Export: PDF
-
General information (in Norwegian only)
General information (in Norwegian only) Tillatelse272 CGyldig fra dato11.03.2022Gyldig til dato31.12.2052NPDID for utvinningstillatelser38723889 -
Operatorship — current (in Norwegian only)
Operatorship — current (in Norwegian only) SelskapAker BP ASA -
Owner — current (in Norwegian only)
Owner — current (in Norwegian only) SelskapAndel [%]Equinor Energy AS50.00000Aker BP ASA50.00000 -
Mortgages from the Petroleum register – current (in Norwegian only)
Mortgages from the Petroleum register – current (in Norwegian only) Ingen heftelser registert. -
Notifications from the Petroleum register – full history (in Norwegian only)
Notifications from the Petroleum register – full history (in Norwegian only) Dokument nummerRegistreringsdatoUtdrag av dokumentType1678630.05.2022Tillatelsen er innført i petroleumsregisteretNy tillatelse1743202.12.2022Olje- og energidepartementet bekrefter i brev datert 30.11.2022 at initiell periode forlenges til 31.12.2023, jf. petroleumsloven § 3-9 første og andre ledd.Forlengelse av gyldighetsperiode1766702.02.2023Operatørskapet er overført fra Equinor AS til Aker BP ASA, i henhold til vedtaksbrev fra OED datert 15.12.2022, jf. petroleumsloven § 3-7 andre ledd.Operatørskifte1871502.10.2024Energidepartementet bekrefter i brev datert 01.10.2024 at konsesjonstiden forlenges til 31.12.2052, jf. petroleumsloven § 3-9 femte ledd.Forlengelse av gyldighetsperiode