Export:
PDF
PDF-
General information (in Norwegian only)
General information (in Norwegian only) Tillatelse1055 CGyldig fra dato11.03.2022Gyldig til dato13.08.2025NPDID for utvinningstillatelser38723925 -
Operatorship — current (in Norwegian only)
Operatorship — current (in Norwegian only) -
Owner — current (in Norwegian only)
Owner — current (in Norwegian only) SelskapAndel [%] -
Mortgages from the Petroleum register – current (in Norwegian only)
Mortgages from the Petroleum register – current (in Norwegian only) Ingen heftelser registert. -
Notifications from the Petroleum register – full history (in Norwegian only)
Notifications from the Petroleum register – full history (in Norwegian only) Dokument nummerRegistreringsdatoUtdrag av dokumentType1680230.05.2022Tillatelsen er innført i petroleumsregisteretNy tillatelse1744507.12.2022Olje- og energidepartementet bekrefter i brev datert 7.12.2022 at initiell periode forlenges til 14.2.2028, jf. petroleumsloven § 3-9 første ledd.Forlengelse av gyldighetsperiode1877601.11.2024PGNiG Upstream Norway AS har, i henhold til generalforsamlingsvedtak av 26.09.2024, endret foretaksnavn til ORLEN Upstream Norway AS.Navnendring operatør1877501.11.2024PGNiG Upstream Norway AS har, i henhold til generalforsamlingsvedtak av 26.09.2024, endret foretaksnavn til ORLEN Upstream Norway AS.Navnendring rettighetshaver1961901.10.2025Energidepartementet bekrefter i brev datert 30.09.2025 at utvinningstillatelse 1055 anses som bortfalt med virkning fra og med 14.08.2025, jf. utvinningstillatelsens pkt. 4 c) og departementets vedtak om fristforlengelse 25.04.2025Bortfall av tillatelse