TORDIS
Export:
PDF

-
General information
-
Picture
-
Discoveries included
Discoveries included Discovery name -
Activity status — history
Activity status — history StatusStatus fromStatus toProducing03.06.1994Approved for production14.05.199102.06.1994 -
Located in
Located in Block nameProd. licence34/7 -
PDO – Plan for Development and Operations
PDO – Plan for Development and Operations Date PDO approvedDescriptionType16.12.2005Tordis IOR av Kongen i StatsrådPDO29.06.1999Borg PUD av Kongen i StatsrådPDO29.06.1999PUD-fritak 34/7-25 STUJPDO Exemption13.10.1995Tordis Øst av Kongen i StatsrådPDO14.05.1991Tordis i StortingetPDO -
Ownership — full history
Ownership — full history Owner kindOwner nameOwnership from dateOwnership to datePRODUCTION LICENSE14.05.1991 -
Operatorship — full history
Operatorship — full history Company nameOperatorship fromOperatorship to16.05.201801.11.200915.05.201801.01.200931.10.200901.10.200731.12.200801.01.200330.09.200711.01.200131.12.200214.05.199110.01.2001 -
Licensees — full history
Licensees — full history Company nameNation codeCompany share [%]Date licensee fromDate licensee toNO41.50000023.12.2024NO30.00000023.12.2024NO16.10000023.12.2024NO9.60000023.12.2024NO2.80000023.12.2024NO41.50000031.01.202222.12.2024NO30.00000031.01.202222.12.2024NO16.10000031.01.202222.12.2024NO9.60000031.01.202222.12.2024NO2.80000031.01.202222.12.2024NO41.50000028.01.202230.01.2022NO30.00000028.01.202230.01.2022NO16.10000028.01.202230.01.2022NO9.60000028.01.202230.01.2022NO2.80000028.01.202230.01.2022NO41.50000010.12.201927.01.2022NO30.00000010.12.201927.01.2022NO16.10000010.12.201927.01.2022NO9.60000010.12.201927.01.2022NO2.80000010.12.201927.01.2022NO41.50000013.11.201909.12.2019NO30.00000013.11.201909.12.2019NO16.10000013.11.201909.12.2019NO9.60000013.11.201909.12.2019NO2.80000013.11.201909.12.2019NO41.50000016.05.201812.11.2019NO30.00000016.05.201812.11.2019NO16.10000016.05.201812.11.2019NO9.60000016.05.201812.11.2019NO2.80000016.05.201812.11.2019NO41.50000013.03.201515.05.2018NO30.00000013.03.201515.05.2018NO16.10000013.03.201515.05.2018NO9.60000013.03.201515.05.2018NO2.80000013.03.201515.05.2018NO41.50000001.01.201212.03.2015NO30.00000001.01.201212.03.2015NO16.10000001.01.201212.03.2015NO9.60000001.01.201212.03.2015NO2.80000001.01.201212.03.2015NO41.50000002.11.200931.12.2011NO30.00000002.11.200931.12.2011NO10.50000002.11.200931.12.2011NO9.60000002.11.200931.12.2011NO5.60000002.11.200931.12.2011NO2.80000002.11.200931.12.2011NO41.50000001.01.200901.11.2009NO30.00000001.01.200901.11.2009NO10.50000001.01.200901.11.2009NO9.60000001.01.200901.11.2009NO5.60000001.01.200901.11.2009NO2.80000001.01.200901.11.2009NO30.00000001.10.200731.12.2008NO28.22000001.10.200731.12.2008NO13.28000001.10.200731.12.2008NO10.50000001.10.200731.12.2008NO9.60000001.10.200731.12.2008NO5.60000001.10.200731.12.2008NO2.80000001.10.200731.12.2008NO30.00000001.01.200730.09.2007NO28.22000001.01.200730.09.2007NO13.28000001.01.200730.09.2007NO10.50000001.01.200730.09.2007NO9.60000001.01.200730.09.2007NO5.60000001.01.200730.09.2007NO2.80000001.01.200730.09.2007NO30.00000001.10.200431.12.2006NO28.22000001.10.200431.12.2006NO13.28000001.10.200431.12.2006NO10.50000001.10.200431.12.2006NO9.60000001.10.200431.12.2006NO5.60000001.10.200431.12.2006NO2.80000001.10.200431.12.2006NO30.00000006.05.200330.09.2004NO28.22000006.05.200330.09.2004NO13.28000006.05.200330.09.2004NO10.50000006.05.200330.09.2004NO9.60000006.05.200330.09.2004NO5.60000006.05.200330.09.2004NO2.80000006.05.200330.09.2004NO30.00000017.06.200105.05.2003NO28.22000017.06.200105.05.2003NO13.28000017.06.200105.05.2003NO10.50000017.06.200105.05.2003NO9.60000017.06.200105.05.2003NO5.60000017.06.200105.05.2003NO2.80000017.06.200105.05.2003NO30.00000001.06.200116.06.2001NO28.22000001.06.200116.06.2001NO13.28000001.06.200116.06.2001NO10.50000001.06.200116.06.2001NO9.60000001.06.200116.06.2001NO5.60000001.06.200116.06.2001NO2.80000001.06.200116.06.2001NO51.00000010.05.200131.05.2001NO13.28000010.05.200131.05.2001NO10.50000010.05.200131.05.2001NO9.60000010.05.200131.05.2001NO7.22000010.05.200131.05.2001NO5.60000010.05.200131.05.2001NO2.80000010.05.200131.05.2001NO58.22000011.01.200109.05.2001NO13.28000011.01.200109.05.2001NO10.50000011.01.200109.05.2001NO9.60000011.01.200109.05.2001NO5.60000011.01.200109.05.2001NO2.80000011.01.200109.05.2001NO58.22000024.07.200010.01.2001NO10.50000024.07.200010.01.2001NO9.60000024.07.200010.01.2001NO8.40000024.07.200010.01.2001NO5.60000024.07.200010.01.2001NO4.88000024.07.200010.01.2001NO2.80000024.07.200010.01.2001NO58.22000011.12.199923.07.2000NO10.50000011.12.199923.07.2000NO9.60000011.12.199923.07.2000NO8.40000011.12.199923.07.2000NO5.60000011.12.199923.07.2000NO4.88000011.12.199923.07.2000NO2.80000011.12.199923.07.2000NO55.40000017.12.199810.12.1999NO10.50000017.12.199810.12.1999NO9.60000017.12.199810.12.1999NO8.40000017.12.199810.12.1999NO7.70000017.12.199810.12.1999NO5.60000017.12.199810.12.1999NO2.80000017.12.199810.12.1999NO55.40000009.05.199516.12.1998NO10.50000009.05.199516.12.1998NO9.60000009.05.199516.12.1998NO8.40000009.05.199516.12.1998NO7.70000009.05.199516.12.1998NO5.60000009.05.199516.12.1998NO2.80000009.05.199516.12.1998NO55.40000014.05.199108.05.1995NO10.50000014.05.199108.05.1995NO9.60000014.05.199108.05.1995NO8.40000014.05.199108.05.1995NO7.00000014.05.199108.05.1995NO5.60000014.05.199108.05.1995NO2.80000014.05.199108.05.1995NO0.70000014.05.199108.05.1995 -
Description
Description TypeTextDate updatedDevelopmentTordis is a field in the Tampen area in the northern part of the North Sea, between the Statfjord and Gullfaks fields. The water depth is 150-220 metres. Tordis was discovered in 1987, and the plan for development and operation (PDO) was approved in 1991. The field has been developed with a central subsea manifold tied-back to the Gullfaks C facility, which also supplies water for injection. Seven single-well satellites and two 4-slots subsea templates are tied-back to the manifold. The production started in 1994. Tordis comprises three structures: Tordis, Borg and Tordis Statfjord. The Tordis structure includes several substructures. The PDO for Tordis Øst was approved in 1995 and for Borg in 1999. An amended PDO for a Tordis IOR subsea separation facility was approved in 2005.14.12.2023ReservoirTordis produces oil from Jurassic sandstone. The reservoirs in Tordis are in the Middle Jurassic Brent Group and the Lower Jurassic Statfjord Group. The structures Tordis Øst and Sørøst also include reworked Brent Group sediments in the Upper Jurassic Draupne Formation. The Borg reservoir is in Upper Jurassic intra-Draupne Formation sandstone, and the reservoir in Tordis Statfjord is in the Lower Jurassic Statfjord Group. The reservoirs are at depths of 2000-2500 metres and the reservoir quality is good to excellent.14.12.2023Recovery strategyThe field is produced by pressure support from water injection and by natural aquifer drive.28.02.2023TransportThe well stream from Tordis is transported via two pipelines to the Gullfaks C facility for processing. The oil is exported by tankers, while the gas is exported via Gassled A to the Kårstø terminal.14.12.2023StatusThe production from Tordis is maintained through pressure support and well interventions. There are no unused slots, and new wells must therefore be drilled as sidetracks from existing wells. New well targets are being matured, and drilling of new wells is planned for 2025. New 4D seismic data will be acquired in 2025.21.01.2025 -
Investments (expected)
Investments (expected) The operator's future investments related to the reserves from 2024 [mill NOK 2024-kroner]. The stated investment estimate has not been corrected for possible investment sharing.4104 -
Investments (historical)
Investments (historical) Investments
[mill NOK nominal values]Sum1909120235420228120218192020343201954201861201746320169442015790201412802013804201211972011125020104752009593200810520071228200615032005191200423320031342002636200149620006121999640199823019971091996246199535819941346199310661992707199143 -
Production , saleable
Production , saleable MonthNet - oil
[mill Sm3]Net - gas
[bill Sm3]Net - condensate
[mill Sm3]Net - NGL
[mill Sm3]Net - oil equivalents
[mill Sm3]Sum66.8149804.9782040.0032313.59837575.3947900.0840070.0070190.0000000.0033990.0944250.6929620.0528580.0000000.0250970.7709170.9900860.0618340.0000000.0316891.0836091.3327570.0851160.0000000.0451361.4630091.0810260.0661670.0000000.0479771.1951700.6186840.0407600.0000000.0300140.6894580.7005890.3782580.0000000.3107891.3896360.9522260.0000000.0000000.0000000.9522261.2553440.0000000.0000000.0000001.2553441.4470610.0000000.0000000.0000001.4470611.1471400.0000000.0000000.0000001.1471400.7458800.0179940.0001860.0161510.7802110.5083750.0367790.0003170.0313210.5767920.2227550.0178800.0001010.0150310.2557670.5903110.4084650.0022520.3400651.3410930.7357840.0000000.0003600.0044780.7406221.0948610.0054570.0000150.0047161.1050491.6088040.0021830.0000000.0016821.6126692.4297930.0919720.0000000.0757432.5975081.6676020.1074050.0000000.0888601.8638673.0263230.2468650.0000000.1896943.4628823.6860260.2810830.0000000.2152714.1823804.1154850.3289490.0000000.2610424.7054764.6155250.3168960.0000000.3190435.2514644.7538850.3364920.0000000.3229125.4132893.9943160.3042980.0000000.1986954.4973094.4204960.3380930.0000000.2160764.9746653.9696520.3204500.0000000.1956994.4858014.1223340.3900580.0000000.1969094.7093014.5037430.3638660.0000000.1993995.0670084.1456860.2780340.0000000.1705714.5942911.5554620.0929730.0000000.0409161.689351 -
Production , sum wellbores
Production , sum wellbores MonthGross - oil
[mill Sm3]Gross - gas
[bill Sm3]Gross - condensate
[mill Sm3]Gross - oil equivalents
[mill Sm3]Sum66.6058247.2958330.00000073.9016570.0840170.0100340.0000000.0940510.6930330.0916880.0000000.7847210.9868310.1050820.0000001.0919131.3278480.1315420.0000001.4593901.0875680.1146990.0000001.2022670.6211600.0780960.0000000.6992560.7089700.0884770.0000000.7974470.9485300.1164870.0000001.0650171.2568650.1329160.0000001.3897811.4470610.1516940.0000001.5987551.1543640.1232260.0000001.2775900.7458200.0868850.0000000.8327050.5084940.0602190.0000000.5687130.2227320.0269600.0000000.2496920.5859480.0676250.0000000.6535730.7379420.0839960.0000000.8219381.0986150.1263560.0000001.2249711.6127990.1829590.0000001.7957582.4053030.2719480.0000002.6772511.6548100.1930170.0000001.8478273.0048790.3479890.0000003.3528683.6782020.4283920.0000004.1065944.1090800.4689270.0000004.5780074.5856600.5229830.0000005.1086434.7785890.5211240.0000005.2997134.1500640.4457240.0000004.5957884.4227260.4566880.0000004.8794143.9700110.4161040.0000004.3861154.1235490.4259590.0000004.5495084.5026910.4570510.0000004.9597423.8367750.4078530.0000004.2446281.5548880.1531330.0000001.708021 -
Production – charts
Production – charts Production – charts Production – charts Production – charts Production – charts Production – charts Any produced water is only included after 1.1.2000 -
Wellbores – exploration
Wellbores – exploration Wellbore nameEntered dateCompleted datePurposeStatusContent11.10.198717.12.1987WILDCATP&AOIL28.09.198902.12.1989APPRAISALP&AOIL20.07.199117.09.1991WILDCATP&AOIL19.10.199211.12.1992WILDCATP&AOIL15.12.199212.02.1993APPRAISALP&AOIL15.08.199301.10.1993WILDCATP&AOIL31.07.199614.09.1996WILDCATP&AOIL06.02.199826.02.1998APPRAISALRE-CLASS TO TESTOIL19.08.199713.09.1997APPRAISALSUSPENDEDDRY08.01.199802.02.1998APPRAISALPLUGGEDOIL26.05.199912.06.1999APPRAISALP&ADRY12.11.199902.12.1999APPRAISALP&ADRY -
Wellbores – development
Wellbores – development Wellbore nameEntered dateCompleted datePurposeStatusContent15.10.199319.12.1993PRODUCTIONCLOSEDOIL22.11.199412.02.1995OBSERVATIONPLUGGEDNOT APPLICABLE05.06.199524.06.1995PRODUCTIONPLUGGEDOIL27.12.201508.01.2016PRODUCTIONCLOSEDOIL26.12.199311.02.1994PRODUCTIONPLUGGEDOIL27.04.199601.07.1996OBSERVATIONPLUGGEDNOT APPLICABLE02.07.199604.07.1996PRODUCTIONPLUGGEDOIL23.03.201601.04.2016PRODUCTIONCLOSEDOIL21.10.199417.11.1994OBSERVATIONPLUGGEDNOT APPLICABLE07.09.199503.10.1995PRODUCTIONCLOSEDOIL03.08.199312.10.1993OBSERVATIONPLUGGEDNOT APPLICABLE20.06.199405.08.1994PRODUCTIONPLUGGEDOIL12.01.200109.03.2001PRODUCTIONPLUGGEDOIL27.08.201402.10.2014PRODUCTIONPRODUCINGOIL27.06.199931.08.1999INJECTIONPLUGGEDWATER16.05.202028.05.2020PRODUCTIONPRODUCINGOIL26.03.199921.04.1999INJECTIONINJECTINGWATER11.09.199830.10.1998PRODUCTIONPLUGGEDOIL15.04.200420.05.2004PRODUCTIONCLOSEDOIL19.10.200107.11.2001PRODUCTIONPLUGGEDOIL18.06.200615.08.2006PRODUCTIONPRODUCINGOIL06.02.199826.02.1998PRODUCTIONPLUGGEDOIL03.09.200220.09.2002PRODUCTIONPRODUCINGOIL17.08.200019.10.2000PRODUCTIONPLUGGEDOIL24.07.202109.08.2021PRODUCTIONPLUGGEDDRY10.08.202121.08.2021PRODUCTIONPRODUCINGOIL02.07.199719.07.1997OBSERVATIONP&ANOT APPLICABLE20.07.199709.08.1997OBSERVATIONP&ANOT APPLICABLE14.07.200204.12.2002INJECTIONINJECTINGWATER04.07.201303.08.2013INJECTIONINJECTINGWATER11.02.200212.04.2002INJECTIONPLUGGEDWATER29.11.201623.01.2017INJECTIONINJECTINGWATER19.03.200011.07.2000INJECTIONCLOSEDWATER14.05.200709.06.2007INJECTIONPLUGGEDWATER -
Wellbores – other