Export:
PDF
PDF-
General information (in Norwegian only)
General information (in Norwegian only) Tillatelse1102 CGyldig fra dato15.08.2025Gyldig til dato19.02.2030NPDID for utvinningstillatelser38724118 -
Operatorship — current (in Norwegian only)
Operatorship — current (in Norwegian only) SelskapEquinor Energy AS -
Owner — current (in Norwegian only)
Owner — current (in Norwegian only) SelskapAndel [%]Equinor Energy AS50.00000DNO Norge AS30.00000Aker BP ASA20.00000 -
Mortgages from the Petroleum register – current (in Norwegian only)
Mortgages from the Petroleum register – current (in Norwegian only) Ingen heftelser registert. -
Notifications from the Petroleum register – full history (in Norwegian only)
Notifications from the Petroleum register – full history (in Norwegian only) Dokument nummerRegistreringsdatoUtdrag av dokumentType1958718.08.2025Tillatelsen er innført i petroleumsregisteretNy tillatelse1959708.09.2025Operatørskapet er overført fra Aker BP ASA til Equinor Energy AS, i henhold til vedtaksbrev fra Energidepartementet datert 15.08.2025, jf. petroleumsloven § 3-7 andre ledd.Operatørskifte1959308.09.2025Aker BP ASA har overdratt en 35% andel i tillatelsen til Equinor Energy AS. Iht. skjøte er gjennomføringsdato 29.08.2025 og virkningsdato 01.01.2025.Overdragelse av tillatelse eller andel i tillatelse1985918.12.2025Sval Energi AS har, i henhold til generalforsamlingsvedtak av 17.12.2025, endret foretaksnavn til DNO Norge AS.Navnendring rettighetshaver1974018.12.2025DNO Norge AS og Sval Energi AS har fusjonert 17.12.2025. Alle andeler i DNO Norge AS er overtatt av Sval Energi AS. Energidepartementet har samtykket til fusjonen i brev datert 12.09.2025, jf. petroleumsloven § 10-12.Overdragelse av tillatelse eller andel i tillatelse