Factpages Norwegian Offshore Directorate
Factpages Norwegian Offshore Directorate
sodir.no          Norsk
13.11.2024 - 01:26
Time of last synchronization with Norwegian Offshore Directorate's internal systems

6706/12-1

Export: PDF icon PDF
  • General information

    General information
    Attribute Value
    Wellbore name
    Official name of wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    6706/12-1
    Type
    Wellbore type. Legal values: EXPLORATION, DEVELOPMENT, OTHER (see 'Purpose' for more information)
    EXPLORATION
    Purpose
    Final classification of the wellbore.

    Legal values for exploration wellbores:
    WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS.

    Legal values for development wellbores:
    OBSERVATION, PRODUCTION, INJECTION, INJECTION-CCS, OBSERVATION-CCS.

    Legal values for other wellbores:
    SOIL DRILLING (drilling in connection with track surveys and other subsurface surveys to investigate the soil conditions prior to placement of facilities),
    SHALLOW GAS (drilling to investigate shallow gas before the first 'real' drilling on the location),
    PILOT (drilling to investigate the geology and fluid connectors for location of the main wellbore),
    SCIENTIFIC (drilling according to Law of Scientific research and exploration),
    STRATIGRAPHIC (driling according to Law of Petroleum activities §2-1).
    WILDCAT
    Status
    Status for the wellbore. Legal values are:

    BLOWOUT: A blowout has occurred in the well.
    CLOSED: A development wellbore that has been closed in a shorter or longer periode. Also applies to development wellbores where drilling is completed, but production/injection has not yet been reported.
    DRILLING: The well is in the drilling phase - can be active drilling, logging, testing or plugging,
    JUNKED: The drilling operation has been terminated due to technical problems.
    P&A: Exploration: The well is plugged and abandoned, and can not be reentered for further use. Development wells: The production/injection from/to the well is stopped and the well is plugged. The wellhead is removed or else made unavailable for further well operations.
    PLUGGED: The wellbore has been plugged, but the upper parts of the wellbore can be re-used. A sidetrack might be drilled at a later stage.
    PRODUCING: It was produced from the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    INJECTING: It was injected to the wellbore at the time of the operators last monthly report to the Norwegian Offshore Directorate.
    PREDRILLED: The upper part of the well has been drilled, usually as part of a batch-drilling campaign covering several wellbores.
    RE-CLASS TO DEV: Exploration wellbore that is reclassified to a development wellbore.
    RE-CLASS TO TEST: Exploration wellbore that is reclassified to test production.
    SUSPENDED: The drilling operation in the wellbore has been temporarily stopped. The current plan is to continue drilling later on.
    P&A
    Press release
    Factmaps in new window
    Main area
    Name of the area on the Norwegian Continental Shelf where the wellbore is located. Legal values: BARENTS SEA, NORWEGIAN SEA, NORTH SEA.
    NORWEGIAN SEA
    Field
    Name of the field the wellbore is related to.
    Discovery
    Name of the discovery the wellbore is related to.
    Well name
    Official name of the parent well for the wellbore based on Norwegian Offshore Directorate guidelines for designation of wells and wellbores.
    6706/12-1
    Seismic location
    Position of spud location on seismic survey lines. SP: shotpoint.
    BPN9601STR07-inline:2392 & crossline 2341
    Production licence
    Official designation of the production licence the wellbore was drilled or planned to be drilled from ( well head posistion).
    Drilling operator
    Name of the licensee starting the drilling operation on behalf of the active production license (well head position). This will usually equal the operator of the production license.
    StatoilHydro ASA
    Drill permit
    The drilling permit number together with the version of the drilling permit as stated in the drilling permit granted by the Norwegian Offshore Directorate.
    1189-L
    Drilling facility
    Norwegian Offshore Directorate's name of the facility which the wellbore was drilled from.
    Drilling days
    Number of days from wellbore entry to wellbore completion.
    48
    Entered date
    The date when he wellbore was spudded. For sidetracks: The date when new formation was drilled by kicking off from the mother-wellbore,
    12.07.2008
    Completed date
    Exploration wellbores from moveable facilities:
    For floating facilities - date when anchor handling is started. For jackups - date the jacking-down started. Exploration wellbores from fixed facilities and all development wellbores:
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    Date when the wellbore is at total depth, and last casing, liner or screen is set. In case of immediate plugging of the wellbore, completed date equals the date the last plug i set in the wellbore.
    28.08.2008
    Release date
    Date when raw data which has been reported to the authorities from the wellbore is not confidential any longer. Normally 2 years after finishing the drilling. May be earlier if the area of the production license is relinquished.
    28.08.2010
    Publication date
    Date quality control of the wellbore information was completed, so it can be published on the internet as a 'Well Data Summary Sheet' wellbore with more information available than other wellbores.
    28.08.2010
    Purpose - planned
    Pre-drill purpose of the wellbore. Legal values for exploration wellbores: WILDCAT, APPRAISAL, WILDCAT-CCS, APPRAISAL-CCS. Example of legal values for development wellbores: OBSERVATION, PRODUCTION, INJECTION.
    WILDCAT
    Reentry
    Status whether the wellbore has been re-entered (YES) or not (NO). Re-entered wellbores are not included in the count when wellbores are presented in statistical overviews.
    NO
    Content
    For exploration wellbores, status of discovery.

    Legal values:
    DRY, SHOWS (trace amounts of hydrocarbons), GAS, GAS/CONDENSATE, OIL or OIL/GAS.
    SHOWS (GAS SHOWS, OIL SHOWS or OIL/GAS SHOWS) are detected as fluorescent cut (organic extract), petroleum odour, or visual stain on cuttings or cores, or as increased gas reading on the mud-loggers gas detection equipment.
    Legal values for WILDCAT-CCS and APPRAISAL-CCS: WATER

    For development wellbores, type of produced/injected fluid.
    Legal values:
    WATER, CUTTINGS, NOT AVAILABLE, OIL, GAS/CONDENSATE, OIL/GAS, CO2, GAS, WATER/GAS, NOT APPLICABLE.
    GAS
    Discovery wellbore
    Indicator which tells if the wellbore made a new discovery. Legal values: YES, NO. Prior to press-release or other information regarding drilling results, the indicator will be “NO” as a default.
    YES
    1st level with HC, age
    Age of lithostratigraphic unit, 1st level, where hydrocarbons were encountered. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EOCENE. See also Norwegian Offshore Directorate bulletins.
    LATE CRETACEOUS
    1st level with HC, formation
    Name of lithostartigraphic unit, 1st level, where hydrocarbons were encountered. Shown only for released wells. Examples of legal values: BASEMENT, COOK FM, EKOFISK FM, HEIMDAL FM, SANDNES FM, SOGNEFJORD FM, TARBERT FM, BRENT GP. See also Norwegian Offshore Directorate bulletins.
    NISE FM
    Kelly bushing elevation [m]
    Elevation of the rotary kelly bushing (RKB) above mean sea level.
    23.5
    Water depth [m]
    Depth in metres betweem mean sea level and sea floor.
    1262.0
    Total depth (MD) [m RKB]
    Total measured length of wellbore from kelly bushing to total depth (driller's depth).
    3950.0
    Final vertical depth (TVD) [m RKB]
    Vertical elevation from total depth to kelly bushing. Shown only for released wells. Referred to as true vertical depth (TVD).
    3949.0
    Bottom hole temperature [°C]
    Estimated temperature at final total depth of the wellbore. Shown only for released wells. See discription.
    91
    Oldest penetrated age
    Age (according to Geologic Time Scale 2004 by F. M. Gradstein, et al. (2004)) of the oldest penetrated formation. May differ from age at TD for example in deviated wellbores. Examples of legal values: CRETACEOUS, EARLY CRETACEOUS, LATE JURASSIC, EARLY PERMIAN, EARLY TRIASSIC, EOCENE.
    LATE CRETACEOUS
    Oldest penetrated formation
    Name of the oldest lithostratigraphic unit penetrated by the wellbore. Shown only for released wells. In most wellbores this is formation or group at total depth. May differ from formation or group at TD for example in wellbores drilled with high deviation or through faults. Examples of legal values: AMUNDSEN FM, BALDER FM, BASEMENT, BLODØKS FM, BRYNE FM, BURTON FM, COOK FM, DRAKE FM, DRAUPNE FM, EKOFISK FM, DUNLIN GP.
    KVITNOS FM
    Geodetic datum
    Reference system for coordinates. Example of legal values: ED50.
    ED50
    NS degrees
    Geographic coordinate of the wellhead, north-south degrees.
    67° 2' 43.3'' N
    EW degrees
    Geographic coordinate of the wellhead, east-west degrees.
    6° 52' 37.6'' E
    NS UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, north-south.
    7438203.84
    EW UTM [m]
    Universal Transverse Mercator coordinate of the wellhead, east-west.
    407619.33
    UTM zone
    Universal Transverse Mercator zone. Examples of legal values: 31, 32, 33, 34.
    32
    NPDID wellbore
    Norwegian Offshore Directorate's unique id for the wellbore.
    5867
  • Wellbore history

    General
    Well 6706/12-1 was drilled in 1262 m water depth on the Nyk High in the Norwegian Sea. The primary objective was to prove presence of hydrocarbons in the Snefrid South prospect within the Nise 1 Formation and confirm reservoir quality and production properties as input to DG1 for the Luva field development. Sandstones within the Campanian Upper Nise 1 Formation were primary target and lower Nise 1 in addition to Nise 2 Formation was the secondary target.
    Operations and results
    Wildcat well 6706/12-1 was spudded with the semi-submersible installation Transocean Leader on 12 July 2008 and drilled to TD at 3950 m in the Late Cretaceous Kvitnos Formation. A 12 1/4" pilot hole was drilled to 2034 m, primarily for data acquisition purposes, but also to check for shallow water flow. Operations proceeded without significant problems, although some tight spots were experienced at 2034 m and in 8 1/2" section interval from 3408 to 3186 m. No shallow gas or shallow water flow was observed by the ROV at the wellhead or on the MWD logs while drilling the well. The well was drilled with seawater/spud mud/Glydril down to 2034 m, and with Ultradril mud containing 18-20% monoethylene glycol (MEG) from 2034 m to TD.
    The well penetrated rocks of Quaternary, Tertiary, and late Cretaceous age. The well penetrated the Nise reservoir sand section at 2625 m, which was 13 m shallower than prognosed. The secondary target, Kvitnos Formation (Biostratigraphic dates proved the pre-drill "Nise 2" to be the Kvitnos Formation) was penetrated at 3516.5 m, which was 30.5 m shallower than prognosed. Dry gas was proven in the Nise Formation with 70 m of good quality reservoir. The gas - water contact was found at 2695 m, with a net to gross ratio of 77%, total porosity of 29% and Hydrocarbon saturation of 80%. The Kvitnos Formation was dry and with limited reservoir quality. No oil shows were recorded in the well.
    Five cores of 18 m each were cut in the Nise reservoir from 2628 to 2714.5 m, with good recovery. One core of 27 m length was successfully cut in the Kvitnos Formation. Wire line samples were taken at 2625.6 m (gas) and at 2701.4 m (water) in the Nise Formation Formation. The gas samples were taken with a very low pressure draw-down, and were expected to be of good quality.
    The well was permanently abandoned on 28 August 2008 as a gas discovery.
    Testing
    No drill stem test was performed.
  • Cuttings at the Norwegian Offshore Directorate

    Cuttings at the Norwegian Offshore Directorate
    Cuttings available for sampling?
    YES
    Cuttings at the Norwegian Offshore Directorate
    Cutting sample, top depth [m]
    Cutting samples, bottom depth [m]
    2040.00
    3950.00
  • Cores at the Norwegian Offshore Directorate

    Cores at the Norwegian Offshore Directorate
    Core sample number
    Core sample - top depth
    Core sample - bottom depth
    Core sample depth - uom
    1
    2628.0
    2645.0
    [m ]
    2
    2646.0
    2664.0
    [m ]
    3
    2664.0
    2682.2
    [m ]
    4
    2682.2
    2699.8
    [m ]
    5
    2700.0
    2713.3
    [m ]
    6
    3534.0
    3560.9
    [m ]
    Cores at the Norwegian Offshore Directorate
    Total core sample length [m]
    111.0
    Cores at the Norwegian Offshore Directorate
    Cores available for sampling?
    YES
  • Lithostratigraphy

    Lithostratigraphy
    Top depth [mMD RKB]
    Lithostrat. unit
    1286
    1286
    2119
    2213
    2213
    2368
    2368
    2427
    2427
    2590
    3517
  • Composite logs

    Composite logs
    Document name
    Document format
    Document size [MB]
    pdf
    0.60
  • Geochemical information

    Geochemical information
    Document name
    Document format
    Document size [MB]
    txt
    0.00
    txt
    0.12
  • Logs

    Logs
    Log type
    Log top depth [m]
    Log bottom depth [m]
    CMR GR
    2620
    2710
    FMI DSI GR
    2542
    3945
    MDT GR
    2625
    3915
    MWD - ARCVRES6 TELE
    2570
    3950
    MWD - ARCVRES8 GVR8 PP
    2037
    2580
    MWD - ARCVRES8 VADN8 VSON8 PP
    1379
    2034
    MWD - ARCVRES9 PP
    1379
    2034
    MWD - PP
    1285
    1379
    PEX HRLA DSI
    2024
    2567
    PEX HRLA ECS HNGS EDTC
    2385
    3945
    VSP GR
    2010
    3900
  • Casing and leak–off tests

    Casing and leak–off tests
    Casing type
    Casing diam.
    [inch]
    Casing depth
    [m]
    Hole diam.
    [inch]
    Hole depth
    [m]
    LOT/FIT mud eqv.
    [g/cm3]
    Formation test type
    CONDUCTOR
    30
    1376.0
    36
    1379.0
    0.00
    LOT
    SURF.COND.
    20
    2024.0
    26
    2034.0
    1.39
    LOT
    PILOT HOLE
    2034.0
    12 1/4
    2034.0
    0.00
    LOT
    INTERM.
    9 5/8
    2572.0
    12 1/4
    2583.0
    1.44
    LOT
    OPEN HOLE
    3950.0
    8 1/2
    3950.0
    0.00
    LOT
  • Drilling mud

    Drilling mud
    Depth MD [m]
    Mud weight [g/cm3]
    Visc. [mPa.s]
    Yield point [Pa]
    Mud type
    Date measured
    1379
    1.03
    spud mud
    2034
    1.03
    spud mud
    2583
    1.18
    Ultradril
    3950
    1.23
    Ultradril
  • Pressure plots

    Pressure plots
    The pore pressure data is sourced from well logs if no other source is specified. In some wells where pore pressure logs do not exist, information from Drill stem tests and kicks have been used. The data has been reported to the NPD, and further processed and quality controlled by IHS Markit.
    Pressure plots
    Document name
    Document format
    Document size [MB]
    pdf
    0.28