Export: PDF
-
General information (in Norwegian only)
General information (in Norwegian only) Tillatelse630 BSGyldig fra dato10.02.2017Gyldig til dato01.01.2021NPDID for utvinningstillatelser28941890 -
Operatorship — current (in Norwegian only)
Operatorship — current (in Norwegian only) -
Owner — current (in Norwegian only)
Owner — current (in Norwegian only) SelskapAndel [%] -
Mortgages from the Petroleum register – current (in Norwegian only)
Mortgages from the Petroleum register – current (in Norwegian only) Ingen heftelser registert. -
Notifications from the Petroleum register – full history (in Norwegian only)
Notifications from the Petroleum register – full history (in Norwegian only) Dokument nummerRegistreringsdatoUtdrag av dokumentType1153915.03.2017Tillatelsen er innført i Petroleumsregisteret.Ny tillatelse1201015.11.2017I henhold til endringsavtale datert 17.3.2017 og godkjenningsbrev fra OED datert 31.5.2017 har Idemitsu Petroleum Norge AS, Engie E&P Norge AS og Capricorn Norge AS trådt ut av utvinningstillatelsen med virkning fra 10.2.2017. Statoil Petroleum AS har fra samme tidspunkt overtatt deltakerandelene til de selskapene som har trådt ut.Endring i tillatelse (beholdes av historiske grunner)1227103.01.2018Statoil Petroleum AS har overdratt sin 40 % andel i tillatelsen til Wellesley Petroleum AS. Iht. skjøte er gjennomføringsdato 29.12.2017 og virkningsdato 1.4.2017.Endring i tillatelse (beholdes av historiske grunner)1298416.05.2018Statoil Petroleum AS har endret navn til Equinor Energy AS fra 16.5.2018Andre meldinger1576304.01.2021Olje- og energidepartementet bekrefter i brev datert 17.12.2020 at utvinningstillatelse 630 BS anses som oppgittt med virkning fra 2.1.2021, jf. petroleumsloven § 3-15Andre meldinger