploration wellbore that is reclassified to test production.
    SUSPENDED: The drilling operation in the wellbore has been temporarily stopped. The current plan is to continue drilling later on.
    P&A
    Factmaps in new window
    Main area
    Name of the area on the Norwegian Continental Shelf where the wellbore is located. Legal values: BARENTS SEA, NORWEGIAN SEA, NORTH SEA.
    NORTH SEA
    Field
    Name of the field the wellbore is related to.
    Discovery
    Name of the discovery the wellbore is related to.
    Well name
    Official name of the parent well for the wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    34/10-7
    Seismic location
    Position of spud location on seismic survey lines. SP: shotpoint.
    S 30 - 180 SP. 328
    Production licence
    Official designation of the production licence the wellbore was drilled or planned to be drilled from ( well head posistion).
    Drilling operator
    Name of the licensee starting the drilling operation on behalf of the active production license (well head position). This will usually equal the operator of the production license.
    Den norske stats oljeselskap a.s
    Drill permit
    The drilling permit number together with the version of the drilling permit as stated in the drilling permit granted by the Norwegian Offshore Directorate.
    237-L2
    Drilling facility
    Norwegian Offshore Directorate's name of the facility which the wellbore was drilled from.
    Drilling days
    Number of days from wellbore entry to wellbore completion.
    45
    Entered date
    The date when he wellbore was spudded. For sidetracks: The date when new formation was drilled by kicking off from the mother-wellbore,
    31.05.1983
    Completed date
    Exploration wellbores from moveable facilities:
    For floating facilities - date when anchor handling is started. For jackups - date the jacking-down started. Exploration wellbores from fixed facilities and all development wellbores:
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    14.07.1983
    Plugged and abondon date
    Date when the P&A-operations of the wellbore was finished, as reported by the operator to the Norwegian Offshore Directorate throught DDRS (Daily Drilling Reporting System). Only applied once pr. wellhead/surface location.
    14.07.1983
    Release date
    Date when raw data which has been reported to the authorities from the wellbore is not confidential any longer. Normally 2 years after finishing the drilling. May be earlier if the area of the production license is relinquished.
    14.07.1985
    Publication date
    Date quality control of the wellbore information was completed, so it can be published on the internet as a 'Well Data Summary Sheet' wellbore with more information available than other wellbores.
    14.11.2012
    Purpose - planned
    Pre-drill purpose of the wellbore. Legal values for exploration wellbores: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS. Example of legal values for development wellbores: OBSERVATION, PRODUCTION, INJECTION.
    APPRAISAL
    Reentry
    Status whether the wellbore has been re-entered (YES) or not (NO). Re-entered wellbores are not included in the count when wellbores are presented in statistical overviews.
    YES
    Reentry activity
    Reason for reentry of the wellbore. Only relevant for exploration wellbores. Example of legal values: DRILLING, DRILLING/PLUGGING, LOGGING, PLUGGING, TESTING, TESTING/PLUGGING.
    TESTING/PLUGGING
    Content
    For exploration wellbores, status of discovery.

    Legal values:
    DRY, SHOWS (trace amounts of hydrocarbons), GAS, GAS/CONDENSATE, OIL or OIL/GAS.
    SHOWS (GAS SHOWS, OIL SHOWS or OIL/GAS SHOWS) are detected as fluorescent cut (organic extract), petroleum odour, or visual stain on cuttings or cores, or as increased gas reading on the mud-loggers gas detection equipment.
    Legal values for WILDCAT-CCS and APPRAISAL-CCS: WATER

    For development wellbores, type of produced/injected fluid.
    Legal values:
    WATER, CUTTINGS, NOT AVAILABLE, OIL, GAS/CONDENSATE, OIL/GAS, CO2, GAS, WATER/GAS, NOT APPLICABLE.
    OIL
    Discovery wellbore
    Indicator which tells if the wellbore made a new discovery. Legal values: YES, NO. Prior to press-release or other information regarding drilling results, the indicator will be “NO” as a default.
    NO
    1st level with HC, age
    Age of lithostratigraphic unit, 1st level, where hydrocarbons were encountered. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EOCENE. See also Norwegian Offshore Directorate bulletins.
    EARLY JURASSIC
    1st level with HC, formation
    Name of lithostartigraphic unit, 1st level, where hydrocarbons were encountered. Shown only for released wells. Examples of legal values: BASEMENT, COOK FM, EKOFISK FM, HEIMDAL FM, SANDNES FM, SOGNEFJORD FM, TARBERT FM, BRENT GP. See also Norwegian Offshore Directorate bulletins.
    COOK FM
    2nd level with HC, age
    Age of lithostratigraphic unit, 2nd level, where hydrocarbons were encountered. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EOCENE.
    EARLY JURASSIC
    2nd level with HC, formation
    Name of lithostartigraphic unit, 2nd level, where hydrocarbons were encountered. Shown only for released wells. Examples of legal values: BASEMENT, COOK FM, EKOFISK FM, HEIMDAL FM, SANDNES FM, SOGNEFJORD FM, TARBERT FM, BRENT GP.
    STATFJORD GP
    Kelly bushing elevation [m]
    Elevation of the rotary kelly bushing (RKB) above mean sea level.
    22.0
    Water depth [m]
    Depth in metres betweem mean sea level and sea floor.
    204.0
    Total depth (MD) [m RKB]
    Total measured length of wellbore from kelly bushing to total depth (driller's depth).
    2247.0
    Final vertical depth (TVD) [m RKB]
    Vertical elevation from total depth to kelly bushing. Shown only for released wells. Referred to as true vertical depth (TVD).
    2247.0
    Maximum inclination [°]
    Maximum deviation, in degrees, from a vertical well path.Shown only for released wells.
    1.5
    Bottom hole temperature [°C]
    Estimated temperature at final total depth of the wellbore. Shown only for released wells. See discription.
    90
    Oldest penetrated age
    Age (according to Geologic Time Scale 2004 by F. M. Gradstein, et al. (2004)) of the oldest penetrated formation. May differ from age at TD for example in deviated wellbores. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EARLY PERMIAN, EARLY TRIASSIC, EOCENE.
    LATE TRIASSIC
    Oldest penetrated formation
    Name of the oldest lithostratigraphic unit penetrated by the wellbore. Shown only for released wells. In most wellbores this is formation or group at total depth. May differ from formation or group at TD for example in wellbores drilled with high deviation or through faults. Examples of legal values: AMUNDSEN FM, BALDER FM, BASEMENT, BLODØKS FM, BRYNE FM, BURTON FM, COOK FM, DRAKE FM, DRAUPNE FM, EKOFISK FM, DUNLIN GP.
    LUNDE FM
    Geodetic datum
    Reference system for coordinates. Example of legal values: ED50.
    ED50
    NS degrees
    Geographic coordinate of the wellhead, north-south degrees.
    61° 12' 13.44'' N
    EW degrees
    Geographic coordinate of the wellhead, east-west degrees.
    2° 16' 28.56'' E
    NS UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, north-south.
    6785858.02
    EW UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, east-west.
    461016.27
    UTM zone
    Universal Transverse Mercator zone. Examples of legal values: 31, 32, 33, 34.
    31
    NPDID wellbore
    Norwegian Offshore Directorate's unique id for the wellbore.
    496
  • Wellbore history

    General
    Well 34/10-7 R is a re-entry of well 34/10-7 on the eastern segment of the Gullfaks Field. Well 34/10-7 found oil in the Cook and Statfjord formations and performed a drill stem test from the Cook Formation. The objective of the re-entry was to perform two more drill stem tests in the main reservoir, the Cook Formation.
    Operations and results
    Well 34/10-7 was re-entered with the semi-submersible installation Ross Isle on 31 May 1983.
    No wire line fluid samples were taken. Cores were cut in the primary well bore.
    After testing the well was permanently abandoned on 14 July 1983 as an oil and gas appraisal well.
    Testing
    The Cook Formation was perforated and tested at two levels.
    DST 2 tested the interval 1833.4 to 1863.4 m. Towards the end of the main flow it produced 812 Sm3 oil and 99 000 Sm3 gas /day through a 40/64" choke. The GOR was 123 Sm3/Sm3, the oil density was 0.826 g/cm3 and the gas gravity was 0.68 (air = 1). The maximum temperature recorded at perforation depth was 76.2 deg C. After production testing DST 2 included also a seawater injection test and a seawater with surfactant injection test. Injection rates of up to 1600 m3/day of seawater were recorded during the final stages of the injection sequence. Due to fracturing of the reservoir during the first phase of injection no conclusions regarding the effects of the surfactant in the second phase could be made.
    DST 3 tested the interval 1807 to 1821 m. Towards the end of the main flow it produced 829 Sm3 oil and 110500 Sm3 gas /day through a 32/64" choke. The GOR was 133 Sm3/Sm3, the oil density was 0.829 g/cm3 and the gas gravity was 0.68 (air = 1). The maximum temperature recorded at perforation depth was 73.3 deg C.
  • Lithostratigraphy

  • Drill stem tests (DST)

    Drill stem tests (DST)
    Test number
    From depth MD
    [m]
    To depth MD
    [m]
    Choke size
    [mm]
    1.0
    1858
    1865
    15.9
    2.0
    1835
    1865
    15.9
    3.0
    1810
    1824
    12.7
    Drill stem tests (DST)
    Test number
    Final shut-in pressure
    [MPa]
    Final flow pressure
    [MPa]
    Bottom hole pressure
    [MPa]
    Downhole temperature
    [°C]
    1.0
    2.0
    3.0
    Drill stem tests (DST)
    Test number
    Oil
    [Sm3/day]
    Gas
    [Sm3/day]
    Oil density
    [g/cm3]
    Gas grav. rel.air
    GOR
    [m3/m3]
    1.0
    473
    59000
    0.832
    0.642
    124
    2.0
    810
    99000
    0.826
    0.680
    122
    3.0
    830
    110000
    0.830
    0.680
    133
  • Casing and leak–off tests

    Casing and leak–off tests
    Casing type
    Casing diam.
    [inch]
    Casing depth
    [m]
    Hole diam.
    [inch]
    Hole depth
    [m]
    LOT/FIT mud eqv.
    [g/cm3]
    Formation test type
    CONDUCTOR
    30
    291.0
    36
    292.0
    0.00
    LOT
    SURF.COND.
    20
    823.0
    26
    845.0
    1.51
    LOT
    LINER
    16
    1346.0
    19 1/2
    1415.0
    1.77
    LOT
    INTERM.
    13 3/8
    1565.0
    18
    1572.0
    1.90
    LOT
    INTERM.
    9 5/8
    1692.0
    12 1/4
    1700.0
    2.02
    LOT
    LINER
    7
    1977.0
    8 1/2
    1990.0
    2.05
    LOT
    OPEN HOLE
    2247.0
    6
    2247.0
    0.00
    LOT
  • Pressure plots

    Pressure plots
    The pore pressure data is sourced from well logs if no other source is specified. In some wells where pore pressure logs do not exist, information from Drill stem tests and kicks have been used. The data has been reported to the NPD, and further processed and quality controlled by IHS Markit.
    Pressure plots
    Document name
    Document format
    Document size [MB]
    PDF
    0.11